HomeMy Public PortalAboutLTC 172 A -2022 A Attachment MOT-96th Street-Mobile Crane__Z6. _
tit' . •�
Pit
- 1.2 OFFICERS AT EACH
' INTERSECTION DURING PEAK
HOURS (7AM-9PM)-
-DURING EMERGENCY VEHICLE
PASSING, OFFICERS TO CLEAR ONE
LANE OUT SO VEHICLE CAN PASS
i 1 1 + } p
`x flm Cw v.n ow
, rw..W A sxmr.
Iw c.. r••a . rw& e.0 r...e.n.u.. ww+..a
01r CqM►:/AMC]. C..�w/7y1�,
s.ewr 294
h. — 4.6% —
PRAhk BY MB
B R
1. MOT Plans
Michael Digitally signed
by Michael Budin
B u d•n Date: 2022.10.19
13:55:23-•04'00'
"These plans have been prepared in accordance with the current
version of the Manual of Uniform Standards for Design, Construction
& Maintenance for Streets and Highways, State of Florida and are in
compliance with the standards therein except as noted on the plans.
Any deviations noted on the plans substantially comply with the intent
of the standards!
(Signature of Engineer
Florida PE No: U 72969
Date:
PROJECT NAME: BAL HOURBOUR SHOPS
CHANNELL3IN6 bCVICE_5PACING
TAPER LENGTH 'L_
wlr_
Wa.
zani'
c.r... ,+ rr. i � T..y'
I'wr41,41 A
iwrM tnfpA e•
-
1
F•TABLE
3
TAALE 4 '
WORK ZONE SIGN SPAON_G -X'
BUFFER LENGTH
'jr
_
Ira
SITE LOCATION: 96TH STREET
f
A