Loading...
HomeMy Public PortalAboutOLD HWY 80_921 (4)LOT 3 SWALE "A" 50 LF SWALE AT 2% IFG 6.4 DNF FLAG #1 DRIVE TO BE CONSTRUCTED OF PERMEABLE MATERIALS AND BE 25' WIDE ( TOTAL MAX AT RIGHT OF WAY LINE ) OR AS PER CITY OF TYBEE ISLAND ORDINANCES - REFER TO TYBEE PLANNING AND ZONNING DEPARTMENT FOR DRIVEWAY OPTIONS \ \ \ \ \ \ \ \ \ �\ \ \ \ \ \ \ \\ DNF FLAG #2 \ \ \ \ \ \ \ \ \ \ \\ \\ \\\\\\\\\\ \\ \ \ \\&\\\\\\\\\N\ \\ BEN NAIL IN P/P ELEV 8.45 NAVD 1988 OELEC.BOX \\` \ \ \ \ \N\\\\\ \ \ \ \ \ \\ \1\ \ \ \ \\ \\\\\\\\.\\\\\\\\\\\\\\\\\ \. \ \ \N \\ � \\N\\\'\\\\A\\\\\.\\A\\\\ \ \` \\ \\ \\ \\��\ \ \ \ \ \ \ \ \ \ \\ \;\ \\ \ \\\\\\ \ \ \� \\ � \ \ \ \ \\ \ \ \ \\ \\ \ \ \ \\ \ \ \ \ \ \ \\ NN \ \ \\ \ \ \ \ \\ (o'i )(,), \\ N \ \\\ \\;\ ROOF PLAN ELEVATIONS SHOWN ON PLANS SWALE DETAIL not to scde +° • • • • • 2 • 2. • 7.5' DRAINAGE & UTILITY • SPECIAL AVERAGE GRADE NOTES : I . THE AVERAGE GRADE TO BE USED AS A BASE ELEVATION TO SET THE BUILDING HEIGHT IS TO BE OBTAINED FROM THE TYBEE ISLAND PLANNING AND ZONING DEPARTMENT. SPECIAL BUILDING GUTTER NOTES : I . A BUILDING GUTTER SYSTEM AS SHOWN ON THE PLANS SHALL BE UTILIZED TO ENSURE THAT ALL ROOF RUN -OFF IS DIRECTED TO THE TYBEE ISLAND RIGHT OF WAY. 2. BUILDING DESIGNER SHALL SIZE GU1 I ER SYSTEM TO CONVEY A 25 YEAR (MIN) STORM EVENT (8" PER HOUR). 3. INCREASED STORM WATER RUN -OFF DUE TO NEW IMPERVIOUS AREAS WILL NOT BE ALLOWED TO IMPACT ADJACENT PROPERTIES. 4. CONSULT TYBEE ISLAND PLANNING AND ZONING DEPARTMENT REGARDING REQUIREMENTS OF GUTTERS, DOWNSPOUTS AND DOWNSPOUT BOOTS AND HOW BUILDING SET BACK LINES ARE IMPACTED BY THE GU (1 ER AND DOWNSPOUT SYSTEM PRIOR TO CONSTRUCTION. FG 5.51 STREAM BUFFER ENCROACHMENT NOTES : 1. NEW STRUCTURES ON THIS PROJECT DO NOT ENCROACH IN THE 25 OR 50 FOOT STREAM BUFFER. 2. NON- EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50 FOOT STREAM BUFFER AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST OBTAINING THE NECESSARY VARIANCES AND PERMITS. 5.I1 PROPOSED SITE PLAN 1" = IO' GENERAL DRAINAGE NOTES: I . THE SITE WILL NEED TO BE GRADED AS SHOWN AND AS DIG IATED BY EXISTING CONDITIONS WHICH CAN NOT BE FORSEEN TO ALLOW FOR PROPER DRAINAGE. 2. OUTFALL FOR THE PROJECT WILL BE DICTATED BY EXISTING CONDITIONS WITHIN THE CITY OF TYBEE EXISTING DRAINAGE SYSTEM AND EASEMENTS. GENERAL BUILDING INFORMATION NOTES: I . PROPOSED BUILDING FINISHED FLOOR ELEVATIONS ARE TO BE SET AS PER FEMA FLOOD STUDY MAPS AND AS PER THE CITY OF TYBEE ISLAND, GEORGIA ORDINANCES. 2. PROPOSED BUILDINGS ARE TO BE SUPPORTED ON PIERS OR FOUNDATIONS WHICH WILL SATISFY FEMA ELEVATION AND FEMA ZONE REQUIREMENTS AS WELL AS TYBEE ISLAND REQUIREMENTS. SPECIAL AE AND VE ZONE NOTES : I . BUILDINGS IN "AE" ZONES ARE TO HAVE THE FINISHED FLOOR SET A MINIMUM OF I' ABOVE FLOOD. 2. BUILDINGS IN "VE" ZONES ARE TO HAVE THE LOWEST HORIZONTAL STRUCTURAL MEMBER SET A MINIMUM OF I' ABOVE FLOOD. 3. BUILDINGS IN AE AND VE ZONES ARE TO HAVE ALL ELECTRICAL, PLUMBING, HVAC, DUCTWORK AND OTHER EQUIPMENT TO BE A MINIMUM OF I' ABOVE FLOOD. 4. FLOOD VENTS ARE REQUIRED IN "AE" ZONES AND ARE TO HAVE I SQUARE INCH / SQUARE FOOT OF FLOOR PLAN AREA WITH A MINIMUM ROUND OPENING OF 3 ", A MINIMUM OF 2 OPENINGS WITH ALL OPENINGS EVENLY SPACED AROUND PERIMETER. BOTTOM OF OPENING SHALL BE I 2" OR LESS ABOVE ADJACENT GRADE. 5. BREAK AWAY WALLS ARE REQUIRED IN "VE" ZONES. C. COORDINATE SITE WORK AND FINISHED FLOOR ELEVATIONS WITH ARCHITECTURAL PLANS TO MAKE SURE BUILDING ELEVATIONS ARE SET AS PER CODE. Special Pre - Construction Note : Contractor to verify all existing and proposed structure locations (drainage, sanitary, etc.), tops and depths prior to ordering materials or beginning construction. FEMA MAP NOTES : I . THIS DEVELOPMENT IS WITHIN MINIMAL ZONING AREA "AE-1 I " ACCORDING TO F.I.R.M. COMMUNITY PANEL NUMBER I 305 1 C 02 13 F, MAP REVISED SEPTEMBER 26, 2008 (88 DATUM). 2. CONTRACTOR IS TO VERIFY FEMA ELEVATIONS PRIOR TO ANY CONSTRUCTION ACTIVITIES. SPECIAL BUILDING SET BACK LINE NOTES : I . THE BUILDING OUTLINE SHOWN ON THE FLANS IS ASSUMING THE MOST OUTSIDE PART OF THE BUILDING. 2. THE MOST OUTSIDE PART OF THE BUILDING INCLUDES ALL SIDING, SHUTTERS, GU TIERS, DOWNSPOUTS, DOWNSPUT BOOTS, TRIM WORK OF ANY KIND OR TYPE OF COVERING OR AESTETIC PART OF THE BUILDING. 3. CONTRACTOR IS TO COORDINATE BUILDING WITH THE OWNER AND ARCHITECT TO MAKE SURE THAT NO PART OF THE BUILDING, WITH THE EXCEPTION OF THE OVERHANG, PROTRUDES OUTSIDE OF THE BUILDING SET BACK LINE VERTICALLY FROM THE GROUND LINE TO THE BOTTOM OF THE ROOF OVERHANG. GUTTER SYSTEM IS TO BE INCLUDED AS PART OF THE ALLOWED OVERHANG. 4. CONSULT THE TYBEE PLANNING AND ZONING DEPARTMENT FOR BUILDING SET BACK LINE REQUIREMENTS IF A GUTTER SYSTEM IS UTILIZED AND FOR DOWNSPOUTS, DOWNSPOUT BOOTS, FIREPLACES, ELEVATOR SHAFTS, ROOF DECKS, STAIRS AND AC COMPRESSORS. 5. CONSULT THE TYBEE PLANNING AND ZONING DEPARTMENT FOR BUILDING SET BACK LINE REQUIREMENTS If A SPREAD FOOTING IS USED. C. CERTIFICATE OF OCCUPANCY WILL NOT BE GRANTED IF ANY PART OF THE BUILDING (INCLUDING SIDING, SHU I i-ERS, GUTTERS, DOWNSPOUTS, DOWNSPOUT BOOTS, TRIM, WATER TABLE OR ANY AESTECTIC WORK, ETC.) EXTENDS OVER THE BUILDING SET BACK LINE WITHOUT A VARIANCE. LEGEND ITEM TOPO CONTOURS DRAINAGE FLOW ARROWS TOP OF PARKING SLAB EXISTING PROPOSED FG 12.3 s12 -Wile-- - -- TPS 12.30 EASEMENT NOTES: 1. THE OWNER, ENGINEER AND SURVEYOR ARE TO COORDINATE ALL EASEMENTS PRIOR TO FINAL PLAT APPROVAL AND RECORDING. 2. ALL DRAINAGE EASEMENTS TO BE PRIVATELY MAINTAINED. NOTES: I . CONTRACTOR IS TO COORDINATE ALL GAS, LIGHTING, ELECTRICAL, PHONE, CABLE AND ANY OTHER REQUIRED UTILITIES WITH THE APPROPRIATE UTILITY AGENCIES. 2. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO COMMENCING OF CONSTRUCTION ACTIVITIES AND FOR AVOIDING CONFLICT WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR. 3. CONTRACTOR IS TO COORDINATE ALL DEMOLITION WORK WITH THE OWNER. ALL ITEMS NOT TO BE RELOCATED OR GIVEN TO THE OWNER WILL BECOME THE PROPERTY OF THE CONTRACTOR. 4. REMOVE ALL UNDERGROUND UTILITIES NOT TO BE UTILIZED. . DO NOT ABANDON UTILITIES IN PLACE. 5. REMOVE ALL TREES AS NECESSARY FOR PROPOSED CONSTRUC, I ION. G. PREVENT DAMAGE TO EXISTING TREES WHERE POSSIBLE. X TREES TO BE REMOVED. TRAFFIC AND RIGHT -OF -WAY NOTES: I . ALL ROAD CLOSINGS, DETOURS AND ETC. ARE TO BE COORDINATED WITH THE CITY OF TYBEE ISLAND, GEORGIA PERSONNEL. 2. ANY AND ALL NECESSARY PERMITS MUST BE OBTAINED FROM THE CITY OF TYBEE ISLAND PRIOR TO COMMENCEMENT OF ANY WORK WITHIN RIGHT -OF -WAY. SPECIAL CONSTRUCTION NOTE: IF THE CONTRACTOR KNOWS OR CAN REASONABLY BE EXPECTED TO HAVE KNOWN OF AN ERROR, DISCREPANCY OR CONFLICT IN THE PLANS, SPECIFICATIONS OR CONSTRUCTION STAKING AND FAILS TO REPORT THE PROBLEM PRIOR TO CONSTRUCTION, HE SHALL NOT BE ENTITLED TO COMPENSATION FOR ANY WORK OR EXPENSE INCURRED BY HIM FOR WORK REQUIRED TO BE RE- CONSTRUCTED BECAUSE OF SAID ERROR, DISCREPANCY OR CONFLICT. Survey Information : Survey : Reynolds Surveying Date of Survey : Dec. 2012 Datum : NAVD 1 988 SCALE: I " = 10' 10' 20' 25' (-5 iU) U Ii1 U) CIS 1'1 n 1 LL1 U) 0 as Z 0 I- . 0 o co O CO d �r- J}c`i -1. W Qc r,;(5) =0 =N .Ld D 0(.9 _� I--=Oa c Z � ` LL (D (/) W _I W J - QOm J< d Zc\- J U W 0) O U) W COI;TACT A MINIMUM OF 72 HOURS PRIOR TO DIGGING UTILITIES PROTECTION CENTER 1- 800 - 282 -7411 DRAWING NUMBER 2 OF 6 SHEETS BENCHMARK_ NAIL IN P/P ELEV 8.45 NAVD 1988 GMAli +' d .- oELECC,BOX +(0 +10 �4 0 0 LOT 3 15-_.„; urn 7.5 O D BOOS _...- / / 1 / 1 r LOT 2 p3" p DNF FLAG #1 \ \ \ \�l \ \. \ \ \ \\ \ \ \\); \ \ \ \ \ \ \ \ CO +`O TITTT' 'LAG #2 + \\ \ \ \\ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \\ \ \\ \ \ \ \\ \ \ \ \ \ \ \\ \ \\ \ \\ \ I\ \ \ \ \\ \ \ \ \ \ \, \ \ \ \ \ \ \ \\\\\ \ \ \ \ \\ \ \\ \\ \. \\ \\ \ \\ \ ; \ \ \\\ \\ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \� \ \ \ \ \ \ . \ \\\ \ \ \ \ \ \ \ \ \\ \ \ \\ \ \ \ \ \ \ \\` \ \. \\ \ \ \\ \ \\,, ; \\ \\\1 \ \\\ \\\\ \\ \ \\ \\ \ \\\:\\q\\:\\;\\:\\\\,\\\2.\...\..\ \ \\ . D NR \LG #6 \� \ \ \ � ((> N \ \\ \\ - • se \e .\.- \ , \\ \ DNR DNR FLAG #4 DNR FLAG #5 LEGEND NEW -SD- -SS- W • H • fff -o- I.E.4.13 10' BSL 0 +" ° EXISTING SITE PLAN 1 "= 10' O DNR FLAG #7 7.5' DRAAD(&GE & UTILITY MOINE S 26 °16'37 "W 204.52' SPECIAL BUILDING SET BACK LINE NOTES : 1 . THE BUILDING OUTLINE SHOWN ON THE PLANS 15 ASSUMING THE MOST OUTSIDE PART OF THE BUILDING. 2. THE MOST OUTSIDE PART OF THE BUILDING INCLUDES ALL SIDING, SHU rI ERS, GUTTERS, DOWNSPOUTS, DOWNSPUT BOOTS, TRIM WORK OF ANY KIND OR TYPE OF COVERING OR AESTETIC PART Of THE BUILDING. 3. CONTRACTOR IS TO COORDINATE BUILDING WITH THE OWNER AND ARCHITECT TO MAKE SURE THAT NO PART OF THE BUILDING, WITH THE EXCEPTION OF THE OVERHANG, PROTRUDES OUTSIDE OF THE BUILDING SET BACK LINE VERTICALLY FROM THE GROUND LINE TO THE BOI 10M OF THE ROOF OVERHANG. GUTTER SYSTEM IS TO BE INCLUDED AS PART OF THE ALLOWED OVERHANG. 4. CONSULT THE TYBEE PLANNING AND ZONING DEPARTMENT FOR BUILDING SET BACK LINE REQUIREMENTS IF A GUTTER SYSTEM IS UTILIZED AND FOR DOWNSPOUTS, DOWNSPOUT BOOTS, FIREPLACES, ELEVATOR SHAFTS, ROOF DECKS, STAIRS AND AC COMPRESSORS. 5. CONSULT THE TYBEE PLANNING AND ZONING DEPARTMENT FOR BUILDING SET BACK LINE REQUIREMENTS IF A SPREAD FOOTING IS USED. 6. CERTIFICATE OF OCCUPANCY WILL NOT BE GRANTED IF ANY PART OF THE BUILDING (INCLUDING SIDING, SHUTTERS, GUTTERS, DOWNSPOUTS, DOWNSPOUT BOOTS, TRIM, WATER TABLE OR ANY AESTECTIC WORK, ETC.) EXTENDS OVER THE BUILDING SET BACK LINE WITHOUT A VARIANCE. NOTES: 1. CONTRACTOR I5 TO COORDINATE ALL GAS, LIGHTING, ELECTRICAL, PHONE, CABLE AND ANY OTHER REQUIRED UTILITIES WITH THE APPROPRIATE UTILITY AGENCIES. 2. CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO COMMENCING OF CONSTRUCTION ACTIVITIES AND FOR AVOIDING CONFLICT WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR. 3. CONTRACTOR IS TO COORDINATE ALL DEMOLITION WORK WITH THE OWNER. ALL ITEMS NOT TO BE RELOCATED OR GIVEN TO THE OWNER WILL BECOME THE PROPERTY OF THE CONTRACTOR. 4. REMOVE ALL TREES AS NECESSARY FOR PROPOSED CONSTRUCTION. X TREES TO BE REMOVED TRAFFIC AND RIGHT -OF -WAY NOTES: I . ALL ROAD CLOSINGS, DETOURS AND ETC. ARE TO BE COORDINATED WITH THE CITY OF TYBEE ISLAND, GEORGIA PERSONNEL. 2. ANY AND ALL NECESSARY PERMITS MUST BE OBTAINED FROM THE CITY OF TYBEE ISLAND PRIOR TO COMMENCEMENT OF ANY WORK. 3. CONTRACTOR IS TO OBTAIN A R.O.W. PERMIT PRIOR TO PERFORMING ANY WORK WITHIN THE CITY OF TYBEE ISLAND RIGHT -OF -WAY. 4. CHLORINATED DISINFECTED WATER SHALL NOT BE DISCHARGED INTO THE STORMWATER SYSTEM. SPECIAL F.F. NOTES ; I . CONTRACTOR TO VERIFY FEMA ELEVATIONS PRIOR TO ANY CONSTRUCTION ACTIVITIES AND COORDINATE WITH GOVERNING AGENCY REQUIREMENTS. 2. CONTRACTOR TO COORDINATE FINISH FLOOR ELEVATIONS WITH STRUCTURAL, ARCHITECTURAL AND M.E.P. PLANS. TW 16.83 TP 14.65 FG 16.1 TS 16.10 TG 16.10 TC 16.10 SPECIAL AVERAGE GRADE NOTES : I . THE AVERAGE GRADE TO BE USED AS A BASE ELEVATION TO SET THE BUILDING HEIGHT IS TO BE OBTAINED FROM THE TYBEE ISLAND PLANNING AND ZONING DEPARTMENT. SPECIAL AE AND VE ZONE NOTES : I . BUILDINGS IN "AE" ZONES ARE TO HAVE THE FINISHED FLOOR SET A MINIMUM OF I ABOVE FLOOD. 2. BUILDINGS IN "VE" ZONES ARE TO HAVE THE LOWEST HORIZONTAL STRUCTURAL MEMBER SET A MINIMUM OF I' ABOVE FLOOD. 3. BUILDINGS IN AE AND VE ZONES ARE TO HAVE ALL ELECTRICAL, PLUMBING, HVAC, DUCTWORK AND OTHER EQUIPMENT TO BE A MINIMUM OF I' ABOVE FLOOD. 4. FLOOD VENTS ARE REQUIRED IN "AE" ZONES AND ARE TO HAVE I SQUARE INCH / SQUARE FOOT OF FLOOR PLAN AREA WITH A MINIMUM ROUND OPENING OF 3 ", A MINIMUM OF 2 OPENINGS WITH ALL OPENINGS EVENLY SPACED AROUND PERIMETER. BOTTOM OF OPENING SHALL BE 12" OR LESS ABOVE ADJACENT GRADE. 5. BREAK AWAY WALLS ARE REQUIRED IN "VE" ZONES. 6. COORDINATE SITE WORK AND FINISHED FLOOR ELEVATIONS WITH ARCHITECTURAL PLANS TO MAKE SURE BUILDING ELEVATIONS ARE SET AS PER CODE. GEORGIA D.O.T. NOTES: I . ANY AND ALL WORK WITHIN ANY GEORGIA D.O.T. RIGHT -OF -WAYS MUST BE APPROVED AND PERMITTED THROUGH THE GEORGIA D.O.T. EXISTING DESCRIPTION BUILDING RESURFACE ASPHALT PAVEMENT ASPHALT PAVEMENT TYPE I ASPHALT PAVEMENT TYPE I I CONCRETE PAVEMENT CONCRETE SIDEWALK STORM DRAIN LINE - ss - SANITARY SEWER LINE - w - WATER LINE O SANITARY SEWER MANHOLE G ' V® GAS VALVE w. V8 WATER VALVE W.M. WATER METER I.E.4.13 X IPF 0 FIRE HYDRANT SIGN FLARED END SECTION SPOT ELEVATION CONTOUR INVERT ELEVATION CHAIN LINK FENCE DITCH INVERT PROPERTY LINE IRON PIN FOUND TOP OF WALK TOP OF PAVEMENT FINISHED GRADE TOP OF STONE TOP OF GUTTER TOP OF CURB Project Information: P.I.N. : 4- 0026- 08 -00G ADDRESS : 92 1 Old U.S. Highway 80 ZONING : C -2 SITE SIZE : 0.30 ACRES ESTIMATED DISTURBED AREA : 0.04 ACRES OWNER : William G. Rusher, Jr. OWNER ADDRESS : 47% Lambs Road Charleston, SC 29418 PHONE : 843- 552 -2655 PEMA MAP NOTES : 1. THIS DEVELOPMENT IS WITHIN MINIMAL ZONING AREA "AE- I I" ACCORDING TO F.LR.M. COMMUNITY PANEL NUMBER 1 305 I C 0213 F, MAP REVISED SEPTEMBER 26, 2008 (88 DATUM). 2. CONTRACTOR 15 TO VERIFY PEMA ELEVATIONS PRIOR TO ANY CONSTRUCTION ACTIVITIES. Survey Information : Survey : Reynolds Surveying Date of Survey : Dec. 20I 2 Datum : NAVD 1988 SCALE: 1" = 10' 10' 20' 25' SPECIAL CONSTRUCTION NOTE: IF THE CONTRACTOR KNOWS OR CAN REASONABALY BE EXPECTED TO HAVE KNOWN OF AN ERROR, DISCREPANCY OR CONFLICT IN THE PLANS, SPECIFICATIONS OR CONSTRUCTION STAKING AND FAILS TO REPORT THE PROBLEM PRIOR TO CONSTRUCTION, HE SHALL NOT BE ENTITLED TO COMPENSATION FOR ANY WORK OR EXPENSE INCURRED BY HIM FOR WORK REQUIRED TO BE RE- CONSTRUCTED BECAUSE OF SAID ERROR, DISCREPANCY OR CONFLICT. 0 ifrj w Z • (Y} O O (f) < O � U? O co CO z Q N (f) 0 z m 0 = ca TQ Q December 18. 2012 6 z C:21 0 1. 0 F U 0 00 0c0 < �r w < 0 wN • =o D �LL Z D (� ° o 0 w U) U7 0`_ Q -J 4 0w �< _m Z N I- W O) 0 U) W EXISTING SITE PLAN :TACT A MINIMUM 72 HOURS PRIOR TO Dii.GING Qaa r o S PROTECTION CEN1i.R 1- 800 - 282 -7411 DRAWING NUMBER c-1 1 OF 6 SHEETS Ii i I I i 0 ifrj w Z • (Y} O O (f) < O � U? O co CO z Q N (f) 0 z m 0 = ca TQ Q December 18. 2012 6 z C:21 0 1. 0 F U 0 00 0c0 < �r w < 0 wN • =o D �LL Z D (� ° o 0 w U) U7 0`_ Q -J 4 0w �< _m Z N I- W O) 0 U) W EXISTING SITE PLAN :TACT A MINIMUM 72 HOURS PRIOR TO Dii.GING Qaa r o S PROTECTION CEN1i.R 1- 800 - 282 -7411 DRAWING NUMBER c-1 1 OF 6 SHEETS DRIVE TO BE CONSTRUCTED OF PERMEABLE MATERIALS AND BE 25' WIDE ( TOTAL MAX AT RIGHT OF WAY LINE ) OR AS PER CITY OF TYBEE ISLAND ORDINANCES - REFER TO TYBEE PLANNING AND ZONNING DEPARTMENT FOR DRIVEWAY OPTIONS MATCH EXT'G PAVING ELEVATION FG 7.2 EEO LOT 3 FG 7.0 SWALE "A" - 50 LF SWALE AT 0.6% FG 6.9 DNF FLAG #1 - - - ._....►�►�►�►���@���@�@�� ����I @I,I,I,IIIIII�I,I @I;I,I @I �IIIIIIII /III��II/IIIt''I�''�I��IIIII p•75�° ��� %���% ICI ��I�� • vita ��i��I����I���� ►��I�,��i ►@ @v @ @@O: ►►h@@) @@�@,@,, @,.@m�!,,iIt t•g • ►. �������)�� **�SVAWN 4��� : III C5 moo a F-' TP 7.31 olows - - -- I___ • O TP 3 ^" V N mow (3) 2' r -�- \ \ \ \ \\ �, •. \ \ \\A \\\\ \ \ \ \ \ \\ \ \ \\ N\\-\\ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ k \\ \ \ \,\ \; \ \ \\ ; \\ \\ . ' \\\ \ \ \ \ \ \ \.\ ,\ \\ \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \1,\ \\\\ \\\\\ k\\ \\ \ \\ \ \ \� \\ \\ \ � 1 \&\\\ , \\\ \ N \ \ \. \1 \ \ \ \ \I \ \ \ \\ \\ \ \ \ \\ \ \ \ \ ,, \\ \\\\ \ \ \ \ \ \\\\ \\ \ \ \\ \ \ \ \\ DNF FLAG #2 MATCH EXPG PAVING ELEVATION BEN NAIL IN P/P ELEV 8.45 NAVD 1988 DNR ...►q- VIII IlJIft* ��I II<'��� Av*., 'fff(4444%%%%44ssff I . 1 '7 T'o 1 1 TP 7.35 OEL C.BOX +° SPECIAL AVERAGE GRADE NOTES : THE AVERAGE GRADE TO BE USED AS A BASE ELEVATION TO SET THE BUILDING HEIGHT IS TO BE OBTAINED FROM THE TYBEE ISLAND PLANNING AND ZONING DEPARTMENT. +° SPECIAL BUILDING GUI I'M NOTES : I . A BUILDING GU 1 1 ER SYSTEM AS SHOWN ON THE PLANS SHALL BE UTILIZED TO ENSURE THAT ALL ROOF RUN -OFF 15 DIRECTED TO THE TYBEE ISLAND RIGHT Of WAY. 2. BUILDING DESIGNER SHALL SIZE GU I I ER SYSTEM TO CONVEY A 25 YEAR (MIN) STORM EVENT (8" PER HOUR). 3. INCREASED STORM WATER RUN -OFF DUE TO NEW IMPERVIOUS AREAS WILL NOT BE ALLOWED TO IMPACT ADJACENT PROPERTIES. 4. CONSULT TYBEE ISLAND PLANNING AND ZONING DEPARTMENT REGARDING REQUIREMENTS OF GUTTERS, DOWNSPOUTS AND DOWNSPOUT BOOTS AND HOW BUILDING SET BACK LINES ARE IMPACTED BY THE GUI I ER AND DOWNSPOUT SYSTEM PRIOR TO CONSTRUCTION. STREAM BUFFER ENCROACHMENT NOTES : 1. NEW STRUCTURES ON THIS PROJECT DO NOT ENCROACH IN THE 25 OR 50 FOOT STREAM BUFFER. 2. NON- EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50 FOOT STREAM BUFFER AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST OBTAINING THE NECESSARY VARIANCES AND PERMITS. DNR FLAG #4 NEW 8' WIDE DECK DNR FLAG #5 \\ ' ' \ \\ \ \ \ \ \\ \\\ \ \ \ \ \ ,� \\ \\\ e \\ \ \ \ttio\\\\ \\\\\ NR FLAG #6 70 \ \\ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \\\ \ \ \ \\ \ \\\ \\ \�\\ \ • ' \, \\ • \ -n ■ 0 oN 0' BSL \ \\\ \ \ \\ \ \ \ \ \\\ • EXISTING GRADE VARIES DNR FLAG #7 +�o • rn \ \ \ \� \ \ \\ 7.5' DRAINAGE & UTILITY .'..i 1A ROOF PLAN 2.0'_ VARIES 1 1r, ELEVATIONS SHOWN ON PLANS SWALE DETAIL not to scale FG 6.31 FG 6.21 --1FG 6. 11 SWALE "A" 50 LF SWALE AT 0.6% • FG 6.01 PROPOSED SITE PLAN 1 "= 10' GENERAL DRAINAGE NOTES: 1 . THE SITE WILL NEED TO BE GRADED AS SHOWN AND AS DICTATED BY EXISTING CONDITIONS WHICH CAN NOT BE FORSEEN TO ALLOW FOR PROPER DRAINAGE. 2. OUTFALL FOR THE PROJECT WILL BE DICTATED BY EXISTING CONDITIONS WITHIN THE CITY OF TYBEE EXISTING DRAINAGE SYSTEM AND EASEMENTS. GENERAL BUILDING INFORMATION NOTES: I . PROPOSED BUILDING FINISHED FLOOR ELEVATIONS ARE TO BE SET AS PER FEMA FLOOD STUDY MAPS AND AS PER THE CITY OF TYBEE ISLAND, GEORGIA ORDINANCES. 2. PROPOSED BUILDINGS ARE TO BE SUPPORTED ON MFRS OR FOUNDATIONS WHICH WILL SATISFY FEMA ELEVATION AND FEMA ZONE REQUIREMENTS AS WELL AS TYBEE ISLAND REQUIREMENTS. SPECIAL AE AND VE ZONE NOTES : I . BUILDINGS IN "AE" ZONES ARE TO HAVE THE FINISHED FLOOR SET A MINIMUM OF I' ABOVE FLOOD. 2. BUILDINGS IN "VE" ZONES ARE TO HAVE THE LOWEST HORIZONTAL STRUCTURAL MEMBER SET A MINIMUM OF I' ABOVE FLOOD. 3. BUILDINGS IN AE AND VE ZONES ARE TO HAVE ALL ELECTRICAL, PLUMBING, HVAC, DUCTWORK AND OTHER EQUIPMENT TO BE A MINIMUM OF I' ABOVE FLOOD. 4. FLOOD VENTS ARE REQUIRED IN "AE" ZONES AND ARE TO HAVE I SQUARE INCH / SQUARE FOOT OF FLOOR PLAN AREA WITH A MINIMUM ROUND OPENING OF 3 ", A MINIMUM OF 2 OPENINGS WITH ALL OPENINGS EVENLY SPACED AROUND PERIMETER. BOTTOM OF OPENING SHALL BE 12" OR LESS ABOVE ADJACENT GRADE. 5. BREAK AWAY WALLS ARE REQUIRED IN "VE" ZONES. 6. COORDINATE SITE WORK AND FINISHED FLOOR ELEVATIONS WITH ARCHITECTURAL PLANS TO MAKE SURE BUILDING ELEVATIONS ARE SET AS PER CODE. Special Pre - Construction Note : Contractor to verify all existing and proposed structure locations (drainage, sanitary, etc.), tops and depths prior to ordering materials or beginning construction. FEMA MAP NOTES : I . THIS DEVELOPMENT 15 WITHIN MINIMAL ZONING AREA "AE -1 I " ACCORDING TO F.I.R.M. COMMUNITY PANEL NUMBER 1305 I C 02 13 F, MAP REVISED SEPTEMBER 26, 2008 (88 DATUM). 2. CONTRACTOR 15 TO VERIFY FEMA ELEVATIONS PRIOR TO ANY CONSTRUCTION ACTIVITIES. SPECIAL BUILDING SET BACK LINE NOTES : I . THE BUILDING OUTLINE SHOWN ON THE PLANS IS ASSUMING THE MOST OUTSIDE PART OF THE BUILDING. 2. THE MOST OUTSIDE PART OF THE BUILDING INCLUDES ALL SIDING, SHU I I-ERS, GUTTERS, DOWNSPOUTS, DOWNSPUT BOOTS, TRIM WORK OF ANY KIND OR TYPE OF COVERING OR AESTETIC PART OF THE BUILDING. 3. CONTRACTOR 15 TO COORDINATE BUILDING WITH THE OWNER AND ARCHITECT TO MAKE SURE THAT NO PART OF THE BUILDING, WITH THE EXCEPTION OF THE OVERHANG, PROTRUDES OUTSIDE OF THE BUILDING SET BACK LINE VERTICALLY FROM THE GROUND LINE TO THE BOTTOM OF THE ROOF OVERHANG. GU I I ER SYSTEM IS TO BE INCLUDED AS PART OF THE ALLOWED OVERHANG. 4. CONSULT THE TIME PLANNING AND ZONING DEPARTMENT FOR BUILDING SET BACK LINE REQUIREMENTS IF A GUTTER SYSTEM 15 UTILIZED AND FOR DOWNSPOUTS, DOWNSPOUT BOOTS, FIREPLACES, ELEVATOR SHAFTS, ROOF DECKS, STAIRS AND AC COMPRESSORS. 5. CONSULT THE TYBEE PLANNING AND ZONING DEPARTMENT FOR BUILDING SET BACK LINE REQUIREMENTS IF A SPREAD FOOTING'S USED. G. CERTIFICATE OF OCCUPANCY WILL NOT BE GRANTED IF ANY PART Of THE BUILDING (INCLUDING SIDING, SHU 1 I-ERS, GUTTERS, DOWNSPOUTS, DOWNSPOUT BOOTS, TRIM, WATER TABLE OR ANY AESTECTIC WORK, ETC.) EXTENDS OVER THE BUILDING SET BACK LINE WITHOUT A VARIANCE. LEGEND ITEM TOPO CON TOURS DRAINAGE FLOW ARROWS TOP OF PARKING SLAB EXISTING PROPOSED FG 12.3 -92 TPS 12.30 EASEMENT NOTES: 1. THE OWNER, ENGINEER AND SURVEYOR ARE TO COORDINATE ALL EASEMENTS PRIOR TO FINAL PLAT APPROVAL AND RECORDING. 2. ALL DRAINAGE EASEMENTS TO BE PRIVATELY MAINTAINED. NOTES: \(, - FINISHED GRADE MONIOM I . CONTRACTOR IS TO COORDINATE ALL GAS, LIGHTING, ELECTRICAL, PHONE, CABLE AND ANY OTHER REQUIRED UTILITIES WITH THE APPROPRIATE UTILITY AGENCIES. 2. CONTRACTOR 15 RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO COMMENCING OF CONSTRUCTION ACTIVITIES AND FOR AVOIDING CONFLICT WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR. 3. CONTRACTOR 15 TO COORDINATE ALL DEMOLITION WORK WITH THE OWNER. ALL ITEMS NOT TO BE RELOCATED OR GIVEN TO THE OWNER WILL BECOME THE PROPERTY OF THE CONTRACTOR. 4. REMOVE ALL UNDERGROUND UTILITIES NOT TO BE UTILIZED. DO NOT ABANDON UTILITIES IN PLACE. 5. REMOVE ALL TREES AS NECESSARY FOR PROPOSED CONSTRUCTION. G. PREVENT DAMAGE TO EXISTING TREES WHERE POSSIBLE. X TREES TO 5E REMOVED. TRAFFIC AND RIGHT -OF -WAY NOTES: 1 . ALL ROAD CLOSINGS, DETOURS AND ETC. ARE TO BE COORDINATED WITH THE CITY OF TYBEE ISLAND, GEORGIA PERSONNEL. 2. ANY AND ALL NECESSARY PERMITS MUST BE OBTAINED FROM THE CITY OF TYBEE ISLAND PRIOR TO COMMENCEMENT OF ANY WORK WITHIN RIGHT -OF -WAY. SPECIAL CONSTRUCTION NOTE: IF THE CONTRACTOR KNOWS OR CAN REASONABLY BE EXPECTED TO HAVE KNOWN OF AN ERROR, DISCREPANCY OR CONFLICT IN THE PLANS, SPECIFICATIONS OR CONSTRUCTION STAKING AND FAILS TO REPORT THE PROBLEM PRIOR TO CONSTRUCTION, HE SHALL NOT BE ENTITLED TO COMPENSATION FOR ANY WORK OR EXPENSE INCURRED BY HIM FOR WORK REQUIRED TO BE RE- CONSTRUCTED BECAUSE OF SAID ERROR, DISCREPANCY OR CONFLICT. Survey Information : Survey : Reynolds Surveying Date of Survey : Dec. 2012 Datum : NAVD 1988 SCALE: I " = 1 0' 10' 20' 25' N Z 0 W > 1 03 NASSAU D 0 d z d m XCO N J co()) W m Q 0 z0)m Q > d December 18. 2012 w 0 0 0 Z 0 1- UO co ocQ c- W - Q „; 0) • 0 N = CD (f) (f) Z D• W <o(.90 W • Q Q W Q - om Q z Nl'- U W 0 W PROPOSED SITE PLAN CONTACT A MINIMUM OF 72 HOURS PRIOR TO DIGGING :._ TES PROTECTION CENTER 1- 800 - 282 -7411 DRAWING NUMBER C-2 2 OF 6 SHEETS ..r b BENCIE� 2,$, NAIL IN P/P ELEV 8.45 NAVD 1988 D IDs Ds2 1 LIMITS OF I DISTURBANCE I,0T 3 /�� --S -- --■•rte D1-A • • 0'1 -1=-�- "..Bit 'an � , • (Co) • CIE 1 - 4 bt room 7 5* DII CIE DNF FLAG #1 DNF FLAG #2 1 1 1 u ---V- a 1 � 1 1 1 (?(9 1 i 1 +� 1 1 1 1 I 1 1 1 1 \)1 1 1 1 1 1 1 +° tf,,, ,Po"""7-r----- -�a... ° �� 1 1 L i o �i L v� oti L r ti � 1 1 urn--- I.GD -T LOO— LAD =1.m -- LAD -1 12— 74141@41417----_ -,-,------"AP-41°ar---- 1 11 1 11 1 1 IN Ds1 1 ' E5s 2 LOT 2 • l� 11 \\\\ \\\\\\\ / \\-\ DDNR FLAG #4 ' N \ N` ■ `� `N ■ \ `N `N `` N. �` ■ ■ \\ \ ■ DNR FLAG #5 �\ \ \ \ \ \ \ \ \ \ \ \ \\ --�..�% `N \N `. ���'�\ \ l\ \r'�"c "\ S D 1 "C . i\ \\i )\\\\\>\\\\\\\\x \ \. \\\ 2 ROWS STREAM BUFFER ENCROACHMENT NOTES : 1. NEW STRUCTURES ON THIS PROJECT DO NOT ENCROACH IN THE 25 OR 50 FOOT STREAM BUFFER. 2. NON— EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50 FOOT STREAM BUFFER AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST OBTAINING THE NECESSARY VARIANCES AND PERMITS. 011P OM Du -- -J- - -- DS l i LIMITS OF -i --__ DS2 DISTURBANCE I -- SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE I 1 " = 10' • `aT\ \' \ \\ 1,\ \\ \ .\ \ \t i101 \ _ \\ \ \ \\ \ \ \ DNR FLAG #6 \\II\\\\<tN\ \\\\\ \\ I 11).?.,L.La \\\....,.\\;\ situ :*7-1., 3 s cp KU \a \.\7&-k4-•\ \\ o~ LIMITS OF DISTURBANCE 1 FDNR FLAG #7""m ■'� i \ \ 2 \\ \\ 4_ 7.5' DRAINAGE & UTILITY EASEICEJ ,„ BMP REMOVAL NOTE : 1. RETROFITS, PERIMETER SILT FENCE AND CONSTRUCTION EXIT TO BE LEFT IN PLACE UNTIL FINAL STABILIZATION HAS OCCURED. �_ N `� N N . N�; �` ■ Erosion and Sediment Control Phasing Initial Phase (Phase l) 1. This phase shall include Silt fencing and construction exits and sediment and detention ponds to be installed prior to on} land disturbing activities to prevent sediment from leaving the site. Intermediate Phase (Phase 11) 1. This phase shall include construction of any outlet structures, retrofits, check dams, inlets protection and temporary grassing. Final Phase (Phase HO 1. This phase shall include outfall protection, any revised 1 inlet protection and any other permanent devices. SOIL EROSION LEGEND TEMPORARY SEDIMENT BARRIER TEMPORARY HAY BALES CONSTRUCTION EXIT MULCHING DISTURBED AREA STABILIZATION WITH TEMPORARY SEEDING DISTURBED AREA STABILIZATION WITH PERMANENT SEEDING WITH AREA STABILIZATION CHECK DAM SR3RM DRNNAGE OUTLET PROTECTION INLET SEDIMENT TRAP SEDIMENT TRAP GEOTEXTILE CHANNEL STABIUZATION VEGATATION ROCK RIP- CONCRETE RAP LEVEL SPREADER RETROFIT DUST CONTROL Drell n Ds3 Ds4 Sd2 Sd3 CGe CChh Du SPECIAL SOIL EROSION PREVENTION NOTES : 1. The state of Georgia requires that the initial soil erosion prevention measures shall be inspected by the designer within 7 days after installation. 2. It is the responsibility of the contractor to notify the soil erosion prevention plan designer within 7 dogs after the initial soil erosion measures are in place for inspection. 3. Soil erosion prevention plans shall be kept current and on site or readily accessible at all times during the duration of the project until after final stabilization has occurred. 4. Primary permlttee must provide a copy of the soil erosion prevention plans to each secondary permittee. 5. Contractor is to keep a record of his inspections of the soil erosion control measures to include at least the following: a. date and scope of the inspection b. name of person performing inspection c. major observations (including noncompliance incidents) Inspection reports are to be kept current and on site or readily accessible at all times during the duration of the project until after final stabilization has occurred. 6. Sampling of the outfall is the responsibility of the primary permittee and sampling requirements are to be as per the NPDES general permit. 7. Silt fencing is to remain in place until final stabiliazation. 8. Waste materials shall not be discharged to state waters except as authorized by a section 404 permit. 9. These ES & PC plans are in compliance with waste disposal, sanitary sewer and septic tank regulations. 10. Great care shall be token to prevent oil spills and leaks. In the event that a spill shall occur, stop the spill source immediately and implement BMP's and clean —up for the spill. WETLANDS NOTE: ALL WETLANDS ARE UNDER JURISDICTION OF THE CORPS OF ENGINEERS AND /OR STATE OF GEORGIA DEPARTMENT OF NATURAL RESOURCES. LOT OWNERS AND THE DEVELOPER ARE SUBJECT TO PENALTY BY LAW FOR DISTURBANCE TO THESE PROTECTED AREAS WITHOUT PROPER PERMIT APPLICATIONS AND APPROVAL. SPECIAL CONSTRUCTION NOTE: IF THE CONTRACTOR KNOWS OR CAN REASONABLY BE EXPECTED TO HAVE KNOWN OF AN ERROR, DISCREPANCY OR CONFLICT IN THE PLANS, SPECIFICATIONS OR CONSTRUCTION STAKING AND FAILS TO REPORT THE PROBLEM PRIOR TO CONSTRUCTION, HE SHALL NOT BE ENTITLED TO COMPENSATION FOR ANY WORK OR EXPENSE INCURRED BY HIM FOR WORK REQUIRED TO BE RE- CONSTRUCTED BECAUSE OF SAID ERROR, DISCREPANCY OR CONFLICT. LEVEL II CERTIFICATION NO. 2104 ISSUED 11 -5 -05 EXPIRES 11-5-14 SCALE: I" = 10' 10' 20' 25' O w (� Z . (o H o (5� 0) < 0Nw Z N O 0 z m O = '- Q d U� o f � 1 0 u o co 005- D - J >- 0 -� d W d X 6? fY =0 hi N a (DO _� DW< 0 _0 2 W J Qom d ZNI- U w 0) 0 0) w SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE I CONTACT A MINIMUM DP 72 HOURS PRIOR TO DIGGING i;ii_ TIES PRDTECTIDN CE: ER 1 -800- 282 -74: DRAWING NUMBER C-3 3 OF 6 SHEL. I S LIMITS OF DISTURBANCE DNF FLAG #1 \\\\\\X\4\\\ \ \\\ \ \ \ \\\ \ \\ \f).\\\\\\\\\ \ \ \ \ \\ \\\\\\\\\\\\\\ ` \ \ \\ \ \\ \\\ \\ \ \ \ \ \ \ \ \\ \ \ \ \\ \\ \ \ \ \ \ \ \ \ \ \ \\ \\ \ \ \ \ \\ \\ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \\\1\\‘\\\\\\ \ \ \ \ \\\ \ \ \ 1 \` \ \ \ \ \ \ \ \ \� \ \� \� \� 1\ \ \ • \\ \ \\ ` \ \ \\ \, \ \ \ \ \N \ \ \\ \\ \ \ \ \\ \ \ \ \� \ \ \ \N *\\\\\\\\\\ \ \\ \ \ \ \ \ \ SOIL EROSION LEGEND TEMPORARY SEDIMENT BARRIER TEMPORARY HAY BALES CONSTRUCTION EXIT MULCHING DNF FLAG #2 DISTURBED AREA STABIUZATION WiTH TEMPORARY SEEDING DISTURBED AREA STABIUZATION WiTH PERMANENT SEEDING i i DISTURBED AREA STABIUZATION WITH SODDING CHECK DAM DNR FLAG #4 DNR FLAG #5 INLET SEDIMENT TRAP SEDIMENT TRAP GEOTEXTiLE CHANNEL STABIUZATION VEGATATION ROOC CCONCRETE RAP . \ \ \ ° \ \\i.\\ \ \\ \\ \ \\ \� \\ \,4\r-\\\-\\\ \ \ \ \ \ \\. \\\\\,, \\."\\\ k\\DNR FLAG #6 Yr \ \ \�\ \ \ \ \ \\ \ \. \; \\ \\\ \ \ \\ �� 2 ROWS 0 d >- w W Z i d m : U) < ON -J (f)C5CO m Z< U) 0 z ( m Q o = d J ` \\ \ \\�\ \- \ \ \, BEN - NAIL IN P/P ELEV 8.45 NAVD 1988 LIMITS OF DISTURBANCE DNR FLAG #7 7.5' DRAMA= & UTILITY S 26 °1637 "W 204.52 LIMITS OF DISTURBANCE SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE II 1 = 10' SPECIAL SOIL EROSION PREVENTION NOTES : 1. The state of Georgia requires that the initial soil erosion prevention measures shall be inspected by the designer within 7 days after installation. 2. It is the responsibility of the contractor to notify the soil erosion prevention plan designer within 7 days after the initial soil erosion measures are in place for inspection. .3. Soil erosion prevention plans shall be kept current and on site or readily accessible at all times during the duration of the project until after final stabilization has occurred. STREAM BUFFER ENCROACHMENT NOTES : 1. NEW STRUCTURES ON THIS PROJECT DO NOT ENCROACH IN THE 25 OR 50 FOOT STREAM BUFFER. 2. NON- EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50 FOOT STREAM BUFFER AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST OBTAINING THE NECESSARY VARIANCES AND PERMITS. 4. Primary permittee must provide a copy of the soil erosion prevention plans to each secondary permittee. 5. Contractor is to keep a record of his inspections of the soil erosion control measures to include at least the following: a. date and scope of the inspection b. name of person performing inspection C. major observations (including noncompliance incidents) inspection reports are to be kept current and on site or readily accessible at all times during the duration of the project until after final stabilization has occurred. 6. Sampling of the outfall is the responsibility of the primary permittee and sampling requirements are to be as per the NPDES general permit. 7. Silt fencing is to remain in place until final stabiliazation. 8. Waste materials shall not be discharged to state waters except as authorized by a section 404 permit. 9. These ES & PC plans are in compliance with waste disposal, sanitary sewer and septic tank regulations. 10. Great care shall be token to prevent oil spills and leaks. In the event that a spill shall occur, stop the spill source immediately and implement BMP's and clean —up for the spill. BMP REMOVAL NOTE : CONTACT A MINIMUM OF 72 HOURS PRIOR TO DIGGING Erosion and Sediment Control Phasing Initial Phase (Phase I) 1. RETROFITS, PERIMETER SILT FENCE AND CONSTRUCTION EXIT TO BE LEFT IN PLACE UNTIL FINAL STABILIZATION HAS OCCURED. 1. This phase shall include Silt fencing and exits and sediment and detention ponds to land disturbing activities to prevent sediment from leaving Intermediate Phase (Phase II) construction be installed prior to an UTILITIES PROTECTION CENTER I- 800- 282 -74iI the site. WETLANDS NOTE: 1. This phase shall include construction of any outlet structures, retrofits, check dams, inlets protection and temporary grassing. ALL WETLANDS ARE UNDER JURISDICTION OF THE CORPS OF ENGINEERS AND /OR STATE OF GEORGIA DEPARTMENT OF NATURAL RESOURCES. LOT OWNERS AND THE DEVELOPER ARE SUBJECT TO PENALTY BY LAW FOR DISTURBANCE TO THESE PROTECTED AREAS WITHOUT PROPER PERMIT APPLICATIONS AND APPROVAL. Final Phase (Phase Ill) 1. This phase shall include outfall protection, any revised inlet protection and any other permanent devices. SPECIAL CONSTRUCTION NOTE: LEVEL II CERTIFICATION NO. 210 4 ISSUED 11 -5 -05 EXPIRES 11-5-14 DRAWING NUMBER IF THE CONTRACTOR KNOWS OR CAN REASONABLY BE EXPECTED TO HAVE KNOWN OF AN ERROR, DISCREPANCY OR CONFLICT IN THE PLANS, SPECIFICATIONS OR CONSTRUCTION STAKING AND FAILS TO REPORT THE PROBLEM PRIOR TO CONSTRUCTION, HE SHALL NOT BE ENTITLED TO COMPENSATION FOR ANY WORK OR EXPENSE INCURRED BY HIM FOR WORK REQUIRED TO BE RE- CONSTRUCTED BECAUSE OF SAID ERROR, DISCREPANCY OR CONFLICT. SCALE: 1" = 10' 10' 20' 25' 4 OF 6 SHEETS DISTURBED AREA STABIUZATION WITH SODDING CHECK DAM DNR FLAG #4 DNR FLAG #5 INLET SEDIMENT TRAP SEDIMENT TRAP GEOTEXTiLE CHANNEL STABIUZATION VEGATATION ROOC CCONCRETE RAP . \ \ \ ° \ \\i.\\ \ \\ \\ \ \\ \� \\ \,4\r-\\\-\\\ \ \ \ \ \ \\. \\\\\,, \\."\\\ k\\DNR FLAG #6 Yr \ \ \�\ \ \ \ \ \\ \ \. \; \\ \\\ \ \ \\ �� 2 ROWS 0 d >- w W Z i d m : U) < ON -J (f)C5CO m Z< U) 0 z ( m Q o = d J ` \\ \ \\�\ \- \ \ \, BEN - NAIL IN P/P ELEV 8.45 NAVD 1988 LIMITS OF DISTURBANCE DNR FLAG #7 7.5' DRAMA= & UTILITY S 26 °1637 "W 204.52 LIMITS OF DISTURBANCE SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE II 1 = 10' SPECIAL SOIL EROSION PREVENTION NOTES : 1. The state of Georgia requires that the initial soil erosion prevention measures shall be inspected by the designer within 7 days after installation. 2. It is the responsibility of the contractor to notify the soil erosion prevention plan designer within 7 days after the initial soil erosion measures are in place for inspection. .3. Soil erosion prevention plans shall be kept current and on site or readily accessible at all times during the duration of the project until after final stabilization has occurred. STREAM BUFFER ENCROACHMENT NOTES : 1. NEW STRUCTURES ON THIS PROJECT DO NOT ENCROACH IN THE 25 OR 50 FOOT STREAM BUFFER. 2. NON- EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50 FOOT STREAM BUFFER AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST OBTAINING THE NECESSARY VARIANCES AND PERMITS. 4. Primary permittee must provide a copy of the soil erosion prevention plans to each secondary permittee. 5. Contractor is to keep a record of his inspections of the soil erosion control measures to include at least the following: a. date and scope of the inspection b. name of person performing inspection C. major observations (including noncompliance incidents) inspection reports are to be kept current and on site or readily accessible at all times during the duration of the project until after final stabilization has occurred. 6. Sampling of the outfall is the responsibility of the primary permittee and sampling requirements are to be as per the NPDES general permit. 7. Silt fencing is to remain in place until final stabiliazation. 8. Waste materials shall not be discharged to state waters except as authorized by a section 404 permit. 9. These ES & PC plans are in compliance with waste disposal, sanitary sewer and septic tank regulations. 10. Great care shall be token to prevent oil spills and leaks. In the event that a spill shall occur, stop the spill source immediately and implement BMP's and clean —up for the spill. BMP REMOVAL NOTE : CONTACT A MINIMUM OF 72 HOURS PRIOR TO DIGGING Erosion and Sediment Control Phasing Initial Phase (Phase I) 1. RETROFITS, PERIMETER SILT FENCE AND CONSTRUCTION EXIT TO BE LEFT IN PLACE UNTIL FINAL STABILIZATION HAS OCCURED. 1. This phase shall include Silt fencing and exits and sediment and detention ponds to land disturbing activities to prevent sediment from leaving Intermediate Phase (Phase II) construction be installed prior to an UTILITIES PROTECTION CENTER I- 800- 282 -74iI the site. WETLANDS NOTE: 1. This phase shall include construction of any outlet structures, retrofits, check dams, inlets protection and temporary grassing. ALL WETLANDS ARE UNDER JURISDICTION OF THE CORPS OF ENGINEERS AND /OR STATE OF GEORGIA DEPARTMENT OF NATURAL RESOURCES. LOT OWNERS AND THE DEVELOPER ARE SUBJECT TO PENALTY BY LAW FOR DISTURBANCE TO THESE PROTECTED AREAS WITHOUT PROPER PERMIT APPLICATIONS AND APPROVAL. Final Phase (Phase Ill) 1. This phase shall include outfall protection, any revised inlet protection and any other permanent devices. SPECIAL CONSTRUCTION NOTE: LEVEL II CERTIFICATION NO. 210 4 ISSUED 11 -5 -05 EXPIRES 11-5-14 DRAWING NUMBER IF THE CONTRACTOR KNOWS OR CAN REASONABLY BE EXPECTED TO HAVE KNOWN OF AN ERROR, DISCREPANCY OR CONFLICT IN THE PLANS, SPECIFICATIONS OR CONSTRUCTION STAKING AND FAILS TO REPORT THE PROBLEM PRIOR TO CONSTRUCTION, HE SHALL NOT BE ENTITLED TO COMPENSATION FOR ANY WORK OR EXPENSE INCURRED BY HIM FOR WORK REQUIRED TO BE RE- CONSTRUCTED BECAUSE OF SAID ERROR, DISCREPANCY OR CONFLICT. SCALE: 1" = 10' 10' 20' 25' 4 OF 6 SHEETS DNF FLAG #1 SOIL EROSION LEGEND TEMPORARY SEDIMENT BARRIER TEMPORARY HAY BALES CONSTRUCTION EXIT MULCHING \\ \\\ \'\ \ \ \ \\ N L \ \ \ \ \ \ \ \ \\ DISTURBED AREA STABIUZATION WITH TEMPORARY SEEDING \\ \ \ \ \ \ \ \ \ \ \. r\\\\ \ \ \ \ \ \ \\ \ \ \\ \\\\\k \ \ \ \ \ \� \\ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \\ \ \ \ \ \ \ \ \ \ \ \\ \ ' \ \ \ \ \ \ \ \ \\ \ s \ \ \\ \ \\ \�\ \ \ \ \ \ \ \ \ \\ \ \\ \ \\ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \t \ \ \ \ \ \ \ \ \ \\ \ \ \ \� \ \ \ \ \\ \ \\ :: ::: a. . : DISTURBED AREA STABILIZATION WITH PERMANENT SEEDING WITH SODDING STABIUZATKIN CHECK DAM INLET SEDIMENT TRAP SEDIMENT TRAP GEOTEXTILE woe; ofrsorforzy#4: ■4"" msss -7* 4 F4010) 1 V*16,4 414 W '0" .*** (Orr 44144.-A. � ��4t�i�(∎ 40 I,I, o ;I,I�I�I■ I��I,I,,, \� \ \ \ \\ \ \ \`\ . \ \\, \ \ \ \'\\ \,' \\ \ \\ \ \ \ \k\ \ti9 \ \ \� \\(k.4041\\\\ 4, ,\ \ \ \I\ \\ ' \. \ (\ \ ; \\X\ .)° \ \ \ \ \ \ \ \ \ \\ \ \ \L. N \ \\\ . \ \ \\ \\ CHANNEL S ABIUZATION VEGATATION ROCK CONCRETE \ \ \`'\\ ` \ \\ ` \\ BENCHMARK_ NAIL IN P/P ELEV 8.45 NAVD 1988 s 26 °16'3'7 "W 204.52 SOIL EROSION AND SEDIMENT CONTROL PLAN - PHASE III 1" = la SPECIAL SOIL EROSION PREVENTION NOTES : 1. The state of Georgia requires that the initial soil erosion prevention measures shall be inspected by the designer within 7 days after installation. 2. It is the responsibility of the contractor to notify the soli erosion prevention plan designer within 7 days after the initial soil erosion measures are in place for inspection. 3. Soil erosion prevention plans shall be kept current and on site or readily accessible at all times during the duration of the project until after final stabilization has occurred. STREAM BUFFER ENCROACHMENT NOTES : 1. NEW STRUCTURES ON THIS PROJECT DO NOT ENCROACH IN THE 25 OR 50 FOOT STREAM BUFFER. 2. NON- EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50 FOOT STREAM BUFFER AS MEASURED FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST OBTAINING THE NECESSARY VARIANCES AND PERMITS. 4. Primary permittee must provide a copy of the soil erosion prevention plans to each secondary permittee. 5. Contractor is to keep a record of his inspections of the soil erosion control measures to include at least the following: a. date and scope of the inspection b. name of person performing inspection c. major observations (including noncompliance Incidents) Inspection reports are to be kept current and on site or readily accessible at all times during the duration of the project until after final stabilization has occurred. 6. Sampling of the outfall is the responsibility of the primary permittee and sampling requirements are to be as per the NPDES general permit. 7. Silt fencing is to remain in place until final stabiliazation. 8. Waste materials shall not be discharged to state waters except as authorized by a section 404 permit. 9. These ES & PC plans are in compliance with waste disposal, sanitary sewer and septic tank regulations. 10. Great care shall be token to prevent oil spills and leaks. In the event that a spill shall occur, stop the spill source immediately and Implement BMP's and clean —up for the spill. Erosion and Sediment Control Phasing Initial Phase (Phase I) BMP REMOVAL NOTE : 1. RETROFITS, PERIMETER SILT FENCE AND CONSTRUCTION EXIT TO BE LEFT IN PLACE UNTIL FINAL STABILIZATION HAS OCCURED. A MINIMUM OF 72 i-IDURS PR: OR TOO DIGGiN3 a Tc PROTLCTION CENTER 1- 800 - 282 -74111 1. This phase shall include Silt fencing and exits and sediment and detention ponds to land disturbing activities to prevent sediment from leaving construction be installed prior to an, the site. WETLANDS NOTE: Intermediate Phase (Phase 11) 1. This phase shall include construction of any outlet structures, retrofits, check dams, inlets protection and temporary grassing. Final Phase (Phase 111) ALL WETLANDS ARE UNDER JURISDICTION OF THE CORPS OF ENGINEERS AND /OR STATE OF GEORGIA DEPARTMENT OF NATURAL RESOURCES. LOT OWNERS AND THE DEVELOPER ARE SUBJECT TO PENALTY BY LAW FOR DISTURBANCE TO THESE PROTECTED AREAS WITHOUT PROPER PERMIT APPLICATIONS AND APPROVAL. 1. This phase shall include outfall protection, any revised inlet protection and any other permanent devices. SPECIAL CONSTRUCTION NOTE: LEVEL II CERTIFICATION NO. 2104 ISSUED 11 -5 -05 EXPIRES 11-5-14 DRAWING NUMBER IF THE CONTRACTOR KNOWS OR CAN REASONABLY BE EXPECTED TO HAVE KNOWN OF AN ERROR, DISCREPANCY OR CONFLICT IN THE PLANS, SPECIFICA77ONS OR CONSTRUCTION STAKING AND FAILS TO REPORT THE PROBLEM PRIOR TO CONSTRUCTION, HE SHALL NOT BE EN77TLED TO COMPENSATION FOR ANY WORK OR EXPENSE INCURRED BY HIM FOR WORK REQUIRED TO BE RE— CONSTRUCTED BECAUSE OF SAID ERROR, DISCREPANCY OR CONFLICT. SCALE: 1" = 1 0' C-5 10' 20' 25' 5 OF 6 SHEETS SOIL EROSION & SEDIMENTATION CONTROL NOTES 1. NARRATIVE: THE EXISTING SITE IS VACANT AND THE GROUND IS GENERALLY FLAT WITH SLOPES BETWEEN 0 PERCENT AND 2 PERCENT WITH FEW TREES. THE PROPOSED PROJECT WILL BE THE RELOCATION OF AN EXISTING RESIDENTIAL STRUCTURE TO THIS SITE. THE TOTAL SITE IS APPROXIMATELY 0.30 ACRES WITH THE ESTIMATED DISTURBED AREA TO BE 0.04 ACRES. 2. OWNER : William G. Rusher, Jr. 4796 Lambs Rood North Charleston, SC 29418 3. 24 HOUR CONTACT : William G. Rusher, Jr. 843 - 343 -6565 4. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN CONFORMANCE WITH THE CURRENT STATE SOIL AND WATER CONSERVATION COMMITTEE OF GEORGIA "MANUAL FOR EROSION CONTROL IN GEORGIA. 5. PRIOR TO ANY OTHER CONSTRUCTION, STABIUZED CONSTRUCTION EXITS SHALL BE CONSTRUCTED AT EACH POINT OF ENTRY TO OR EXIT FROM THE SITE. ALL ENTRANCES TO THE SITE WHICH ARE NOT PROTECTED SHALL BE BARRICADED. 6. IMMEDIATELY AFTER THE ESTABUSHMENT OF CONSTRUCTION EXITS, ALL PERIMETER EROSION CONTROL DEVICES AND STORM WATER MANAGEMENT DEVICES SHALL BE INSTALLED PRIOR TO ANY OTHER CONSTRUCTION. 7. ADDITIONAL EROSION CONTROL DEVICES SHALL BE INSTALLED IMMEDIATELY AFTER GROUND DISTURBANCE OCCURS. THE LOCATION OF SOME OF THE EROSION CONTROL DEVICES MAY HAVE TO BE ALTERED FROM THAT SHOWN ON THE PLANS IF DRAINAGE PATTERNS DURING CONSTRUCTION ARE DIFFERENT FROM THE FINAL PROPOSED DRAINAGE PATTERNS. IT IS THE CONTRACTOR'S RESPONSIBIUTY TO ACCOMPUSH EROSION CONTROL FOR ALL DRAINAGE PATTERNS CREATED AT VARIOUS STAGES DURING ANY PHASE OF CONSTRUCTION. ANY DIFFICULTY IN CONTROLLING EROSION DURING ANY PHASE OF CONSTRUCTION SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY I 8. THE LOCATIONS OF EROSION CONTROL DEVICES SHALL BE ADJUSTED AS CONSTRUCTION PROGRESSES IN ORDER TO MAINTAIN A FUNCTIONING EROSION CONTROL SYSTEM. 9. THE FAILURE OF ANY EROSION CONTROL DEVICE TO FUNCTION AS INTENDED, FOR ANY REASON, SHALL BE REPORTED TO THE ENGINEER IMMEDIATELY I 10. EROSION CONTROL DEVICES SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND AT LEAST DAILY DURING PROLONGED PERIODS OF CONTINUOUS RAINFALLS. 11. EROSION CONTROL DEVICES SHALL BE CLEANED WHEN THEY BECOME HALF FILLED WITH SEDIMENT. 12. EROSION CONTROL DEVICES SHALL BE REPAIRED AS NECESSARY TO MAINTAIN A FUNCTIONING EROSION CONTROL SYSTEM. 13. EROSION CONTROL DEVICES SHALL BE MAINTAINED UNTIL PERMANENT COVER IS ESTABUSHED AND THEN REMOVED SO THAT DRAINAGE FROM THE SITE IS NOT IMPAIRED. 14. STORM WATER DETENTION DEVICES SHALL BE CLEANED AS SPECIFIED ABOVE AND AFTER PERMANENT GROUND COVER HAS BEEN ESTABUSHED. 15. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABIUZED WITH TEMPORARY SEEDING. 16. ANY DISTURBED AREAS WITH SLOPES 2:1 OR FLATTER WHICH ARE NOT STABIUZED BY ANY OTHER MEASURES SHALL BE SEEDED AS SPECIFIED IN "PERMANENT SEEDING ". 17. VEGETATIVE METHODS: A VEGETATIVE COVER SHALL BE ESTABUSHED AND MAINTAINED OVER ALL FINAL GRADING AND OTHER DISTURBED AREAS OF THE SITE. SEE COASTAL PLAIN VEGETATIVE COVERS FOR AN OUTLINE OF THE ESTABUSHMENT OF VEGETATIVE COVERS. WEEKLY INSPECTION OF THE GRASS COVER SHALL BE PERFORMED TO IDENTIFY AREAS REQUIRING RE- ESTABUSHMENT OF GRASS. UME RATE: 1 TO 2 TONS PER ACRE FERTIUZER: 1500 POUNDS OF 6 -12 -12 PER ACRE 18. MULCH: MULCH SHALL BE UNCHOPPED, UNROTTED, SMALL GRAIN DRY STRAW APPUED AT A RATE OF 2 TONS PER ACRE. MULCH MATERIAL SHALL BE RELATIVELY FREE FROM ALL KINDS OF WEEDS AND SHALL BE FREE OF PROHIBITED NOXIOUS WEEDS WHICH ARE AS FOLLOWS : CANADA THISTLE, JOHNSONGRASS AND QUACKGRASS. SPREAD MULCH MECHANICALLY OR UNIFORMLY BY HAND. MULCH ANCHORING SHALL BE ACCOMPUSHED IMMEDPLACEMENTPIATELY AFTER MULCH PLACEMENT TO MINIMIZE LOSS BY WIND OR WATER. THIS MAY BE DONE BY PEG AND TWINE METHOD, MULCH ANCHORING TOOL NETTING OR UQUID MULCH BINDERS. 19. SOIL TYPE: THE SOILS IN THIS AREA HAVE BEEN CLASSIFIED BY THE SOIL CONSERVATION SERVICE AS BEING Cuc (Chipley -Urban Complex). 20. THIS DEVELOPMENT IS WITHIN MINIMAL ZONING AREA "AE -11" ACCORDING TO F.I.R.M. COMMUNITY PANEL NUMBER 13051CO213F, MAP REVISED SEPTEMBER 26, 2008. 21. THIS SITE IS IN ZONE "AE -11" AND IS LOCATED WITHIN THE 100 YEAR FLOOD ZONE. A MINIMUM ELEVATION OF 11.0 HAS BEEN SET. SPECIAL NOTES: 1. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTEDED BY THE INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES PRIOR TO OR CONCURRENT WITH LAND DISTURBING ACTIVITIES. 2. THE INSTALLATION OF EROSION CONTROL MEASURES AND PRACTICES SHALL BE INSTALLED PRIOR TO OR CONCURRENT WITH LAND DISTURBING ACTIVITIES. 3. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. 4. CITY OF TYBEE ISLAND PERSONNEL SHALL HAVE THE RIGHT TO INSPECT STORMWATER FACILITIES AT ALL TIMES. 5. STATE WATERS DO EXIST WITHIN 200 FEET OF THE PROPERTY. 6. FRESH WATER WETLANDS DO NOT EXIST ON THIS PROPERTY. 7. THE EROSION AND SEDIMENT CONTROL PLAN DESIGNER HAS VISITED THE SITE PRIOR TO DESIGN OF THE E & SC PLANS. 8. THE RECEIVING WATERS FOR THIS PROJECT IS THE ADJACENT SALTWATER MARSH AND ULTIMATELY THE ATLANTIC OCEAN. 9. ANY DISTURBANCE AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 14 DAYS SHALL BE STABALIZED WITH TEMPORARY SEEDING. 10. AMENDMENTS OR REVISIONS TO THE ES & PC PLAN WHICH HAVE A HYDRAULIC EFFECT ON THE PROJECT MUST BE APPROVED BY THE DESIGN ENGINEER. CLEARING NOTES: 1. ALL ELEVATIONS ARE BASED ON MEAN SEA LEVEL DATUM. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL EXISTING UNDERGROUND UTIUTIES PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES AND FOR AVOIDING ALL CONFLICTS WITH SAME. ANY DAMAGE TO EXISTING UTIUTIES SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR. 3. ALL WORK SHALL BE IN COMPUANCE WITH THE STATE SOIL AND WATER CONSERVATION COMMITTEE'S "MANUAL FOR EROSION AND SEDIMENTATION CONTROL IN GEORGIA. ALL SEDIMENT CONTROL FEATURES SHALL BE MAINTAINED ON A REGULAR BASIS AND SHALL BE REMOVED BY THE CONTRACTOR UPON ACCEPTANCE OF THE SITE BY THE OWNER. SEE LAND DISTURBING PLAN. 4. ALL DISTURBED AREAS AND PROPOSED EARTH GRADING NOT TO BE COVERED BY OTHER SURFACES SHALL BE GRASSED AS DESCRIBED ON THE LAND DISTURBING ACTIVITY PLAN. 5. EGRESS FROM THE SITE WILL BE SUCH THAT ALL VEHICLES MUST TRAVERSE CONSTRUCTION EXITS TO REMOVE MUD FROM TIRES BEFORE ENTERING ANY PAVED PUBUC HIGHWAY. 6. BALES OF HAY, STRAW OR SILT FENCE SHALL BE PLACED AROUND ALL STORM INLETS TO PREVENT SEDIMENT FROM ENTERING NEW PIPE OR DRAINAGE WAYS DURING CONSTRUCTION. THESE MEASURES ARE TEMPORARY. 7. THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING POSITIVE DRAINAGE OF ALL AREAS WITHIN THE PROJECT SITE INCLUDING RIGHTS -OF -WAYS, EASEMENTS AND LOTS. THE CONTRACTOR SHALL PROVIDE THE NECESSARY FILL AND OR GRADING TO MEET THE FINISHED PLAN GRADES AND EUMINATE ANY AND ALL AREAS WHICH ARE LOW AND DO NOT DRAIN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING PROPER DRAINAGE OF ANY AREAS WHICH ARE CHANGED AS A RESULT OF FIELD ADJUSTMENTS TO THE CONSTRUCTION PLANS. 8. THE CONTRACTOR WILL NOT BEGIN CLEARING OR ANY CONSTRUCTION ACTIVITY UNTIL THE APPROPRIATE PERMITS HAVE BEEN ISSUED. 9. IF REQUIRED, TREE PROTECTION BARRICADES SHALL BE INSTALLED PRIOR TO ANY CLEARING ACTIVITY AND MAINTAINED UNTIL INSTRUCTED BY OWNER OR ENGINEER TO REMOVE THEM. 10. THE CONTRACTOR SHALL TAKE SPECIAL CARE TO AVOID DAMAGE TO TREES AND ROOT SYSTEMS WHILE WORKING WITHIN TREE PROTECTION BARRICADES. THE CONTRACTOR SHALL NOT WORK WITHIN TREE PROTECTION BARRICADES WITHOUT A REPRESENTATIVE FROM THE OWNER OR ENGINEER PRESENT. 11. PRUNING OF TREE UMBS, BRANCHES AND ROOTS OF TREES WHICH ARE WITHIN TREE PROTECTION BARRICADES SHALL BE DONE IN CONFORMANCE WITH SPECIFICATIONS AND RECOMMENDATIONS OF THE "NATIONAL ARBORIST ASSOCIATION" (N.A.A.) IN "PRUNING STANDARDS FOR SHADE TREES ". ANY VARIATION FROM THE RECOMMENDATION OF THE N.A.A. SHALL BE APPROVED BY THE OWNER IN WRITING PRIOR TO ANY PRUNING. 12. UMITS OF GRADING AND GRASSING ARE INDICATED ON PLANS AS "UMITS OF CONSTRUCTION ". 13. ALL DISTURBED AREAS FROM NEW CONSTRUCTION ACTIVITIES WILL BE SEEDED, MULCHED, FERTIUZED AND WATERED TO PROMOTE A SUFFICIENT GROUND COVER THAT WILL PREVENT SOIL EROSION. SUFFICIENT COVERAGE SHALL BE AS SPECIFIED IN "EROSION CONTROL GRASSING ". 14. DRAINAGE: ALL EXCAVATION SHALL BE PERFORMED SO THAT THE SITE AND THE AREA IMMEDIATELY SURROUNDING THE SITE WHICH EFFECTS THE OPERATIONS WILL BE CONTINUALLY AND EFFECTIVELY DRAINED. SURFACE WATER, GROUNDWATER, OR ANY PERCHED WATER WHICH MIGHT BE ENCOUNTERED DURING EXCAVATIONS SHALL BE REMOVED BY ANY ACCEPTABLE MEANS APPROVED BY THE ENGINEER. TENTATIVE ACTIVITY SCHEDULE 2012 2013 DEC JAN FEB MAR APR MAY INSTALLATION OF SEDIMENT CONTROLS AND TREE PROTECTION BARRICADES SITE GRADING UTIUTY INSTALLATION BUILDING CONSTRUCTION PERMANENT GRASSING PAVING NO T APPL. MAINTENANCE OF SEDIMENT CONTROL REMOVAL OF SEDIMENT CONTROL SITE DATA ZONE " NA" TOTAL ACREAGE. 0.30 ACRES DISTURBED ACREAGE 0.04 ACRES S.C.S. SOIL SURVEY FROM WEB SOIL SURVEY LEVEL II CERTIFICATION NO. 2104 ISSUED 11 -5 -05 EXPIRES 11-5-14 / COASTAL PLAIN VEGETATIVE COVERS PLAN PLANTING F TEMPORARY GRASS RATE MONTH PERMANENT GRASS RATE JANUARY- MARCH ANNUAL LESPEDEZA 10 Lbs. /Ac MARCH- JUNE CENTIPEDE SOD OR COMMON BERMUDA (HULLED) 10 Lbs. /Ac MARCH- JUNE COMMON BERMUDA (HULLED) 10 Lbs. /Ac MARCH- JUNE CENTIPEDE SOD OR COMMON BERMUDA (HULLED) 10 Lbs. /Ac APRIL- AUGUST BROWN TOP MILLS? 40 LLs• /Ac JULY- AUGUST COMMON BERMUDA (HULLED) OR CENTIPEDE SOD 10 Lbs. /Ac 10 Lbs. /Ac SEPTEMBER - FEBRUARY RYEGRASS 40 Lbs. /Ac SEPTEMBER- FEBRUARY COMMON BERMUDA (UNHULLED) OR CENTIPEDE SOD 10 Lbs. /Ac 1/2 Bu. /Ac 6` MINIMUM GEOTEXTILE UNDERLINER N.SA.R -2 (1.5 -3.5'? COARSE AGGREGATE TEMPORARY CONSTRUCTION EXIT "ECOSTONE" PERMEABLE BRICK PAVER OR APPROVED EQUAL TO HAVE BEVELED EDGES TO PREVENT COMPACTION OF FIL TRA T70N MATERIAL OR INSTALL FIL TRA TiON MATER /AL 1/4" TO 1/2" BELOW THE TOP OF THE PAVERS SOLDIER COURSE AS A BORDER OR CONCRETE CURB SET 1/4" BELOW PAVERS WITH CONTROL/ EXPANSION JOINTS AT 15' 0.0. (max) OR ELEVATIONS AS PER PLAN SPECIAL INSTALLA 770N NOTE : N.T.S. 12" WIDE GEOTEXTJLE ALONG PER/METER - TYPE AND INSTALLATION TO BE AS PER MANUF. SPEC /F /CA 77ONS No.8 AGGREGATE 1.5" BEDDING' AND FIL TRA T/ON ALL INSTALLATION PROCEDURES AND MATERIALS SHALL BE AS PER THE PAVER MANUFACTURER INSTRUCTIONS AND RECOMMENDA ITONS. NATURAL SUBGRADE No.8 AGGREGATE IN OPENINGS FOR FIL TRA ZION 4" OF No.57 STONE OPEN GRADED BASE COURSE 6" (min.) OF No.2 STONE SUB -BASE GEOTEXTILE UNDER BASE COURSE - TYPE AND INSTALLATION TO BE AS PER MANUF. SPEC /F /CA TiONS NOTES: 1. CONSULT WITH MANUFACTURER IF SOIL IS EXTREMELY WEAK OR SATURATED. 2. PAVERS CAN BE OVERLAID OR INLAID ON EXISTING ASPHALT OR CONCRETE DRIVEWAYS. 3. CONSULT ICPI TECH SPEC 2 FOR GUIDELINES ON SPECIFICATIONS FOR BASE MATERIALS, SUBGRADE SOIL AND BASE COMPACTION. 4. PLASTIC, STEEL, ALUMINUM OR PRECAST CONCRETE, EDGING MAY BE USED IF APPROVED. 5. OPEN GRADED BASE COURSE SHALL BE A MINIMUM STONE SIZE OF #89 OR AS RECOMMENDED BY THE MANUFACTURER AND APPROVED BY THE CITY OF TYBEE ISLAND. SIDEWALK / DRI VEWA Y BRICK PAVER DETAIL NOT TO SCALE FENCE TYPE A MINIMUM LENGTH 4' -0" POST SIZE TYPE OF POST Soft wood Oak Steel TYBEE ISLAND SIDE VIEW NOTE: USE 36" D.O.T. APPROVED FABRIC USE STEEL POST. FRONT VIEW TYPE C FABRIC (36 ") USE: WHERE FILL SLOPES EXCEED A VERTICAL HEIGHT OF 20 FEET AND THE SLOPE GRADIENT IS STEEPER THAN 3:1. NOTE: FILTER FABRIC MAY ALSO BE ATTACHED TO THE POST BY WIRE, CORD, AND POCKETS. POST SIZE TYPE OF POST MIN. LENGTH 4' STEEL FENCE SIZE OF POST 1 1.3 LB. /FT. MIN TENSILE STREGTH <LBS. MIN.) (1) (ASTM 5 -4632) ELONGATION (*AMAX.) (ASTM 5 -4632) AOS < APPARENT OPENING SIZE> (MAX. SIEVE SIZE> (ASTM D -4751) FLOW RATE <GAL /MIN. /SQ. FT.) (GDT -87) ULTRAVIOLET STABILITY (2> (ASTM D -4632 AFTER 340 HOURS WEATHERING IN ACCORDANCE WITH ASTM D -4355) BURSTING STREGTH (PSI MIN.> (ASTM 5 -3786 DIAPHRAGM BURSTING STRENGTH TESTER> MIN. FABRIC WIDTH (INCHES) WARP -260 FILL -180 40 #30 70 80 175 36 (1) MIN. ROLL AVERAGE OF FIVE SPECIMENS. (2) PERCENT OF REQUIRED INITIAL MIN. TENSILE STRENGTH. SIZE OF POST 3" dia. or 2X4 1.5 "X1.5" 1.31b. /ft. min. SILT FENCE - TYPE C E NOTE: OVERLAP 18" AT FABRIC JOINTS FRONT VIEW A (MIN) B (MIN) ▪ E(MAX) F FASTENERS FOR WOOD POSTS GAUGE Wire Staples 17 min. CROWN 30" 18" 28" 6" 6' -0" LEGS STAPLES /POST 3/4" Wide 1/2" Long 5 min. USE 36" D.O.T. APPROVED FABRIC. USE WOOD OR STEEL POSTS. CONTACT A MINIMUM OF 72 HOURS PRIOR TO DIGGING PRDTEC LT':ES PROTECTION CENTER I -800- 282 -741I GAUGE LENGTH BUTTON NAIL /POST HEADS DRAWING NUMBER Nails 14 min. 1" 3/4" 4 min. Vicinity Map C -6 6 OF 6 SHEET