Loading...
HomeMy Public PortalAboutCAPTAINS VIEW_15.pdfDATE ISSUED: 08 -29 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REROOF 15 CAPTAIN'S VIEW AGNES YAO PO BOX 2177 TYBEE ISLAND GA 31328 -2177 398 -2828 CELL MICHAEL'S ROOFING CO LLC PO BOX 267 MELDRIM GA 31318 P $ 96.00 PIN #4- 0021 -16 -094 $6,450.00 PERMIT #: 130544 TOTAL BALANCE DUE: $ 96.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: etA,(A/ &. d4,11- P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 w.cityoftybee.org 08/28/2013 12:50 9127486937 i - .P6-/ Property Address: Owner Architect or En • ineer Contractor ❑ 5irgle Family IV-Duplex ❑ Multi - Family units ❑ * Commercial unit(s) PAGE 03/04 City of Tybee Island, Georgia 912 - 472 -5030 • Fax 912- 786 -9539 APPLICATION FOR BUILDING PERMIT L PIN: i d �- /6 Mailing Address Telephone Home: Office: Cell: K lactr•m., Office: r"i.`-V$ e • ; • t7X L j � Cell: Ch ? ck all that apply ❑ Discover y/Tearout �] Footprin : Changes ❑ __ a,iditional square feet heaved /cooled ❑ Demolition or Relocation ❑ Other " A commercial project requires 2 sets of sealed drawin p by a design profess" construction by a contractor with fhe appropriate State of Georgia professional license. A Comm -I •roje may quire Site Plan Approval Details of Project: et7 «- D Estimated Cost of Construction: $ (4) ; kvt St) . ( Q . (mater -4Ia r rofitloverhead) If applicable, attach a copy of the certified elevatior certificate and/or survey of the property. Depending upon the scope of the work t o sets of construction drawings and /or a site plan may be required. Year Built: 1 1 ! Listed on National Historic Register or located within a National Historic District? Y 1 N • Buildings older than 50 years may be eligible to be tided on the State / National Register: With this designation, you may be eligible to take advantage of various tax inCe ntive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code 4rticle 14: Historic Preservation purina construction On-site restroom facilities will be provided through Construction debris will be disposed by by means of . I understand that I must comply with zonineL flood damage control,_ building. fire, shore erotedion and wetland ordinances. FEMA reStulations and all applicable codes and re lations. I realize that i must ensure the adequacy of drainage of this property so that surrounding property! is in no way adversely affected as required by Article 16, Stormwate r Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by ti' is permitted construction, Date: % Signature: FEES Printed Name of Applicant: — Permit Inspections Cap. Cost Rec. e,_.A permit normally takes 7 to 10 days to process. 17rocessinr7 time for a historic structure may be longer. Approvals: Planning & Zoning Manager 13uilding Official Wlllater!Sewer 13torm/Drainage City Manager Water Tap Sewer Stub Eng. Fees Aid to Const. TOTAL 08/28/2013 12:50 9127486937 PAGE 04/04 LEAD -BASED PAINT RRP RULES Ordinary renovation and maintenance activities cat create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1878 !rousing and child - occupied facilities must, before beginning work, provide owners, tenants, and child -care tacit ties with a copy of EPA's lead hazard information pamphlet Renovate Riaht_ImAOrtanf Lead Hazaal information for Families, Child Care Providers, and Schools. Contractors must document compliance with this rr!quirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead - ,Based Paint and Asbestos Program (404) 363 -7026, ,,fir •MY.■■■•,1.. Projects must be done by a Certified L sad Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coati d surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size, * * * * *.• * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Projects Invol De„_ vinst ra nhtian. Wrecking. or Ren�_oyatio'n The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit halter to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. in most cases, the rules require both the owner and the involved contractors to assure the portion of th? building involved in the project is thoroughly inspected by an Accredited Asbestos inspector for materials tha t contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almos: without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 worki igs days in advance even if no asbestos is present in the building. Further guidance for regulatory compliE rice and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demo /Won. Other environmental issues such as asbestos removal techniques, lead abatement, Around contamination, or unusual site conditions may have EPD regulations that could affect the project. BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 — Sediment Barrier, Correct installation information can be found in the Field Manual for Erosion and Sediment "antral in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; Ittp://www,gaswcc.org/docstfield_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.6"-3.6" stone or larger. Type A sediment barriers have been installed whe a Type C is required and shown on the permit drawings. Where two rows are called for they will be installer! with a separation that allows for the first one to fail (fati aver) without impacting the second one. The comp fete assembly and installation must be compliant; steel or wood posts, • ost spaci T - - A. #.0 .r. / tignatu - for receipt of Lead Paint, Asbestos, and a14Pnotices Date