HomeMy Public PortalAboutDRIFTWOOD CT_4 (3).pdfDATE ISSUED: 08 -29 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
METAL ROOF
4 DRIFTWOOD
ALAN &MARLA ROBERTSON
9725 WOODS DR UNIT 1909
SKOKIE IL 60077
312 -557 -1652
MICHAEL'S ROOFING CO LLC
PO BOX 267
MELDRIM GA 31318
P
$ 354.00
PIN #4- 0002 -24 -027
$38,500.00
PERMIT #: 130543
TOTAL BALANCE DUE: $ 354.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, tire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
08/28/2013 12:50 9127486937
Property Address:
►t`� oar e
PAGE 01/04
City of Tybee Island, Georgia
912-472-5030 - Fax 912 - 786-9539
APPLICATION FOR BUILDING PERMIT
PIN: 171d'Oa -o24 -- 61,4 2 —.
ingie Family
uplex
❑ Multi - Family units
❑ * Commercial unit(s)
Ch 3ck aN met apply
Q Discove.y/Tearout
Q Footprint Changes
a-iditionai square
feet hen :edlcooled
❑ Demolition or Relocation
O Other
' A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: i -JOB al,_A-Sp _e_a..
Estimated Cost of Construction: $ 5 • (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevatior certificate and /or survey of the property. Depending upon
the scope of the work, twig sets of construction drawings and /or a site plan may be required.
Uc'
Year Built: d `� Listed on National Historic Reg ster or located within a National Historic District? Y I N
• Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee island.
• Also see the Tybee island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances. FEMA regulations and all applicable codes and
requlations. l realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwatc:r Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by If its permitted construction.
Date: S `'..5k,1 Signature: A trAliAtlea
Printed Name of Applicant: gr � � OO Ct"
Note: Aperm 1 normall y takes 7 to t 0 da ys to process. - °rocessino time for a
lbf_storic structure may be lon,Ger.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Signatu
8 ^3s t3
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees _
Aid to Const.
TOTAL
Name
Mailing Address
Telephone
Home:
Owner
IN.V. e,,C, l,,,:. M
Architect or
Engineer
Office:
Cell:
Contractor
AA tt ,
it- tdAtil� 5 Rots-
04.41r. rn
ttiC1 P. t • ec 1 +lo 3l,:j
Office: 14$ - fat
Cell: J1;3- kaclo.--
ingie Family
uplex
❑ Multi - Family units
❑ * Commercial unit(s)
Ch 3ck aN met apply
Q Discove.y/Tearout
Q Footprint Changes
a-iditionai square
feet hen :edlcooled
❑ Demolition or Relocation
O Other
' A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: i -JOB al,_A-Sp _e_a..
Estimated Cost of Construction: $ 5 • (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevatior certificate and /or survey of the property. Depending upon
the scope of the work, twig sets of construction drawings and /or a site plan may be required.
Uc'
Year Built: d `� Listed on National Historic Reg ster or located within a National Historic District? Y I N
• Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee island.
• Also see the Tybee island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances. FEMA regulations and all applicable codes and
requlations. l realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwatc:r Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by If its permitted construction.
Date: S `'..5k,1 Signature: A trAliAtlea
Printed Name of Applicant: gr � � OO Ct"
Note: Aperm 1 normall y takes 7 to t 0 da ys to process. - °rocessino time for a
lbf_storic structure may be lon,Ger.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Signatu
8 ^3s t3
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees _
Aid to Const.
TOTAL
08/28/2013 12:50 9127486937
PAGE 02/04
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities ca create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 Housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facil ties with a copy of EPA's lead hazard information pamphlet
Renovate Ria ht: lmyortant Lead Hazard informaticn for Families, Child Care Providers, and Schools.
Contractors must document compliance with this rrquirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
dIP
at... ■■•••■1.
Projects must be done by a Certified L sad Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coatrd surfaces or components more than 6 ft2 per interior
room or 20 ft of exterior surfaces AND all window replacements and partial demolitions of any size.
3*
* * * **t * * * * * * * * * * * * ***
Asbestos/Environmental Notification to Georgia EPD for
Projects lnvolvina Demolition. Wreckina. or Renovation
The undersigned hereby acknowledges that the is nuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accorcance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials the t contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and ,A. ;bestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ;round contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * r * * * * * * * * * * * * * * *
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information ran be found in the Field Manual for Erasion and Sediment
Control in Georgia, Fourth Edition 2002, ' ,3eorgia Soil and Water Conservation Commission;
http:l /www.gaswcc. org /docsiffeld_manueI_4ed. pdf.
Problems with the Co is not limited to the installal ion, but to material, The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Mere two rows are called for they will be installe 1 with a separation that allows for the first one to fail (fall
Dyer) without impacting the second one. The complete assembly and installation must be compliant; steel or
'wood posts, post spacing, Tyr - A.
Signatu = for receipt of ead -ai ,
Irinted Name
and E MP notices Date