HomeMy Public PortalAboutN CAMPBELL AV_15 1OF2.pdfCITY OF TYBEE ISLAND
BUILDING PERMIT
MAXIMUM FENCE AND VEGETATION HEIGHT -36 "/
ALL WORK TO BE COMPLETED BEFORE 09/03/2013
DATE ISSUED: 08 -27 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CUT OFF FENCE FOR CLEAR VIEW
15 N CAMPBELL AVE
ARNSDORFF LAVERTY &
15 N CAMPBELL AVE
TYBEE ISLAND GA 31328 -9306
912 - 234 -7414
CHARLES J SPALDING
PO BOX 1962
TYBEE ISLAND GA 31328
P
$ 0.00
PIN #4- 0002 -14 -001
$ 300.00
PERMIT #: 130539
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
3 -(3 cl -e s��. () k Cz) wip
C1 e. -C:lam,
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
mgr, yr
1328
Property Address:
City of Tybee Island, Georgia
912 - 472 -5033 or 912 - 472 -5031 Fax 912 - 786 -9539
APPLICATION FOR BUILDING PERMIT
S" 14, a .„, AVe,, PIN: - 0-6,001 /ft—do!
Single Family
❑ Duplex
❑ Multi- Family units
❑ * Commercial unit(s)
1✓ka `ts 5�'i ` Check all that apply
El Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
El Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of GGeorgia professional license. A commercial project may require Site Plan Approval.
Details of Project: (�'� -�/Yl C—P, /C/2 U
-4'C t 4 C
Estimated Cost of Construction: $ 3 . o v (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Sto •• ater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impa'r•y th': permitted construction.
Date: S7k6, P.3 Signature: Arm;
Printed Name of Applicant: i/MFAMO,i
/ /
Note: A permit normally takes 7 to 10 days to process. Processing time or a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
• rn 0041
Signat
Date
0--20-12
• Q (l Work -�-o b e
V Se 1 a -a -non
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
c 'Ap1e4 IoQ 0t 4
Stp.e.•nbJr 3 2013
;ye
40
¢rvh ;i-
I QL n na :J, 1
Name
Mailing Address
Telephone
�Owner n II aucT t Arn S cLo
r-C
Home:
Cell:
Architect or
Engineer
Office:
Cell:
Contractor
s � �
ac 1
Office:
Cell: 12•- -1-10 i ---(10(
Single Family
❑ Duplex
❑ Multi- Family units
❑ * Commercial unit(s)
1✓ka `ts 5�'i ` Check all that apply
El Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
El Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of GGeorgia professional license. A commercial project may require Site Plan Approval.
Details of Project: (�'� -�/Yl C—P, /C/2 U
-4'C t 4 C
Estimated Cost of Construction: $ 3 . o v (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Sto •• ater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impa'r•y th': permitted construction.
Date: S7k6, P.3 Signature: Arm;
Printed Name of Applicant: i/MFAMO,i
/ /
Note: A permit normally takes 7 to 10 days to process. Processing time or a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
• rn 0041
Signat
Date
0--20-12
• Q (l Work -�-o b e
V Se 1 a -a -non
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
c 'Ap1e4 IoQ 0t 4
Stp.e.•nbJr 3 2013
;ye
40
¢rvh ;i-
I QL n na :J, 1
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * * * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http://vvww.gaswcc.org/docs/field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood p•.,ts,••os - pacin• Type C or A.
Sig : tur5o/ceipt of
Printed Name
d Paint, Asbestc.s, and BMP notices
Date
/
52
77
tzo
N 7
c9
18
78
5
212
2
8.4 AC
E -1
t-n 73
(HENRY SIMS MORGAN PARK) ;fits
2
16
.,A
27
3
1
26
37
4 \
r0 3 \ 4 'PO
2.8 AC
f2 J
181
798 54
Savannah Area GIS
1:2,400
Map Text
Buildings Parcels Shaded
All ;A15
A21; A25
A30;A31; A35;
A85; A81
A63
A40; A41; A44;
A45
A50; A51
A60;A61; A62;
A64
A70;A71;
Owner: ARNSDORFF & LAVERTY ROSS & ROB
PIN: 4 -0002 -14 -001
Property Address: 15 N CAMPBELL AVE
Zoning: R -1 -B
Flood Zone: AE
Aldermanic Code:
Unincorporated Chatham County
Commissioner Code: 4
Patrick K. Farrell
Phone: 912 -355 -6699
Voting Precinct: 4-10C
Elementary School: HOWARD
Middle School: COASTAL
High School: ISLANDS
Zip Code: 31401 -3302
Neighborhood Code: 20270
Calculated Acreage: 0.12241134
Land Value: 107600
Building Value: 84000
Real- estate Value: 191600
Sale Price: 130000
Sale Month: 05
Sale Day: 24
Sale Year: 1999
Legal Description: LOT 23 PART OF 33 NORTH PAR
Property Card: Board of Assessors
Feet
0 100 200
Parcels
Chatham
County
Interstates
Labels
Free Ways
Labels
US Highways
Labels
State /US
Highways
Labels
State Highways
Labels
eg Account Management ' ead Oni
File Edit Options Functions Consoles Help
Account Number 101- 0790.03
C� New Occupant
Address
5
N CAMPBELL AVE
J
I (GI
Zone
01
' Name +HELBUSH, ROBERT
(rr
General
- Mailing
I Metered I Non - Metered ( Financial I Information I Comments I History I Consumption History I Service Orders Devices I
Address
Account Details
Attention
Address
Status
Start Date
Active
i.
2752 ASHFORD RD NE
ATLANTA, GA 30319 -3208, C005
thi
1/24/2007
+ ,
Bill Thru Date
Last Bill Date
5/31/2013
7/01/2013
- Profile
Statement E ill
Balance
Pending Activity
Credit History
0.00
e
co
0.00
Statement Group
I I
!
Excellent
Class FF1
P'RESIDENTIAL - SINGLE
Deposits
Cutoff
0.00
E -Mail 'bhelbush @gmail.com
n
(N /A
Exceptions
H°
Contracts
0.00
Draft
N/A
n
SECOND NO. E ---- --
f
®o
a
SOC SEC U EIM
Clear
I View ( dotto ( .
0 , c.. 4.D re■
V `c
p g 133 awe. i0.tvz., 1rnakn
a03-Dt
C Y) o) L5 S. 9 oSZ
OW ✓vxQr‘ r:S -
�c S 0h ILI
q;5r per-UM r-Der, su i
M n Caw-& -
--o pro f Y4L
EiAccount Management ' ead Only)
File Edit Options Functions Consoles Help
F
elo
cln
Account Number
Zone
01.0860.00
01 IA'" Notes "
Address
Name
15
IN CAMPBELL AVE
I I
'LAVERTY &, ARNSDORFF
General I Metered
- Mailing Address
Attention
Address
Non - Metered I Financial Information
Comments I History
15 N CAMPBELL AVE
TYBEE ISLAND, GA
31328.9306, H032
Consumption History I Service Orders
Account Details
Profile
Statement Bill
Statement Group
Class
E -Mail
Exceptions
SECOND NO.
SOC SEC it
'RESIDENTIAL - SINGLE
Ir36dug@gmail.com
No Donation
c9tz)234 - i4,14
Status
Start Date
Bill Thru Date
Last Bill Date
Balance
Pending Activity
Credit History
Deposits
Cutoff
Contracts
Draft
Devices I
'Active
1/14/1999
513112013
17/01/2013
98.60CR
0.00
'Excellent
0.00
N/A
0.00
N/A
tl
Clear
View
I dotto I
ence. 5 4 (o - t n Gke.s � 11
-1 -13 I t : o S a o ► \ eN . e_ C-75-1
q-."7-15 P o n n n ¢ : e ■ .5 6 a_c_k4I - i`n 4-00 k - a� _s r � os a
Sk(2.:S 8 0 r•i. 4-4 ast $p at d
c?;) 4-k e y, I S k � ✓- Oo
Or
'd S 1 7 � . r � Ba.t' C0.It ema ci- Porn:fa
a T •�PkQ: ?kr . ,s" " .
Mgr• , Ck oT
Municode
Sec. 3 -050. Obstruction to visions at street intersections.
Page 1 of 1
Intersection requirements are intended to provide better vehicle safety on the public roads. A clear sight
triangle gives motorists a view of other oncoming motorists when approaching a road intersection.
On all corner lots, no fence, shrubbery or other obstruction to traffic sight vision, except utility poles or light or
sign standards, shall encroach into an area as measured from three feet above the level of the adjacent driving
surface to ten feet above the level of the adjacent driving surface, within a triangular area formed by the intersection of
the right -of -way lines of two streets and a diagonal line which intersects the right -of -way lines at two points, each 25
feet distance from the intersection of the right -of -way lines or, in the case of a rounded corner, from the point of
intersection of their tangents except where site conditions require greater or lesser setbacks as determined by a traffic
engineer. See Illustration 1 for visual clarification.
Illustration 1
PROPERTY
LINE
CLEAR VISION
TRIANGLE
25'
(Ord. No. 1999 -35, 10 -28 -1999; Ord. Correction to dates, amended 4 -14 -2005; Ord. No. 1999 -35, amended 11 -10 -1999; Manual,
amended 11 -10 -1999; Ord. No. 38 -2010, 11 -18 -2010)
http: / /library.municode.com /print. aspx ?h= &clientlD= 14104 &HTMRequest= http %3 a %2f%2flibrary.munico... 7/19/2013
Diane Schleicher
From: Claudia E Baker <twopalms4us @att.net>
Sent: Friday, July 19, 2013 9:06 AM
To: Mayor Hotmail
Subject: Follow -Up Status of Left Turn by Jensen Cottage (Bright to Campbell)
Good morning, Mayor! Just wanted to see where this matter now stands.
Between the power pole, palm tree, fence height, for sale sign at the Jensen Cottage corner, I believe a good
case of contributory negligence could be made. It would seem to me this would be an ideal time this matter is
addressed with the owner before the house is sold. (Ross, the present owner who operates Gauchos downtown,
I have found to be a fairly reasonable fellow.)
I am not asking the power pole or palm tree be removed. I am wondering if the City of TI would agree the
fence line along Campbell needs to be seriously lowered (or removed) and, if lowered, vegetation growing on it
be removed to greatly enhance visibility left and vastly improve this presently unsafe condition? (Please add
about 3 more near t -bone collisions w/ my vehicle since the my 6/21 letter.)
While checking, the City of TI may also want to review the left turn from Logan onto Campbell. It, too,
appears unsafe but that is not my primary concern as we seldom use that street.
Please understand I would just like for us all to have the best possible safety measures in place for everyone's
benefit.
Thank you again, Jason.
David Baker
(P.S. You and the City are to be commended for the logical and swift action on replacing the sewer line on the
Back River...or any further replacement of line to the treatment plant! Keep up the good work!)