Loading...
HomeMy Public PortalAboutBAY ST_1218City of Tybee Island • Community Development Dept. Inspection Report 403 Butler,, Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.472 -5032 • Fax 912.786.9539 Permit No. / - - ©14/5- Owner's Name otifc 0 Gen. Contractor Date Requested Date Needed Subcontractor o rl `% /3 (9‘,4a4.3 INTERNATIONAL CODE COUNCIL MEMBER Contact Information s/r k)/ Project Address l,;11 Scope of Work �fe°L F uhAID oLd5 c'A) , 74-(-Is 1-7 4 Inspector Date of Inspection Inspection rn, Az_ Pass Fail ® Fee /2)74) op /3 1/110,6i,2 Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass Fail Fee ENERGY STAR' Qualified in Highlighted Regions Builder Series 1000 Air Infiltration: < = 0.3 cfmisgft National Fenestration Rating Council® CERTIFIED PWG PWO -M -103- 00028 -00001 Vinyl Frame No Grilles Argon Gas Double Glaze Low -E Single Hung ENERGY PERFORMANCE RATINGS U- Factor .31 1.7 (U.S. /I -P) (Metric /SI) Solar Heat Gain Coefficient .29 ADDITIONAL PERFORMANCE RATINGS Visible Transmittance .56 Manufacturer stipulates that these ratings conform to applicable NFRC procedures for determining whole product performance. NFRC ratings are determined for a fixed set of environmental conditions and a specific product size. NFRC does not recommend any product and does not warrant the suitability of any product for any specific use. Consult manufacturer's literature for other product perform ance information. www. nfrc. org Tested in accordance with ASTM E330. +501 -50 psf Tested in accordance with ASTM E90/413/1332 for acoustical performance. STC: 25 Meets or exceeds ASTM E1300 2.5mm Annealed / 2.5mm Annealed 3 /4" OA IOU SO 2708934 1.000 1 DATE ISSUED: 03 -5 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT REPL 8 WINDOWS ON 2ND FLOOR 1218 BAY ST DEMETRICA & LAW TSOULOS PO BOX 670 TYBEE ISLAND GA 31328 -0670 663 -2199 BARRY A BROWN CONSTRUCTION CO PO BOX 2618 TYBEE ISLAND GA 31328 P $ 69.00 PIN #4- 0021 -15 -021 PROJECT VALUATION $1,800.00 PERMIT #: 130145 TOTAL BALANCE DUE: $ 69.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.city ofty bee.org Location: CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT alk RAI CT e.6 v775104 NAME ADDRESS PIN # D0�1- lam -ate TELEPHONE Owner T O oto . -3,Y.-.gdo l 86—?S Architect or Engineer /1///T Building Contractor 9,pfrI i, 'I', Rgo • ' a� t&�,,� Ave dy,�`€€ 5 (Check all that apply) ❑ Repair ❑ Residential ❑ Renovation F Single Family E] Minor Addition Duplex ❑ Substantial Addition ❑ Multi- Family ❑ Other ❑ Commercial Details of Project: n Footprint Changes Fl Discovery n Demolition gep/,4C? g- (Air'itideit405 I - c -Nd FIfbD ie- CupWA Uf Pyti3Opcg Estimated Cost of Construction: $ 1t 2tD +'9 onstruction Type (Enter appropriate number) (1 Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Mas6nry (5) Steel & Masonry (3) Frick Vened Proposed use: r Remark \: kf ATTACH gOPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following i fi rmation based on the construction drawings and site plan: # Units /\ # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off -stree parking spaces Trees loca ed & lied on site plan Access: Drivewa \eft.) With culvert? With swale? Setbacks Front Rear Sides (L) (R) # Storie Heig't Vertical distance measured from the average adjacent grade o the building to the -xtreme high point of the building, exclusive of chimneys, heating units, entilation ducts, air co itioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control,_ building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: 3-5- t 3 Signature of Applicant: OTeA permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager Signa Date 3 -5-(3 FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL LEAD -BASED PAINT Adapted from http: / /www.epa.cov/lead /pubs /renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample Pre-renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead -safe work practices. • Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project. However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800- 424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information pamphlet. • Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre - renovation disclosure form may be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead -safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. /L'ts`i g9f Si natttfe �] Ip12 hi, geowit) Ree,s. rinted ame IF YOU'RE NOT .Lf AD SAcf (fR ❑UIED. .DISTURBING JUST SIX 3 -S ^ /.? Date Per mit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. 3e,8■- g(4, nder gne t)VJA ff rinted e -s --ao�� Date Office Use Only: Project Address: Permit Number: