HomeMy Public PortalAbout11-0215 GreenCity of '► _ ,ee Island • Community Develop.__ent Dept.
\Y\
Inspection Report
403 Butler Ave. • P.O. Box 2749 • 'Thee Island, GA 31328
Phone 912.786.4573 ext. 114 r Fax 912.786.9539
Permit No. I -
Owner's Name ,''J 1 t.
Gen. Contractor .?
Date Requested I -2 2-1
.{ 3 h 21 late Needed - 11 ` 2 -' I
'f ! e G , bcontractor
of rrmation
Project Address
Sc
P
of Work
Inspector
mum
INTERNATIONAL
CODE COUNCIL`
MEMBER
(o2o2 - (059?
2H L0u AUPJ.
e ! rt tss Coo I -10,h I LAJ‘ S t a n
� jet
Inspection -° ► t1 e G
Date of Inspection
i
7,//i / �,�, if -✓ G / =�i /�-
.�4
Pass
in
/1/
EFee
04 1- c,
Inspection Pass ® Fail ❑ Fee
Inspection Pass ❑ Fail ® Fee
Inspection Pass ❑ Fail Fee
DATE ISSUED: 04 -18 -2011
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
ADD 5 IC CANS /FAN/MISC RRPAIRS
211 LOVELL AVE
OWNER NAME WILL GREEN
ADDRESS 204 2ND AVE
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME 5 STAR ELECTRICAL CONTRACTORS
ADDRESS PO BOX 15722
CITY STATE ZIP SAVANNAH GA 31416
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 50.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $1,000.00
PERMIT #: 110215
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
From:CITY OF TYBEE ISLAND
912 786 9539 06/16/2009 09:31 #293 P.001 /001
CITY OF TYBEE ISLAND
BUILDING & ZONING DEPARTMENT
P.O. Box 2749, Tybee Island, GA 31328
Phone (912) 786 -4573 • Fax (912) 786 -9539
ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT
Date g—/3"---AD t 1 New Work Replacement
Location of work (street address) p�/ ! , c,c/e // / tj` i
Contractor ,- 516 EIPGfv'c COL ( f� Telephone C//2 ,A 36 �f,j.3�j22 36 5/9
Address of Contractor /10 U i4 It F _ Ce tt-lc -02.. ( S� et t o �� 1/ 3 - 52"1
Property Owner C,CIf 11 6V'� t° j
Date work will be ready for inspection, if known Col i(�C($* l
Telephone
°tum�
Estimated cost of construction
/e.6 °
� r0C�rr
undin D" `° `– `� rn
i
u et -- , Z
Swimming Pool gro i (-2
m ro tt
Welder – 220 volts circuit
..g > m 0
Well Pump – grounding S rn
CD rt d
Others /Zee-es-5' ��`
• m
`^ T (`P la. rn
LtJ r P' qq 1 t,N ce/f•ec scret,
APPLICATION FOR TEMPORARY-SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
1. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy.
4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this
po icy may resul� in disconnection of the electrical service until all violations and deficiencies are corrected.
Owner/ /tractor Signature Date
esleY 5.5'essovvi
Owner /Contractor Printed Name
APPROVAL
Code Enforcem
Fee
Date
A/C Unit and Heat Pump
Attic Ventilation Fan
Bell Transmitter – low voltage
Border /Outline Lighting
Building Saw
Exit Lights – life safety
Heat Pump
Meter Box
Motor(s): hp
Outlets –110 volts circuit
Parking Lot Lights
Pool Lights – grounding
Range – commercial
� r0C�rr
undin D" `° `– `� rn
i
u et -- , Z
Swimming Pool gro i (-2
m ro tt
Welder – 220 volts circuit
..g > m 0
Well Pump – grounding S rn
CD rt d
Others /Zee-es-5' ��`
• m
`^ T (`P la. rn
LtJ r P' qq 1 t,N ce/f•ec scret,
APPLICATION FOR TEMPORARY-SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
1. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy.
4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this
po icy may resul� in disconnection of the electrical service until all violations and deficiencies are corrected.
Owner/ /tractor Signature Date
esleY 5.5'essovvi
Owner /Contractor Printed Name
APPROVAL
Code Enforcem
Fee
Date
Range Hood commercial
Service: amps
Sign Circuit wattage
Smoke Detector – low voltage
Spa or Tub grounding
Special 0 tl
S P 1 grounding
Water Heater
X-ray
� r0C�rr
undin D" `° `– `� rn
i
u et -- , Z
Swimming Pool gro i (-2
m ro tt
Welder – 220 volts circuit
..g > m 0
Well Pump – grounding S rn
CD rt d
Others /Zee-es-5' ��`
• m
`^ T (`P la. rn
LtJ r P' qq 1 t,N ce/f•ec scret,
APPLICATION FOR TEMPORARY-SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
1. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy.
4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this
po icy may resul� in disconnection of the electrical service until all violations and deficiencies are corrected.
Owner/ /tractor Signature Date
esleY 5.5'essovvi
Owner /Contractor Printed Name
APPROVAL
Code Enforcem
Fee
Date