Loading...
HomeMy Public PortalAbout2009.08.11 Temporary Lift Station Construction Easement - Rio Vista Homeowner's AssocationInstrument # 344293 VALLEY COUNTY, CASCADE, IDAHO 8-14-2009 09:12:14 No. of Pages: 4 Recorded for : CITY OF MCCALL ARCHIE N. BANBURY Fe9 Ex-Officio Recorder De jt Index to: EASEMENT RECORDING REQUESTED BY AND WHEN RECORDED RETURN TO: City of McCall 216 E. Park Street McCall, Idaho 83638 (Space Above for Recorder's Use) TEMPORARY CONSTRUCTION AND ACCESS EASEMENT The Rio Vista Homeowner's Association, hereinafter "Grantor", hereby grants unto the City of McCall, its agents, employees and contractors, hereinafter "Grantee", a temporary construction easement, referred to as TCE, and access to come onto Grantor's real property for the limited purpose of performing construction activities to facilitate construction of the McCal1 2009 Lift Station 8 Improvements Project and specifically to construct a new wet well and dry well for replacement of the existing system. The real property which is subject to this TCE is described as follows: Up to forty-eight feet (48') from the existing generator building as shown on the attached Exhibit 1. The purpose of which is to effect: construction of a new wet well and dry well for replacement of an existing system for the Lift Station 8 site. This easement will be exclusively for the time period from August 12, 2009, through December 30, 2009, at which time Grantee shall record a Release of this easement. All fences, ditches, utilities, signs, native grasses/topsoil, trees, hedges, flowers, etc. located within Grantor's real property that are disturbed or in any way altered or � y�y®ig damaged, other than where shown to be removed or modifi: d2during`construction shall be repaired or replaced to the condition, in the opinion of the. Grantor, 4u conjunction with the City of McCall, existing prior to any construction=activities. The Grantee agrees to allow access at all times to the Grantor for the sole purpose of operating and maintaining the monitoring well located on or nearby the TCE. The Grantoriitagrees to''accept water from the dewaterprocess into the drainage systems leadinto` the Ri Vista and and the g Y � 9 Vista'. pond, Grantee is fully responsible for maintaining an approved andrttceptable,system for dewatering the construction such that water flowing into the pond does not carry excess sediment. Additionally, the Grantee agrees to reimburse the Grantor for the cost of power associated with running the pump at the monitoring well starting from October 1, through the completion of the project. Grantor, its successors and assigns, hereby covenant to and with Grantee that its officers, agents or employees may at any time and all times, when necessary or convenient to do so, go over and upon the Premises and do and perform any and all acts necessary or convenient to the carrying into effect the purposes for which this grant is made. Signed: Signed: State of Idaho ) S.S. County of Valley/ A ) Dated: /Li le Dated: On this (O y of day AU (A , 2009, before me, the undersigned, a Notary Public, personally appeared (•-act rne Nkk) \ , known to me or proved to me upon satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument, and acknowledged to me that he/she.they executed the same. WITNESS my haa�l� and official seal. _00.•14. agg '• ti4 •.. (),...4 Ag iCO e 1 a w: sy c, ®: : • 1. a. mo. 11 ti D . Residing at Jj) / 1 , / L) Commission Expires 70/ / AZ-) ��' State of Idaho County of Valley S.S. On this // day of (-", 2009, before me, the undersigned, a Notary Public, personally appeared /o y ; :8 l %,; ct , known to me or proved to me upon satisfactory evidence to be th person whose name(s) is/are subscribed to the within instrument, and acknowledged to me that he/she.they executed the same. WITNESS my hand and official seal. Residing at Commission Expires L WSTING 15' PVC GRAVITY SEWER - -' WET WELL _- - EXISTING 15- PVC GRAVITY SEWER TO BE REMOVED AT END OF JOB WET WELL IN EL50302 PLUG AT END OF JOB 1ST TEMPORARY PIPELINE 781F 15-PVC GRAVITY SEWER MIN 0.4%SLOPE. SEE DEMOLITION AND BYPASS NOTES 2ND TEMPORARY PIPLINEJ 45 LF 15. PVC GRAVITY SEWER MIN 0.4%SLOPE. SEE DEMOLITWR AND BYPASS NOTES 66*LF8-PVC BYPASS SEWER PIPING, SEE NOTE 3 REMOVE EXISTING 42'-6, OF 8' GRAVITY SEWER FROM NEW MANHOLE TO EXISTING WET WELL / EXISTING LIFT STATION NO.8TO BE REMOVED EXISTING WET WELL TO BE REMOVED RETAIN AND PROTECT OPERATION OF EXISTING LIFT STATION WRING CONSTRUCTION OEXISTINGPUMP STATION 8 BENCH MARK EL 5041.3 N-EXISTING 8' GRAVITY SEWER PIPE • NEW MANHOLE IN EL5030.5 OUT EL 5030.4 SEE NOTE 7 83t LF (2) -8' FORCE SEWER MAINS TO W WTPMH N0.7 RIM EL507327 TEMPORARY CONSTRUCTION EASEMENT LIMITS FIELD VERIFY LOCATION - MIS DEPTH OF EXISTING 8 FORCE MANS AND NOTIFY CITY ENGINEER PRIOR TO CONSTRUCTION /I THRUST BLOCK (TYR) EXHIBIT 1 - LIFT STATION 8 TEMPORARY CONSTRUCTION EASEMENT