HomeMy Public PortalAboutResolution 2020-01-05 Authorizing Expenditure for the SCADA Master Plan TOWN OF FRASER
RESOLUTION NO. 2020-01-05
A RESOLUTION AUTHORIZING THE EXPENDITURE FOR THE SUPERVISORY CONTROL
AND DATA ACQUISITION MASTER PLAN
THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF
FRASER, COLORADO THAT:
1. The Town Board of Fraser, Colorado hereby authorizes the attached expenditures for
the Supervisory Control and Data Acquisition Master Plan with Browns Hill Engineering.
READ, PASSED ON ROLL CALL VOTE, AND ADOPTED BY THE BOARD OF TRUSTEES
THIS 22Ect DAY OF January. 2020.
Votes in favor: BOARD OF TRUSTEES F THE
Votes opposed: O TOWN RA R, C ORADO
Abstained: a_
BY:
, 4 of FR4S�� Mayor
ATTEST:
C. ESEPO-
ClAnj0-(i \(Y\
o Town Clerk
0
otoRPO
TOWN OF FRASER
BOARD OF TRUSTEE AGENDA ITEM
Board Meeting Date: January 22, 2020
SUBJECT: CONSENT AGENDA
Consideration of A Resolution Authorizing Browns Hill Engineering to implement priorities
20 and 21 of the SCADA (Supervisory Control and Data Acquisition) Master Plan in The
Amount of $37,142.00 and a Contingency amount of $2858.00.
DEPARTMENT: Public Works
PRESENTER/PREPARER: Russell Pennington, Public Works Director
Adam Cwiklin, Water and Wastewater Superintendent
FISCAL INFORMATION:
Cost as Recommended: $37,142.00
Balance Available: $120,000
Fund: Engineering Fees
Budget Line Item Number: 50-40-330
New Appropriation Required: No
STAFF RECOMMENDATION: Approve the Resolution xx-xx to appropriate funding to execute
priorities 20-21 of the SCADA Master Plan and authorize the appropriate Town officer to expend
said funds.
SUMMARY AND BACKGROUND OF SUBJECT MATTER:
2020 Capital Improvements Project funds are appropriated to complete upgrades the Town’s
SCADA communication system as defined in the SCADA Master Plan. The anticipated
upgrades will make the Town’s current water operations more robust and position the water
system to grow with the town.
The Town has transitioned from telemetry and serials communications to more robust digital
ethernet and cellular communication system. Upgrading the HMI computer and software will
complete the transition and leave Fraser poised well for the anticipated system growth.
To date, The Town has completed 19 of 21 priorities listed in the SCADA master plan.
Upgrades to the system started in 2014 when the PLCs and touchscreens were replaced at the
Maryvale WTP and associated remote sites, as well as the Fraser WTP and Blue Zone Tank.
The Fraser well field wells and were upgraded in 2019.
Browns Hill Engineering is the contractor of choice to complete the project. Browns Hill is the
Town’s system control engineer for both water and wastewater systems. They have first-hand
knowledge of our systems as they have been servicing the Town for two decades. Fraser will
realize efficiencies from using Browns Hill to complete these improvements.
ITEM
Computer $7142.00
Town Hall HMI Replace exsiting Genesis-32 software with $22,000.00
Computer and Ignition software. Installed Locally on new
software new computer, provided by Town.
Software Add Microsoft Azure Cloud Services to $8,000.00
provide redundancy
Subtotal $37,142.00
Contingency $2,858.00
Total $40,000.00
Project Schedule
Notice of Award January 23, 2020
Notice to Proceed January 23, 2020
Improvements Complete March 2020
The engineer’s estimate for the project is $37,142.00. The project funding includes contingency
amounts for a total of $40,000.00 which can be used towards unforeseen changes during
installation and programing.
ATTACHMENTS:
a. Resolution 2020-01-05
b. SCADA Master Plan
Town of Fraser - SCADA Master Plan
May 9, 2019
PrioritySiteIssueCommmentsCostImplementation CenturyVerizon
DateLinkCellular
1Yellow Yellow Zone Tank Communications are not Internet Connection at Completed 2019
Zone Tankreliable with existing serial radio connection to YZT
X
Town Hall
2Maryvale Install Internet connection to receive Yellow Completed 2019
X
WTPZone Tank Communications
3Maryvale Modify Communications to allow Yellow Zone Completed 2019
WTP/YZTTank Level to go directly to Maryvale WTP.
Modify HMI to receive YZT Tank Level from
Maryvale WTP
4Well 8Install Internet Connection for direct Included in Well 8 RehabIncluded in Planned for Aug.
communications with other sites.Well 8 2019
X
RehabRefer to Quote
18-023 SQ01
5Fraser WTPInstall Internet Connection for direct Fraser WTP internet $3,633 Approval of Quote
communications with other sites.connection will be shared 19-023 SQ17
X
with Well 2
6Blue Zone Install Internet Connection for direct $3,052 Approval of Quote
Tankcommunications with other sites.19-023 SQ18
X
7Fraser Modify Communications to allow Blue Zone $1,500 Approval of Quote
WTP/BZTTank Level to go directly to Fraser WTP.19-023 SQ19
Modify HMI to receive BZT Level from Fraser
WTP
8Green Zone Install Internet Connection for direct $3,640 Approval of Quote
PScommunications with other sites.19-023 SQ09
X
9Red Zone Install Internet Connection for direct $3,640 Approval of Quote
PScommunications with other sites.19-023 SQ10
X
10Green Zone Reprogram Green Zone PLC to obtain YZT $1,808 Approval of Quote
PSand GZT Levels directly from these tanks for 19-023 SQ11
Pump Station Control.
Modify Green Zone OIT to display data
directly from Maryvale WTP & Red Zone PS
11Red Zone Modify Red Zone OIT to display data directly $950 Approval of Quote
PSfrom Maryvale WTP & Green Zone PS19-023 SQ12
12Town Hall/Revise communications failure alarming for $2,068 Approval of Quote
Maryvale updated communications paths.19-023 SQ13
WTPModify Maryvale OIT to display data directly
from Green Zone PS & Red Zone PS
13Town Hall Modify existing HMI configuration for direct $6,580 Approval of Quote
HMIaccess to Maryvale WTP, GZPS, RZPS PLCs.19-023 SQ14
Update OIT and HMI setpoint tags for direct
access.
Remove PLC messaging at Town Hall
14Well 1Existing PLC is scheduled for End of Life in Well 1 internet connection $10,500 Approval of Quote
2021 and does not support Ethernet will be shared with Well 19-023 SQ15
communications. Replace existing PLC. Install 3B
Internet Connection and VPN for direct
X
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
15Well 2Existing PLC is scheduled for End of Life in Well 2 will utilize radio $10,500 Approval of Quote
2021 and does not support Ethernet connection to access 19-023 SQ16
communications. Replace existing PLC. Install internet connection at
Internet Connection and VPN for direct Fraser WTP
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
16Well 3BExisting PLC is scheduled for End of Life in Well 3B will utilize radio $10,500 Similar to Quote 19-
2021 and does not support Ethernet connection to access 023 SQ16
communications. Replace existing PLC. Install internet connection at
Internet Connection and VPN for direct Well 1
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
17Well 5RExisting PLC is scheduled for End of Life in $10,500 Similar to Quote 19-
2021 and does not support Ethernet 023 SQ15
communications. Replace existing PLC. Install
Internet Connection and VPN for direct
X
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
18Well 7Existing PLC is scheduled for End of Life in Well 7 internet connection $10,500 Similar to Quote 19-
2021 and does not support Ethernet will be shared with Well 9023 SQ15
communications. Replace existing PLC. Install
Internet Connection and VPN for direct
X
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
19Well 9Existing PLC is scheduled for End of Life in Well 9 will utilize radio $10,500 Similar to Quote 19-
2021 and does not support Ethernet connection to access 023 SQ16
communications. Replace existing PLC. Install internet connection at
Internet Connection and VPN for direct Well 7
communications with other sites.
Modify Fraser WTP PLC/OIT and Town Hall
HMI computer for direct communications with
Well.
20Town Hall Phase 1: Replace exsiting Genesis-32 software Gen-32 will be $21,000 Plan to Implement
HMI with Ignition software. Installed Locally on discontinued in 2020 and in 2020
Computer + new new computer, provided by Town.existing HMI is due for
Softwarereplacement.
21Town Hall Phase 2: Add Microsoft Azure Cloud Services HMI screens can be $8,000 Plan to Implement
HMI to provide redundancyaccessed from Town Hall in 2021
Computer + or Internet
Software
$89,871