Loading...
HomeMy Public PortalAboutResolution 2020-01-05 Authorizing Expenditure for the SCADA Master Plan TOWN OF FRASER RESOLUTION NO. 2020-01-05 A RESOLUTION AUTHORIZING THE EXPENDITURE FOR THE SUPERVISORY CONTROL AND DATA ACQUISITION MASTER PLAN THEREFORE, BE IT RESOLVED BY THE BOARD OF TRUSTEES OF THE TOWN OF FRASER, COLORADO THAT: 1. The Town Board of Fraser, Colorado hereby authorizes the attached expenditures for the Supervisory Control and Data Acquisition Master Plan with Browns Hill Engineering. READ, PASSED ON ROLL CALL VOTE, AND ADOPTED BY THE BOARD OF TRUSTEES THIS 22Ect DAY OF January. 2020. Votes in favor: BOARD OF TRUSTEES F THE Votes opposed: O TOWN RA R, C ORADO Abstained: a_ BY: , 4 of FR4S�� Mayor ATTEST: C. ESEPO- ClAnj0-(i \(Y\ o Town Clerk 0 otoRPO TOWN OF FRASER BOARD OF TRUSTEE AGENDA ITEM Board Meeting Date: January 22, 2020 SUBJECT: CONSENT AGENDA Consideration of A Resolution Authorizing Browns Hill Engineering to implement priorities 20 and 21 of the SCADA (Supervisory Control and Data Acquisition) Master Plan in The Amount of $37,142.00 and a Contingency amount of $2858.00. DEPARTMENT: Public Works PRESENTER/PREPARER: Russell Pennington, Public Works Director Adam Cwiklin, Water and Wastewater Superintendent FISCAL INFORMATION: Cost as Recommended: $37,142.00 Balance Available: $120,000 Fund: Engineering Fees Budget Line Item Number: 50-40-330 New Appropriation Required: No STAFF RECOMMENDATION: Approve the Resolution xx-xx to appropriate funding to execute priorities 20-21 of the SCADA Master Plan and authorize the appropriate Town officer to expend said funds. SUMMARY AND BACKGROUND OF SUBJECT MATTER: 2020 Capital Improvements Project funds are appropriated to complete upgrades the Town’s SCADA communication system as defined in the SCADA Master Plan. The anticipated upgrades will make the Town’s current water operations more robust and position the water system to grow with the town. The Town has transitioned from telemetry and serials communications to more robust digital ethernet and cellular communication system. Upgrading the HMI computer and software will complete the transition and leave Fraser poised well for the anticipated system growth. To date, The Town has completed 19 of 21 priorities listed in the SCADA master plan. Upgrades to the system started in 2014 when the PLCs and touchscreens were replaced at the Maryvale WTP and associated remote sites, as well as the Fraser WTP and Blue Zone Tank. The Fraser well field wells and were upgraded in 2019. Browns Hill Engineering is the contractor of choice to complete the project. Browns Hill is the Town’s system control engineer for both water and wastewater systems. They have first-hand knowledge of our systems as they have been servicing the Town for two decades. Fraser will realize efficiencies from using Browns Hill to complete these improvements. ITEM Computer $7142.00 Town Hall HMI Replace exsiting Genesis-32 software with $22,000.00 Computer and Ignition software. Installed Locally on new software new computer, provided by Town. Software Add Microsoft Azure Cloud Services to $8,000.00 provide redundancy Subtotal $37,142.00 Contingency $2,858.00 Total $40,000.00 Project Schedule Notice of Award January 23, 2020 Notice to Proceed January 23, 2020 Improvements Complete March 2020 The engineer’s estimate for the project is $37,142.00. The project funding includes contingency amounts for a total of $40,000.00 which can be used towards unforeseen changes during installation and programing. ATTACHMENTS: a. Resolution 2020-01-05 b. SCADA Master Plan Town of Fraser - SCADA Master Plan May 9, 2019 PrioritySiteIssueCommmentsCostImplementation CenturyVerizon DateLinkCellular 1Yellow Yellow Zone Tank Communications are not Internet Connection at Completed 2019 Zone Tankreliable with existing serial radio connection to YZT X Town Hall 2Maryvale Install Internet connection to receive Yellow Completed 2019 X WTPZone Tank Communications 3Maryvale Modify Communications to allow Yellow Zone Completed 2019 WTP/YZTTank Level to go directly to Maryvale WTP. Modify HMI to receive YZT Tank Level from Maryvale WTP 4Well 8Install Internet Connection for direct Included in Well 8 RehabIncluded in Planned for Aug. communications with other sites.Well 8 2019 X RehabRefer to Quote 18-023 SQ01 5Fraser WTPInstall Internet Connection for direct Fraser WTP internet $3,633 Approval of Quote communications with other sites.connection will be shared 19-023 SQ17 X with Well 2 6Blue Zone Install Internet Connection for direct $3,052 Approval of Quote Tankcommunications with other sites.19-023 SQ18 X 7Fraser Modify Communications to allow Blue Zone $1,500 Approval of Quote WTP/BZTTank Level to go directly to Fraser WTP.19-023 SQ19 Modify HMI to receive BZT Level from Fraser WTP 8Green Zone Install Internet Connection for direct $3,640 Approval of Quote PScommunications with other sites.19-023 SQ09 X 9Red Zone Install Internet Connection for direct $3,640 Approval of Quote PScommunications with other sites.19-023 SQ10 X 10Green Zone Reprogram Green Zone PLC to obtain YZT $1,808 Approval of Quote PSand GZT Levels directly from these tanks for 19-023 SQ11 Pump Station Control. Modify Green Zone OIT to display data directly from Maryvale WTP & Red Zone PS 11Red Zone Modify Red Zone OIT to display data directly $950 Approval of Quote PSfrom Maryvale WTP & Green Zone PS19-023 SQ12 12Town Hall/Revise communications failure alarming for $2,068 Approval of Quote Maryvale updated communications paths.19-023 SQ13 WTPModify Maryvale OIT to display data directly from Green Zone PS & Red Zone PS 13Town Hall Modify existing HMI configuration for direct $6,580 Approval of Quote HMIaccess to Maryvale WTP, GZPS, RZPS PLCs.19-023 SQ14 Update OIT and HMI setpoint tags for direct access. Remove PLC messaging at Town Hall 14Well 1Existing PLC is scheduled for End of Life in Well 1 internet connection $10,500 Approval of Quote 2021 and does not support Ethernet will be shared with Well 19-023 SQ15 communications. Replace existing PLC. Install 3B Internet Connection and VPN for direct X communications with other sites. Modify Fraser WTP PLC/OIT and Town Hall HMI computer for direct communications with Well. 15Well 2Existing PLC is scheduled for End of Life in Well 2 will utilize radio $10,500 Approval of Quote 2021 and does not support Ethernet connection to access 19-023 SQ16 communications. Replace existing PLC. Install internet connection at Internet Connection and VPN for direct Fraser WTP communications with other sites. Modify Fraser WTP PLC/OIT and Town Hall HMI computer for direct communications with Well. 16Well 3BExisting PLC is scheduled for End of Life in Well 3B will utilize radio $10,500 Similar to Quote 19- 2021 and does not support Ethernet connection to access 023 SQ16 communications. Replace existing PLC. Install internet connection at Internet Connection and VPN for direct Well 1 communications with other sites. Modify Fraser WTP PLC/OIT and Town Hall HMI computer for direct communications with Well. 17Well 5RExisting PLC is scheduled for End of Life in $10,500 Similar to Quote 19- 2021 and does not support Ethernet 023 SQ15 communications. Replace existing PLC. Install Internet Connection and VPN for direct X communications with other sites. Modify Fraser WTP PLC/OIT and Town Hall HMI computer for direct communications with Well. 18Well 7Existing PLC is scheduled for End of Life in Well 7 internet connection $10,500 Similar to Quote 19- 2021 and does not support Ethernet will be shared with Well 9023 SQ15 communications. Replace existing PLC. Install Internet Connection and VPN for direct X communications with other sites. Modify Fraser WTP PLC/OIT and Town Hall HMI computer for direct communications with Well. 19Well 9Existing PLC is scheduled for End of Life in Well 9 will utilize radio $10,500 Similar to Quote 19- 2021 and does not support Ethernet connection to access 023 SQ16 communications. Replace existing PLC. Install internet connection at Internet Connection and VPN for direct Well 7 communications with other sites. Modify Fraser WTP PLC/OIT and Town Hall HMI computer for direct communications with Well. 20Town Hall Phase 1: Replace exsiting Genesis-32 software Gen-32 will be $21,000 Plan to Implement HMI with Ignition software. Installed Locally on discontinued in 2020 and in 2020 Computer + new new computer, provided by Town.existing HMI is due for Softwarereplacement. 21Town Hall Phase 2: Add Microsoft Azure Cloud Services HMI screens can be $8,000 Plan to Implement HMI to provide redundancyaccessed from Town Hall in 2021 Computer + or Internet Software $89,871