Loading...
HomeMy Public PortalAbout11-0244 CooperDATE ISSUED: 05 -2 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT ADDED VALUE REROOF - SHINGLES 7 TENTH ST APTS JEAN K. COOPER 1070 JUDITH WAY NE ATLANTA GA 30324 -2905 404 - 759 -8960 ROOF CRAFTERS * ** PO BOX 61055 SAVANNAH GA 31420 P $ 104.00 ADDED VALUE TO TOTAL OF $7,300 $7,300.00 PERMIT #: 110244 TOTAL BALANCE DUE: $ 24.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: J„,.„.„) P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org DATE ISSUED: 05 -2 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REROOF - SHINGLES 7 TENTH ST APTS JEAN K. COOPER 1070 JUDITH WAY NE ATLANTA GA 30324 -2905 404 - 759 -8960 ROOF CRAFTERS PO BOX 61055 SAVANNAH GA 31420 P $ 80.00 lop PERMIT #: 110244 TOTAL BALANCE DUE: $ It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. x Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEOkuIA APPLICATION FOR BUILDING PERMIT II -oz(4-q- Location: a 1\ S T, NAME ADDRESS PIN # TELEPHONE Owner .Sec k.0 ,( 1 \ O�� ST t#�l..` 1 3 cg `k1 Architect or Engineer Building Contractor 1C "� ��� �� ft �1�� (Check all that apply) ❑ Repair © Renovation Ei Minor Addition ❑ Substantial Addition ❑ Other Details of Project: %e. Residential Single Family Duplex Multi- Family Commercial ❑ Footprint Changes ❑ Discovery ❑ Demolition 6.A% - . to niAr��- IJi?r.Z Estimated Cost of Construction: 3 Construction Type (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units Lot Area # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front # Bedrooms Living space (total sq. ft.) With culvert? Rear # Bathrooms With swale? Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by 72-c e by means of �t,,,en e e . I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: ---IC71f Signature of Appli an Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? NFIP Flood Zone Existing FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL 4C) LEGAL NOTICE CITY OF TYBEE ISLAND PERMIT WHEREAS, VIOLATIONS OF THE CODE OF THE CITY OF TYBEE ISLAND HAVE BEEN FOUND, NOTICE IS HEREBY GIVEN IN ACCORDANCE WITH THE ABOVE CODE THAT ALL PERSONS CEASE, DESIST FROM AND STOP WORK AT ONCE ON ANY CONSTRUCTION, ALTERATION, REPAIR, R FURTHER USE OF THESE P MISES KNO A AS UNTIL THE VIOLATION HAS BEEN CORRECTED AND APPROVED BY THE CITY OF TYBEE ISLAND. ALL PERSONS ACTING CONTRARY TO THIS NOTICE OR REMOVING OR MUTILATING IT ARE LIABLE TO SUMMARY ARREST UNLESS SUCH ACTION IS AUTHORIZED BY THE CITY OF TYBEE ISLAND.