Loading...
HomeMy Public PortalAboutAB 20-105 Ratio Design Additional Service #3 sewer relocation designMcCALL CITY COUNCIL 216 East Park Street AGENDA BILL McCall, Idaho 83638 Number AB 20-105 Meeting Date April 9, 2020 AGENDA ITEM INFORMATION SUBJECT: Request to Approve the Letter of Additional Service #03 for Relocation of Existing Pressure Sewer Main for City Campus with Ratio Design Department Approvals Initials Originator or Supporter Mayor / Council City Manager Clerk Treasurer Community Development Police Department Public Works Originator Golf Course COST IMPACT: ~$15,000 Parks and Recreation FUNDING SOURCE: City General Fund – Campus Improvements Fund Airport Library TIMELINE: ASAP – April/May 2020 Information Systems Grant Coordinator SUMMARY STATEMENT: Early in 2020, Ratio Design (formerly Humphries Poli), identified the existing Payette Lakes Recreational Water and Sewer District (PLRWSD) pressure sewer main (PS) located within the City’s campus conflicts with the proposed new library and campus plaza infrastructure. In reviewing this with the City’s engineering team and the City Manager, it is recognized that relocating this pressure sewer main is in the best interest of the City so that the City Campus property can be maximized to its full potential. Relocating the PS away from significant infrastructure and in a location that can easily be maintained by PLRWSD reduce impacts to the campus’s functionality and financial hardship for both agencies over the long term. Staff have identified that the timing of this relocation needs to be coordinated with the commencement of the reconstruction of Park Street (DC-PH-2B, between 3rd and 1st) to avoid having to cut/excavate into the newly reconstructed Park Street in the future. The first step in understanding the anticipated total cost of relocating the pressure sewer main is to complete the engineering design. Included herein is Ratio Design’s design proposal. The proposal identifies Crestline Engineers as the civil engineering sub-consultant to complete the relocation design, while still working with Ratio Design to assure the relocation will not conflict with the proposed improvements of the campus master plan, south of the proposed library. Crestline has great familiar with the project site and the 2020 Park Street improvements, as they are also working for the City on behalf of Horrocks to conduct construction engineering inspection (CEI) services for the Park Street reconstruction. Staff seeks Council approval of Ratio Design’s Letter of Additional Service #3. RECOMMENDED ACTION: Approve the Letter of Additional Service #03 for Relocation of Existing Pressure Sewer Main for City Campus with Ratio Design and authorize the Mayor to sign all necessary documents. RECORD OF COUNCIL ACTION MEETING DATE ACTION 12/19/2019 AB 19-286: Council approval of Letter of Additional Service #2 11/29/2018 Council identified CIHM site as preferred location for new Parks Maintenance Facility 11/22/2019 Council approves moving forward with Library Expansion and Parks department relocation