Loading...
HomeMy Public PortalAbout11-0281 BeranPermit No. City of 1 403 Butler Phone 7 Owners Name ,) 44 Gera. Contractor -ee Island • Community Develop._ .:nt Dept. Inspection Report Ave. • P.O. Box 2749 • Tybee Island, GA 31328 912.785.4573 ext. 114 • Fax 912.786.9539 Contact Info4 oration ri/n files t INTERNATIONAL CODE COUNCIL` MEMBER Date Requested 771/i f Date . seeded Subcontractor .y7 ,0ZJ Project Address /06)3 f `/ /-'1-7,--/ 4--0 Scope of Work /42L lam. ' ,, 7 1 • Inspector %/ 1 Date of Inspection inspection r -J4 7 -- fuss Fail ® Fee Inspection Pass Fawi Fee rnspection Pass ID Fail ❑ Fee Inspection ass Fail © Fee DATE ISSUED: 05 -12 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT ADD ROOF /SCREENING TO DECK 1003 FIFTH AVE CHARLOTTE &PAUL BERAN 6831 GLENDORA AVE DALLAS TX 75230 -5223 214- 977 -8168 FIRST CITY ENTERPRISES PO BOX 1016 TYBEE ISLAND GA 31328 P $ 93.00 $6,000.00 PERMIT #: 110281 TOTAL BALANCE DUE: $ 93.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org L.QA CITY OF TYBEE ISLAND, GEOkvIA APPLICATION FOR BUILDING PERMIT I t Location: NAME PIN # ADDRESS TELEPHONE Owner � N b : i 1 4 ` ' f ' ' 9 1603 1 0 pV - 7 Architect or Engineer JJ�► Building Contractor )iz, 1 pt`I %fXILlk I 'j1� J ®l�_C'Zjo (Check all that apply) 14 Y ❑ Repair ❑ Renovation NO Minor Addition Substantial Addition ❑ Other i �I Residential Single Family ❑ Duplex ❑ Multi- Family ❑ Commercial ❑ Footprint Changes ❑ Discovery ❑ Demolition Details of Project: 1.1c14 A goof qc caraz,PQA Af2s2P, to Cl2Ct. J» Estimated Cost of Construction: $ (t©o_ bD Construction Type / (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: )/Al , Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through O W,),R �--�-- On -site waste and debris containers will be provided by c�.)f �/ Construction debris will be disposed bycp,.,,J)'- by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. 1 understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Ar- Date: ) ) Signature of Applicant: %, Note: A permit normally takes 7 to 10 days to process. The _following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? NFIP Flood Zone FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Stoini/Drainage Inspections City Manager FEES _7<- Permit Inspections 133 Water Tap Sewer Stub Aid to Const. TOTAL l.� LEAD -BASED PAINT Adapted from http: / /www.epa.aov /lead /pubs /renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families Child Care Providers, and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead -safe work practices. • Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project. However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800- 424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information pamphlet. • Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead -safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements. • Read about how to comply with EPA's rule in the EPA Small Entity Complian e Guide to Renovate Right. Read about how to u e le -safe work practices in EPA's Steps to Lead Safi Renovation, Repair and Painting. YF OU'RENOT _LEAD -SAFE CERTIFIED, .DISTURBING JUST SIX SQUARE FEET COULD COST YOU BIG TIME. Printed Name ate Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Printed Name 5%) )) Dat Office Use Only: Project Address: Permit Number: June 30, 2010 The following deficiencies have reached an unacceptable level on the projects in the City of Tybee Island. While the deficiencies are not necessarily the fault of the Owner or his agent, they are their responsibilities. The two areas of deficiencies are in the two most basic and common BMPs on local projects. They are: Co — Construction Exit Sdl — Sediment Barrier Correct installation information can be found not only in the "Green Book" but in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, 4310 Lexington Road, P.O. Box 8024, Athens, GA 30603, telephone 706.542.3065, www.gaswcc.org, Georgia Soil and Water Conservation Commission; http: / /www.gaswcc.org /does/ f eld_rnanual_4ed.pdf. Problems with the Co is not limited to the installation, but to the material. Specifically, the job site personnel are telling me the stone delivered is the 1.5 " -3.5" stone they requested. I have experienced on my own projects suppliers not adhering to the specs they are given with the orders. While I regret this situation, I will no longer be accepting any deviation from the State requirements. The stone will be a representation of 1.5 " -3.5" stone or larger. Gradations that are obviously smaller will no longer be tolerated. The smaller stone allows for a smoother surface with smaller voids, thereby reducing the function of the construction exit. Similarly, I am finding Type A sediment barriers installed where Type C is required and shown on the permit drawings. I have attempted to work with the Owners through increased inspections, additional backup BMPs, etc. This has evidently become common knowledge based on the installations I am finding. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. There has been no discharge into state waters due to previous occasional deficiencies. However, the increased frequency has created unnecessary exposure to: 1) Sediment discharge into nearby waters of the State, 2) Increased maintenance efforts by the DPW on downstream lines. 3) Due to #2, higher cost to island taxpayers. I will be adhering strictly to the manual on all BMPs and not just these two. Downer Davis City of Tybee Island Consulting Engineer "At► Approved Set of Plans Mutt Remain on Job Site at AliTimes" AL CONSTRUCTION .: j 44 AND THE IRC ONE AND TWO :,,MiLY DWELLING CODE. Z i EDITION '8TATE OF GEORGIA AMENDMENTS LINE oP 20'ACCESS EASEMENT PER SURVEY �LUI 10'. 0" UIIES OF ROOF BELOW IDASIIEOI LAMS OF ROOF MOVE MASHED) NEW TREx DECKING OVER STRUCTURAL W000 FRAMING AS DESIGNED ES STRUCT7. ENGINEER PLAN NORTH 1 LINE OF ACS \— EASEMENT PER URv EY W DOW SSTD 10. TOPEPLLAGOEUFWWSITJICNHOINOO DD 11�C DOW, APPROVED POSITIVE A TO &MANGE /CLFAFWNCE AT EXISTING MASTE EXISTING MASTER CLOS REVIEW FOR CODE COMPLIANCE Every effort has been made to Identify code violations, no oversight by the reviewer shall be construed as authority to violate, cancel, alter or set aside any applicable codes or ordinances. The review and permit should not be ccnstrued as a Warranty or u rantae. Reviewed By pate -0Q-4 NEW PIROF FRENCH GOOKS TO REPLACE EXISTING WINDOWS (SNOWR DASHED). ADJUST HEIGHT TO MAXGMEE) CLEARANCE AT SOFFIT AND SKYLI 2A1, 602A2, 602A31 S R BR EXISTING MASTER BATH 3RD FLOOR PLAN Tf8"a1' -0" ND SICYL LLED TO COMPL VE PRESSURES, Sect. A.aasn 30" in HANDRAILS helS t. GUARDRAILS Stake more Than 3413$" handrails. Porches, balconies, ramp & deck"s more test "a snlnp � permitted is 4" guardrails. Largest opening Null NON" .I•. NUM -.. IMw 1111111 111111 111 :11 W000 PCKETS SPACED TO PREVENT A4' SPHERE FROM PASSING TFWOI L3H WIT I TOP OF 1504 LEVEL TO SEA: M EVGEROF EXISTWI RO)F S SIONG EXISTS)) FlABH FLOOR (FASTED) NEW REINFORCED SLOCK COLUMNS W WISH TO MATCH EX CRET: APPROX. 4 REAR (WEST) ELEVATION 1•.0" HERON HIDEAWAY 1003 10TH STREET CITY OF TYBEE IM MO GEORGIA INTERIOR PIERS PER FEMA REQUIREMENTS MINIMUM FOOTING 38 INCHES BY 36 INCHES WIDE BY 20 INCHES THICK, BOTTOM OF FOOTING MUST BE A MINIMUM 38 INCHES BELOW GRADE. EXISTING NEIGHBOR'S RESIDENCE v 7 a SITE PLAN APPROXIMATE AND BASED ON SURVEY FOR PAUL & CHARLOTTE BERAN DATED 11/18/08 BY BERT BARRETT JR. LAND SURVEYING, PC f 10 PROPOSED RAISED DEQQK SERVING TOP FL( OR / MASTER BR 10.81' (PIR SURVEY) Z 10'• Q" PROP. LINE 80.00' LINE OF 20' ACCESS EASEMENT PER SURVEY T SITg PJAN "++,0' W APPROX. r 1003 10TH STREET EXISTING 1 1/2 STORY FRAME RESIDENCE ON 14 V I. ei (yy^ CA T.j 0E 80.00' > O PROP. LINE W E g W W 0 APPROX. 9'- 3" VARIES 8.94' TO 8.95' 20' FRONT SETBACK PER ZONING i NOTE. NEW REINFORCED CONCRETE BLOCK COLUMNS I FOUNDATION ARO NEW DECK FRAMING TO SE DS &GNEO AND DETAILED SY STRUCTURAL ENGINEER WITH GEOROM RE0411,1AT01 WOOD PICKETS SPACED TO PREVENT 4 SPHERE FROM PASSING THROUGH NEW REINFORCED CONCRETE BLOCK COLUM 1B WITH STUCCO FINISH TO MAT.)1 EXISTING Io TOP OF IECK LEVEL TO RE AT'MERGER OF EKISTINOROOI t SIDE 0. TOP OF RAIL FINISH DECK In ffi h SIDE (NORTH) ELEVATION 118" =1' -0" HERON HIDEAWAY 1003 10TH STREET CITY OF TYBEE ISLAND GEORGIA 10'• 0" S81' PER SURVEY 5'• 0" NOTE' NEW RONFORCED CONCRETE (LOCK COLUMNS I FOUNDATION AND NEW DECK FRAMING TO OE DESIGNED AND PETNLED ST STRUCTURAL ENGINEER WITH GEORG*, REGGITRADON VD SPACED A4501-ERE NO THROUGH \A) IIt 5'- C r j. (0 6 TOP TONE ENSTI 6,01' PER SURVEY ckava T ME TGER OF ROOF & SONO NEW REiNFORCED CONCRETE 81.0C14 MINAS NON STUCCO FPriSH TO PIATCN DOSTNG ALL CONSTROCTION MUST COMPLY WITH THE THE !RC ONE /ANL, TWO FAMILY DINELLIN CODE.. ..... . ELM11014 ..M) STATE OF OEOROIA AMENDMENTS mumitamatiii 10'. 0" 20,01' PER SURVEY SIDE (SOUTH) ELEVATION 118" V- 0" HERON HIDEAWAY 1003 10TH STREET CITY OF TYEiEE ISLAND GEORGIA ALL CONSIMTION MUST COMPLY WITH THE SSTD__LO .919 _AD THE !PIG NE AHD TWO FAMILY 11WELLING CODE__IPP(.?, _EDITION AND STATE OF GEORQIA AMENDMENTS MACS. = MAO NAIL SET C.M.F. = CONCRETE MONUMENT FOUND R.B.F. s REAR FOUND CONC. = CONCRETE S 65'00'00" E 11.25' ti 49.79' • co K � m PORTION OF FIFTH AVENUE NOW OR FORMERLY DANIEL J. O'LEARY D.B. 3138 -164 S 65'00'00" E --- CONCRETE SLAB PORTION OF HIGH GROUND JACQUELYN R. BROWN 0.6. 302Q -576 D.B. 323J -446 46.59' S 65'21'53" E STATE OF GEORGIA CHATHAM COUNTY PLAT OF A PORTION OF FIFTH AVENUE AND 10th STREET LOCATED IN WARD 3, ON TYBEE ISLAND AND KNOWN AS No. 1003 FIFTH AVENUE, TYBEE ISLAND, GEORGIA. FOR: PAUL & CHARLOTTE BERAN DATE OF SURVEY: NOVEMBER 15, 2005 DATE OF PLAT NOVEMBER 19, 2008 BERT BARRETT JR LAND SURVEYING, PC 145 RUNNER ROAD SAVANNAH, GA. 31410 (912) 897 -0661 R.B.F. in CV 4 0 in 8 60.50' 20' ACCESS EASEMENT -` D.B. 2020 -264v WWD LOT 144 NOW OR FORMERLY DANIEL J. O'LEARY D.B. 3138 -164 89.,1' 80.00' k 19.50' U yr. V IWOOD PRIVACY FENCE EXISTING 1 -1/2 STORY FRAMON E RESIDENCE PAS POR110N OF FIFTH AVENUE NOW OR FORMERLY CECIL R. & EUZABETH JOHNSON D.B. 1591 -375 •s 4 004,0 1181' 10th STREET R/W VARIES 0 201.97' X 4. X 11 1'53" W : LOT 145 20 GRAPHIC SCALE 0 20 40 I. inch 620 it N 6521'53' W 109.93' C) REFERENCES: 1. DEED BOOKS 1096 -240, 2020 -264, 211M-691, 2666 -187. 3020 -576. 323J -446 & 3050 -246. 2. PLAT RECORD BOOK 33P -02. E.O.C. FIELD < ERROR/POINT ADJ. METHOD E.O.C. PLAT TOTAL STATION 1/ 18,000 1' NONE 1/ 30.322 GEODIMETER 610 tC 0 m W z J4i4 0 IN MY OPINION THIS PLAT IS A CORRECT REPRESENTATION OF THE LAND PLATTED PROJECT \00101 —C 11 -19 -08 9:23:31 am EST 2011 Chatham County Board of Assessors Property Record Card Page 1 of 1 Requested By: READONLY 6/29/2010 4 -0012 -01 -015 1003 5TH ST TYBEE ISLAND APPRAISER staff LAST INSP 03/26/2004 APPR ZONE 000008 INTERSECTION OF TENTH ST + FIFTH AVE BERAN PAUL & CHARLOTTE TYBEE PRB 33P 2 PRB 41P 43 6831 GLENDORA AVE DALLAS, TX 75230 CAMA ASMT 200,300 186,000 LAND 2 143,800 132,500 BLDG 1 13,900 0 OBXF 2 358,000 318,500 MORATOR SALES BOOK! PAGE INS VI QU RSN PRICE CODES - PROPERTY USE 0006 Residential UTA 0004 Tybee Island NBHD 020222.00 T222 Tybee Horse Pen EXEMPTIONS 0/23/2008 347L 0712 WD I U FS 317,000 GRANTOR JP MORGAN CHASE BANK NAT, GRANTEE: BERAN PAUL & CHARLOTTE, 8/5/2008 344Z 0331 NA I U FC 507,516 GRANTOR. BROWN JONATHAN WILLIAM 8J, GRANTEE. J P MORGAN CHASE BANK NAT, 4/14/2006 305D 0246 QC I Q QX GRANTOR, Multi Property Sale GRANTEE, BROWN JACQUELINE B, - PERMITS TYPE DATE AMOUNT HISTORY LAND IMPR TOTAL 10 -0046 WO 2/1/2010 Issued 12,200 080438 GM 10/17/2008 Issued 9,800 _ 2010 186,000 132,500 318,500 MAV 2009 186,000 132,500 318,500 Over 2008 286,000 133,500 419,500 Cama 2007 240,000 133,500 373,500 Cama 2006 69,500 187,000 256,500 Over COMMENTS 10/13/2008 TY09 10S REM 10/13/08LN 3/252008 FOR SALE 528/07 3/132007 ADD CNG PER ONR 31/07 APW 6/12/2006 2007 DIMENSION CHG PER PRB 33P 2 6/1/206 PL NOTES BUILDING SECTION 86648 -1 CONSTRUCTION TYPE RCN AVE EYE DEP TYPE PHYS ECON FUNC OBSV /% TOTAL DEP% RCNLD U.FACTOR MKT VAL Residential 158,025 2000 2000 MS 9.00 0.00 0.00 0.00 9.00 143,803 143,800 30 ' SECTION TYPE 1 - Main AREA 1,836 TYPE 1 - Single- family Residence FRAME 1 - Stud Frame STYLE 5 - 1 1/2 Story Finished 100.00% QUALITY 4.00 CONDITION 3.00 # UNITS 0 #OF BEDS /BATHS 3 / 2.10 41 • • CPT Carport MI BasF /}Ping Area 1836 3• 1 , COMPONENTS UNITS % QUAL R1 108 Frame, Siding, Wood - 100.00 R2 208 Composition Shingle - 100.00 R3 352 Heat Pump - 100.00 R4 402 Automatic Floor Cover Allowanc - - R6 601 Plumbing Fixtures ( #) 12.00 - R6 602 Plumbing Rough -ins ( #) 1.00 - R6 622 Raised Subfloor (% or SF) - 100.00 R6 642 Single 2 -Story Fireplace ( #) 1.00 - R11 904 Slab Porch (SF) with Roof 246.00 - jLB 4• 3� Slab Porch with Roof 246 EXTRA FEATURES ID# BLDG # SYSTEM DESC DIM 1 DIM 2 UNITS QL UNIT PRICE RON AYE EYB DT ECON FUNC SP SP% RCNLD MKT VALUE 141099 86648 OPEN SLAB GD 0 0 246.00 G 4.88 1,200 2000 2000 IR 1,092 1,100 141100 86648 Gd Cpt Flat/Shed Rf 0 0 1,224.00 G 11.48 14,052 2000 2000 IR 12,787 12,800 LAND ID# USE DESC FRONT DEPTH UNITS /TYPE PRICE ZONING SIZE LCTN TOPO OTHER ADJ1 ADJ2 ADJS ADJ4 MKT VALUE 111306 SINGLE FAMILY RES 0 0 4,500.000 SF 62.00 R2 1.00 195,300 111307 SINGLE FAMILY RES 0 0 460.000 SF 62.00 R2 1.00 SZ -75 5,000