Loading...
HomeMy Public PortalAboutAB 20-125 Clear Solutions AgreementMcCALL CITY COUNCIL 216 East Park Street AGENDA BILL McCall, Idaho 83638 Number AB 20-125 Meeting Date April 23, 2020 AGENDA ITEM INFORMATION SUBJECT: Request to Approve the Engineering Services Agreement for Clear Solutions Engineering, LLC - Legacy Beach Intake Station Reconstruction Project Department Approvals Initials Originator or Supporter Mayor / Council City Manager Clerk Treasurer Community Development Police Department Public Works Originator Golf Course COST IMPACT: $24,400 Parks and Recreation FUNDING SOURCE: Water Fund Airport Library TIMELINE: April – September 2020 Information Systems Grant Coordinator SUMMARY STATEMENT: The City’s Legacy Beach water intake station has been located within Legacy Park since the late 1950s. More recently, the western portion of the building has been experiencing a subsiding foundation. Addressing this problem was identified in the 5-year CIP of the City’s 2017 Water Master Plan. In Fall 2019, staff developed an in-situ micropile foundation stabilization that would not require demolition but were unable to receive a responsive bid for the project. Therefore, only temporary measures we made last Fall to assure against failure due to snow loading during the winter. Staff and our consulting team have re-evaluated the project in its entirety. A concept report was prepared by SPF Water Engineers (SPF) in March 2020 that provided an assessment of the cost of improving the aged facility for the future. We now understand that full reconstruction of the failing portion combined with an overall cosmetic facelift and securing the required conditional use permit (CUP) to entitle the facility Legacy Park’s civic zoned property will provide the most efficient way of implementing the improvements. To complete this project, staff will utilize architectural and engineering consultants to prepare plans and specifications required for both the building and the surrounding park area improvements. Clear Solutions, LLC will provide water engineering and civil design services. Attached is their proposal that includes preparing a Preliminary Engineering Report (PER) and other civil design elements required for Idaho Department of Environmental Quality (IDEQ) approval as well as construction, and land use application submittals to Planning and Zoning and City Council. Clear Solutions is owned by a former principal of SPF that was the City’s primary contact for water projects for the past 7 years. Architectural and structural design services will be provided under a separate agreement with local architect, Legrand Bennett. City entitlement and land use applications relating to the project will primarily be managed by Public Works staff. RECOMMENDED ACTION: Approve the Engineering Services Agreement with Clear Solutions Engineering, LLC, and authorize the mayor to sign all necessary documents. RECORD OF COUNCIL ACTION MEETING DATE ACTION