Loading...
HomeMy Public PortalAbout11-0322 Funky Fish OutdoorsORDINANCE NO. 38-2010 AN ORDINANCE TO AMEND THE CODE OF ORDINANCES TO AMEND SEC. 3 -050, OBSTRUCTION TO VISION AT STREET INTERSECTIONS, FOR THE CITY OF TYBEE ISLAND, GEORGIA WHEREAS, the duly elected governing authority for the City of Tybee Island, Georgia, is authorized under Article 9, Section 2, Paragraph 3 of the Constitution of the State of Georgia to adopt reasonable ordinances to protect and improve the public health, safety, and welfare of the citizens of Tybee Island, Georgia, and WHEREAS, the duly elected governing authority for the City of Tybee Island, Georgia, is the Mayor and Council thereof, and WHEREAS, the governing authority desires to adopt ordinances under it police, zoning, and home rule powers, and WHEREAS, the City of Tybee Island so as to amend Section 3 -050 of the Land Development Code pertaining to unsafe structures; and NOW, THEREFORE, be it ordained by the governing authority of the City of Tybee Island that Sec. 3 -050 is amended so that it will hereinafter read as follows: Sec. 3 -050. Obstruction to visions at street intersections. Intersection requirements are intended to provide better vehicle safety on the public roads. A clear sight triangle gives motorists a view of other oncoming motorists when approaching a road intersection. On all corner lots, no fence, shrubbery or other obstruction to traffic sight vision, except utility poles or light or sign standards, shall encroach into an area as measured from three feet above the level of the adjacent driving surface to ten feet above the level of the adjacent driving surface, within a triangular area formed by the intersection of the right -of -way lines of two streets and a diagonal line which intersects the right -of -way lines at two points, each 25 feet distance from the intersection of the right -of -way lines or, in the case of a rounded corner, from the point of intersection of their tangents except where site conditions require greater or lesser setbacks as determined by a traffic engineer. See Illustration 1 for visual clarification. DATE ISSUED: 06 -3 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT 30 -DAY BANNER - 3RD & BUTLER 211 BUTLER AVE A FUNKY FISH OUTDOORS PO BOX 585 TYBEE ISLAND GA 31328 912 - 786 -9590 FUNKY FISH OUTDOORS PO BOX 585 TYBEE ISLAND GA 31328 P $ 15.00 $ 120.00 PERMIT #: 110322 TOTAL BALANCE DUE: $ 15.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org " CITY OF TYBEE ISLAND, GEGI.GIA APPLICATION FOR BUILDING PERMIT 0 3 2 2 . 44- 1' Location: &Her Av-e-. NAME all ADDRESS PIN # TELEPHONE Owner WI A AN&l'✓D/ /2/ c4 1 4i/ ! / Z.3 Of -TN Architect or Engineer Building Contractor (Check all that apply) ❑ Repair ❑ Residential ❑ Renovation ❑ Single Family ❑ Minor Addition ❑ Duplex ❑ Substantial Addition ❑ Multi - Family Other ❑ Commercial Details of Project: LI X bctnners Ab ct,d e -4-6 Q -f-u em=u t CDI Vt hv,lj 0 n nr lk;4r ct'l U Cr) C' 1 t„4A.%h: r)W & M1— e,- Estimated Cost of Construction: $ ❑ Footprint Changes ❑ Discovery ❑ Demolition ns c'nType (1) Wood Frame (2) Wood & Masonry 3) Brick Veneer Pro. , ed use: Remarks: (Enter appropriate number) (4) Masonry (6) Other (please specify) (5) Steel & Masonry ATTACH A COPY OF CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on e construction drawingsrand site plan: # Units # Bedr Lot Area Livin # Off - street parking spaces Trees located & listed on site Access: Driveway Setbacks: $ 1nt r # Bathrooms +ac- total sq. ft.) s With culvert? Rear With Swale? s (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by /�/,�,q /Vf by means of /�4 1 understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage imp ired by this permitted construction. Date: rl Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? NFIP Flood Zone Existing FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL