HomeMy Public PortalAbout11-0325 Evans_1of2City of Tybee Island • Community Developr wnt Dept.
Inspection Report
403 utter Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786. 4573 ext. 114 • Fax 912.786.9539
Permit No. /1- 0 Z S
MUM
INTERNATIONAL
CODE COUNCIL`
MEMBER
Date Reau;:.stec =�'' > /Ii.,
Owner's Name IT Lif:3 Date Needed
Gen. Co tractor 7,1e-
,i)AS--11, : ;'•• Subcontractor
Contact tnfo6 oration :'07� - ; 1
Project Address t r�- ut,2f- Atl
Scope of Work YiI . vz. ;�'itr�f _� LA_�..j i,,•i
t
Inspector '? l `t Date of Inspection . / 1' i! ,,,
Inspection ?7 1-1,-.r,-..;- 4. , ,» f - Pass 0 Fail ® Fee
1.);_,, c::::Ici. ,; 4----,-.), /..:,---A" -
7-`
Inspection Pass (l 'pail ❑ Fee
Inspection Pass Fail El F--ee
Inspection Pass
Fail in Fee
CITY OF TYBEE ISLAND
BUILDING PERMIT
ADDED SCOPE & VALUE
DATE ISSUED: 10/25/2011
WORK DESCRIPTION FENCE /STEP BRDS /CEILNGS /SHTTRS
WORK LOCATION 4 SECOND AVE
OWNER NAME J P EVANS
ADDRESS 827 FAIRWAYS CT STE 201
CITY, ST, ZIP STOCKBRIDGE GA 30281 -9068
PHONE NUMBER
CONTRACTOR NAME COASTLINE BUILDERS INC
ADDRESS 16 LUFBURROW WAY
CITY STATE ZIP SAVANNAH GA 31411
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 154.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $17,142.00
ADDED $5,500 FOR 8 WINDOWS
PERMIT #: 110325
TOTAL BALANCE DUE: $ 16.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
0.0
tkr?
oo
City of \., aee Island - Community DeveloF._ ent Dept.
Inspection Report
403 Butler Ave. • P.O- Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. ) - 7:52:S.... O Date Requested /ziiii
Owner's Name L °+JA Date Needed IZ2_1r1
Gen. Contractor Li , 3 --Y.J 130:::-/) Subcontractor
Contact Information !__i_ ';�_� � -
INTERNATIONAL
CODE COUNCIL
MEMBER
Project Address L} ,\)-> ,/d{J
r
Scope of Work r .;:._.�� •'1 ,� 4.r '71 4=,i� , %����- �.�� -�
Inspector r'1 Date of Inspection i
Pass Gil ® Fee
Inspection , ti
Inspection
cx d 1 Coo JNaJcv&Q)
II re I a- C.e-w.�,..--1 I a G
1 n 1�a. � Ts-s- v e-d P
Pass ❑ Fail ® Fee
Inspection Pass Fail 0 Fee
Inspection Pass ❑ Fail ❑ Fee
City ofee Island • Community Developti_..1'nt Dept.
Inspection Report
403 Butler Ave. P.O. Box 2749 ^ Tybee Island, GA 31328
Phone 912.766„4573 ext. 114 Fax 912.766.9539
Erklik
LIM=rd
INTERNATIONAL
CODE COUNCIL
MEMBER
Permit _No. 1 1 - 0 32 c Date Requested LO - / -I 1
Owner's Na me E--/ VC n 5 1-/- 0 C •:1-3 (-N Date Needed . (//, - ? - I l
Gen. Contractor LOOS 1 'IA/2- 13 i_ (- • Subcontractor
Contact Enforrmation '-- 0 b 14 14 - 9 2 R 1
Project Address I-A eb 0 n CI Act/Q•
Scope of Work ,--.e t) e/S-Ii? 9 boos ci s- / 1) o r c' 1,‘ ( e 1 .' s /
Inspector Date of Inspection
...--,
Inspection Z 3 -1-:(s ...c,r -L 9 n c e pass-9-----
— 1) `.-:(.....J .-.:',:_,r---"-__ir" Q /
\/(-1)
Inspection Pass
c (-)
0 ( , --
Fail Fee
Inspection Pass El Fail El Fee
Inspection Pass Fail re- Fee
CITY OF TYBEE ISLAND
BUILDING PERMIT
DATE ISSUED: 06 -6 -2011 PERMIT #: 110325
WORK DESCRIPTION FENCE /STEP BOARDS /PORCH CEILINGS /SHUTTERS
WORK LOCATION 4 SECOND AVE
OWNER NAME J P EVANS
ADDRESS 827 FAIRWAYS CT STE 201
CITY, ST, ZIP STOCKBRIDGE GA 30281 -9068
PHONE NUMBER
CONTRACTOR NAME COASTLINE BUILDERS INC
ADDRESS 16 LUFBURROW WAY
CITY STATE ZIP SAVANNAH GA 31411
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 138.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $11,642.00
TOTAL BALANCE DUE: $ 138.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
.104.vve-) aZ&
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEOID :A
APPLICATION FOR BUILDING PERMIT
(/-.-O32�
Location: l 2 N /4\1
NAME
j Ty c E inc` 3l3 _SPIN#
ADDRESS
TELEPHONE
Owner
R o N N-4-1) J1
2ZZ CL-t, a i l∎ 6
S �j U - O I-L
S 3
Architect
or Engineer
der c--(- ( ccm eg-
1,1Z -33
Building
Contractor
C' (.Z N ` (2_r
04 .c 13, IdrS.
(Check all that apply)
Repair
Renovation
Minor Addition
n Substantial Addition
n Other I-e.ncr�.
I1
Details of Project:
c.(Residential
❑ Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
C NSktJL+ Ee9Le... iN crow
lI J
Estimated Cost of Construction: $
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ob 8LP+- .928'1
Footprint Changes
Discovery
n Demolition
tjtLL, ce.i«JCzS + CL
(Enter appropriate nu`�ber"
(4) Masonry
(5) Steel & Masonry
6 Other ,. e s s e
IO LI-II acLLASCvCcDJ
Lpe,
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and'complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.)
Setbacks: Front
# Bedrooms
Living space (total sq. ft.)
With culvert?
Rear
# Bathrooms
With swale?
Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by
by means of r iSo ,41/ V
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 3 / / ( Signature of Applicant: �� /J ✓v�
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
LEAD -BASED PAINT
Adapted from http: / /www.epa.gov /lead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented
by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information
pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools.
Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation
disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by
child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair
and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee
payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or
disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and
planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care
Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1- 800 -424-
LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child-
care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may be
used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices.
To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The
Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation,
Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course
you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to
become a certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• •_'ad about how to o
how, • u lead -safe work practices in EPA's Steps to Lead Safe Rgrhovation, Repair and Painting.
,1F YOU'RE NOT
LEAD-SAFE CERTIFIED,
.DISTURBING"
-JUST SIX
SQUARE FEET
COULD COST YOU
'BIG TIME.
y with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
Sign
Printed Name
Date
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned
Printed Name
Ocin;T&J
5-3//t(
Date
Office Use Only:
Project Address:
Permit Number:
2010 Chatham County Board of Assessors
Property Record Card Page 1 of 1 Requested By: READONLY 6/28/2010
4 -0003 -17 -013
4 2ND AVE TYBEE ISLAND
APPRAISER tlwhitfi
LAST INSP 06/12/2007
APPR ZONE 000008
PARCEL B RESUB OF LOTS 44 45 EVANS JULIUS P
UNNUMBERED LOT & PT OF RI GH T OF 202 EAGLES LANDING WAY
WAY WARD 1 TY MCDONOUGH, GA 30253
CAMA ASMT
1,581,800 1,581,800 LAND 2
356,200 356,200 BLDG 1
93,200 93,200 OBXF 5
2,031,200 2,031,200 Cost - MS
SALES BOOK /PAGE INS VI QU RSN PRICE
CODES .....
PROPERTY USE 0006 Residential
UTA 0004 Tybee Island
NBHD 020204.00 T204 Tybee Beachfron
EXEMPTIONS
2/29/2008 347M 0348 WD I U UR 1,059,780
GRANTOR: EVANS PEGGY E,
GRANTEE. EVANS JULIUS P,
8/4/2008 343W 0695 WD I U UR 2,400,000
GRANTOR EVANS JULIUS P & PEGGY E-,
GRANTEE EVANS PEGGY E,
9/12/2004 287L 0693 WD V U UR -
GRANTOR: J P EVANS CONSTRUCTION CO,
GRANTEE: EVANS JULIUS P & PEGGY E-,
PERMITS TYPE DATE AMOUNT
HISTORY LAND IMPR TOTAL
030557 CO 2/8/2005 Comp -
040251 PO 2/8/2005 Comp 35,000
030557 NC 2/8/2005 Comp 240,000
2010 1,581,800 449,400 2,031,200 Cama
2009 3,117,000 3,117,000 Over
2008 2,433,500 683,500 3,117,000 Cama
2007 1,090,000 683,500 1,773,500 Cama
2006 1,090,000 683,500 1,773,500 Cama
COMMENTS 2/3/2008 TY09 PER FAXED REQUEST HS 10S REMVD NJV 2 -3-09 RENTAL
7/28/2008 TY09 105 ENT PER JULIUS 7/28/8
7/18/2008 1982 SPLIT OUT OF 4- 3 -17 -13
7/18/2008 ADD CHG PER FORM 07/18/08 OLB
NOTES
BUILDING SECTION
84654 -1
CONSTRUCTION TYPE RCN AYE EYB DEP TYPE PHYS ECON FUNC OBSV /% TOTAL DEP % RCNLD U.FACTOR MKTVAL
Residential 371,073 2004 MS 4.00 0.00 0.00 0.00 4.00 356,230 356,200
29'
18' 12'
SECTION TYPE 1 - Main
AREA 3,659
TYPE 1 - Single- family Residence
FRAME 1 - Stud Frame
STYLE 2 - Two Story 100.00%
QUALITY 5.00
CONDITION 3.00
# UNITS 0
#OF BEDS /BATHS 4 / 4.00
2
2'
I ■UNDR
Slab. nab under 60i
COMPONENTS UNITS % QUAL
■tic �,
Bare (lulus Aria I
�
'= 13' I I
b'
■ 1 +NDR
Slsb+r.lVp7s a4dte
■1„
Raw Lblog Arra
!Mb
R1 108 Frame, Siding, Wood - 100.00
R2 214 Metal, Preformed - 100.00
R3 351 Warmed & Cooled Air - 100.00
R4 402 Automatic Floor Cover Allowanc
R6 601 Plumbing Fixtures ( #) 17.00
R6 602 Plumbing Rough -ins ( #) 1.00
R6 622 Raised Subfloor (% or SF) - 100.00
R11904 Slab Porch (SF) with Roof 368.00 -
( ) oo
R11904 Slab Porch (SF) with Roof 604.00
R11904 Slab Porch (SF) with Roof 604.00 -
1,
'
33'
• ■UNDR paw
WO
Slab ...Was soda ■
�
Wu
Base UWUgArr.
Barr thug Area
13 +g j . f]eo
RUNDR
SlabwWa6 under
5 -:;• 13'- -.,..
11'
12•
SlabParclgWlb Root 8'.
WOO
Wong Perk
EXTRA FEATURES
109 BLDG # SYSTEM DESC DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYE EYB DT ECON FUNC SP SP% RONLD MKT VALUE
137053 84654 SWIM /PL IN GRD CON 16 32 512.00 V 49.38 25,283 2004 2004 2R 19,215 19,200
137054 84654 Roof Scr Por /Slab 0 0 604.00 V 27.22 16,441 2004 2004 6R 15,783 15,800
137055 84654 Slab w/walls Under 0 0 1,922.00 V 18.64 35,826 2004 2004 6R 34,393 34,400
137056 84654 Solid Wall /Slab VG 0 0 685.00 V 34.57 23,680 2004 2004 6R 22,733 22,700
137057 84654 WOOD DECK VG 8 8 64.00 V 22.92 1,467 2004 2004 2R 1,115 1,100
LAND
108 USEDESC FRONT DEPTH UNITS /TYPE PRICE ZONING SIZE LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
108864 ATLANTIC OCEAN FRONT 70 157 70.000 FF 32,500.00 R1 1.00 DP 4 1,537,900
108865 ATLANTIC OCEAN FRONT 8 157 8.000 FF 32,500.00 R1 1.00 DP 4 SZ -75 43,900
Chatham County : Property r 'cord Cards Page 2 of 2
(c1OSE X
http:// prc. chathamcounty .org/PropertyRecordCards.aspx ?PIN =4 -0003 -17 -013 6/6/2011