HomeMy Public PortalAbout11-0336 ClarkCity of l ee Island • Community Develop _Int Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. :e.14 • Fax 912786.9539
Permit No. f / d (,
wner's Name
Gen. Contractor / /Z. J/c/.„
Contact Information
INTERNATIONAL
CODE COUNCIL`
MEMBER
Date Ree vested /21/2 -r
Date Needed % zl
Subcontractor
Project Address
Scope of Work / _ ' / . 2 1 ) ) . :
Inspector -2j�,
Inspection
=f
<2,47)/(1
Date of Inspection
Pass iI ® Fee
.Inspect €on Pass
Fa i Fee
Inspection Pass D Fail 0 Fee
Inspection Pass
Fail 0 Fee
DATE ISSUED: 06 -9 -2011
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REROOF GARAGE - METAL ROOF
1609 LOVELL AVE
OWNER NAME M. B. CLARK
ADDRESS PO BOX 253
CITY, ST, ZIP TYBEE ISLAND GA 31328 -02.53
PHONE NUMBER
CONTRACTOR NAME JIMMY JENKINS JR ROOFING INC
ADDRESS PO BOX 30248
CITY STATE ZIP SAVANNAH GA 31410
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
P
$ 69.00
PROJECT VALUATION $1,680.00
PERMIT #: 110336
TOTAL BALANCE DUE: $ 69.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
0,,eb
Jun 09 11 04:54p JJJ ROOFING INC.
From:CITY OF TYBEE ISLAND
912 786 9539
9128982217 p.2
06/09120,. 15 :19 #990 P.0011006
k
1
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
I_o33!4.
•
Location: ; ( V PIN #
ADDRESS
TELEPHONE
Owner
OAc 1c..� Cl4rk
1'.(P+
Lov..11
r�vf `1L1�
7 `I( V
Architect
or Engineer
Building
Contractor
f
/ r M
S
/2rl�`4
(Ch all that apply)
Repair Residential
❑ Renovation 0 Single Family
❑ Minor Addition ❑ Duplex
❑ Substantial Addition ❑ Multi- Family
❑ Other 0 Commercial
Details of Project: t 2e. f v 7(a a in e- r 1 i 2,,.> > 3,
❑ Footprint Changes
❑ Discovery
• Demolition
Estimated Cost of Construction: $ 1
D
Construction Type I (Enter appropriate number)
(I) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use: ( c . r c� 5 c......-
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units it Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off- street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories i Height i Vertical distance measured from the average a ijacent
grade of the building to the extreme high point of the building, exclusive of chimneyl, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
Jun 09 11 04:55p JJJ ROOFING INC.
Froe:CITY OF TYBEE ISLAND 912 786 9539
During construction:
On -site restroom facilities will be provided through LA +�{ ,2�,,•, s�
On -site waste and debris containers will be provided by .g.r.,
Construction debris will be disposed by S S by mear{s of . p i I cr .
1 understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I and 4rstand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
respo4sibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: — J -~ I1 Signature of Applicant:
a
Note: k permit normally takes 7 to 10 days to process_
The fo +Flowing is to be completed by City personnel:
Zoning' certification
Approved rezoning /variance?
Street address and number: New
Is it inj compliance with City map?
If not, 'has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
9128982217
06!0912011 15:19
p.3
#990 P.002/006
NFIP Flood Zone
Existing
Utilities and Public Works:
Describe any unusual findings)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approyais: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
Jun 09 11 04:55p JJJ ROOFING INC.
Fron:GITY OF TYBEE ISLAND 912 786 9539
mmw
mama
GEORGIA
r
9128982217 p.4
061091201. 15:20 990 P.0041006
iv
Permit Acknowledgement of
AsbestoslEnvl.ronmaental Notification to Georgia EPD for
Projects !involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) flay "Project
Notification for Asbestos Renovation Encapsulation or Demolk!ojt" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. in most cases, the rules require both the owner and the involved contractors 4:o assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without enemption. Georgia EPD requires 'a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
crese iu lilt b ii dii:Y. :Further Taidai ce for re aiiai ry �C 2l ":Tu;si.::... r.# :'cii• is° ___..._
Office Use Only:
Project Address:
Permit Number:
Jun 09 11 04:56p JJJ ROOFING INC.
From:CITY OF TYBEE ISLAND 912 7B6 9539
9128982217 p.5
06!09/20.. 15:20 :t990 P.003/008
LEAD -BASED PAINT
Adapted from http:// www. epa .clovllead/pubs/renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before begins ;ng work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families. Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre - renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an aoclication for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.'„
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect Aril 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's 5teos to Lead Safe Renovation. Re, _Jr and Painting.
Information for Homeowners Working at Home
if you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre-1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate R,aht: Important Lead Hazard Information for Families. Child
Care Providers. and Schrzpls lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 In Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child Care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pae- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families. Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities cart create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre - renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training orovider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your dient what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records tc demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepino checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to Comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Rght.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation. Reoa,r and Paint.
VOL:RENOT
Ial. to /i :'r;rf :fir
ISTURBI
SIX
SQUaE FEET
`'OJiDosT.•JU
BIG TIME
Signature " Date
Printed Name
Jun 09 11 04:54p JJJ ROOFING INC.
F A X
JIMMY JENKINS JR.
ROOFING INC.
PO B 30248
SAVANNAH GA.
31410
9128982217
To: r' r-s D
Fax number: �. -� -Z Yt, - 3 9
p.1
From: JIMMY OR SANDI
Fax number: 912- 898 -2217
Date:
Regarding: C_lc:tr1/.
Phone number for follow -up:
912 -355 -4526
t . Mrs v f
(at-,t( S)Ne