Loading...
HomeMy Public PortalAbout11-0385 Wilets_1of2City of Z T.ee Island • Community Develop„ Jilt Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Permit No. 1�- 0 325-- 3 Owner's Name 1 5 Gen. Contractor V� Contact Information Project Address Scope of Work F Inspector %0 I(S. 1 INTERNATIONAL CODE COUNCIL' MEMBER Date Requested Date Needed 09-2?—(1 Subcontractor -�� ci 7z 39 a-12,o s I yS Inspection P Date of Inspection Pass inspection Pass Fail LJ Fee Inspectio Pass Fail El Fee Inspection Pass ❑ Fail ❑ Fee Permit No. City of Tee Island • Community Development Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Date Requested 7—/q- MUM / q - INTERNATIONAL CODE COUNCIL' MEMBER G oner's Name V, 1 P 4",c Date Needed Gen. Contractor 00,n U'. Pry. /S Subcontractor Contact Information r? Project Address f f i/ 7239 (9 l Ave, . Scope of Work . . r '� S Inspector Date of Inspection Inspection -1; o a Pass 137Fail Fee Inspection Pass LJ Fail Fee Inspection Pass El Fail r"'1 Fee Inspection Pass r — Fail 0 Fee DATE ISSUED: 07 -11 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP CITY OF TYBEE ISLAND BUILDING PERMIT INSTALL PATIOS /WALKWAYS 1111 LAUREL AVE GREGORY WILETS 1111 LAUREL AVE TYBEE ISLAND GA 31328 -8748 CONSOLIDATED SERVICES PO BOX 60593 SAVANNAH GA 31420 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 51.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $1,200.00 PERMIT #: 110385 • Deck boards to be spaced the width of the nails used to place them. • Hold Harmless agreement in file. • 65% of setbacks to remain greenspace. TOTAL BALANCE DUE: $ 51.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: 1/1 / � v 2 NAME ADDRESS I, h ar tyd es-5 PIN# q- ooZco -o4- Q/Z TELEPHONE (Check all that apply) ❑ Repair [}Residential ❑ Renovation [angle Family ❑ Minor Addition ❑ Duplex ❑ Substantial Addition ❑ Multi- Family Other cJ_ /S /oLe . l Commercial n Footprint Changes ❑ Discovery n Demolition Details of Project: 54.94/ S / d .sue k S ,8-S Estimated Cost of Construction: $ 1'ZOO. ° ° Construction Type C /) (Enter appropriate number) (I) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY Of LOT and complete the following information sed on the construction drawings and site plan: # Units #Bedroom " # Bathrooms Lot Area Livi g pace (total sq. ft.) # Off - street parking spaces Trees located & listed o¢. -site plan , Access: Drivewa r (ft.) With culvert? -- With swale? Set. - s: Front Rear Sides..( (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. &@c2_1v- dc./t.-CL.- Ill / LRu2eL /que g1Z- Owner LvI'lefs 'Ty 10J-2_ 7 fj.. -d 4,4 . '78-8q V--? Architect or Engineer ` ti /- Building L'o4.isol,olgfth P -o. 00 coosg3 9/Z -ro58- Contractor 612-"" /C-g-1 l e-e f'''2'" 5,4-v ,✓,a -y4, iD ar 314/i0-. -7 2 3 S (Check all that apply) ❑ Repair [}Residential ❑ Renovation [angle Family ❑ Minor Addition ❑ Duplex ❑ Substantial Addition ❑ Multi- Family Other cJ_ /S /oLe . l Commercial n Footprint Changes ❑ Discovery n Demolition Details of Project: 54.94/ S / d .sue k S ,8-S Estimated Cost of Construction: $ 1'ZOO. ° ° Construction Type C /) (Enter appropriate number) (I) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY Of LOT and complete the following information sed on the construction drawings and site plan: # Units #Bedroom " # Bathrooms Lot Area Livi g pace (total sq. ft.) # Off - street parking spaces Trees located & listed o¢. -site plan , Access: Drivewa r (ft.) With culvert? -- With swale? Set. - s: Front Rear Sides..( (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through 0 ti 5/ T E /304-rr4 On -site waste and debris containers will be provided by C or Construction debris will be disposed by Lo,-;- ite.rc or by means of -rrzvae understand that 1 must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as- built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. - -� Date: - Z - 11 Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The,following is to he completed by (.'ity personnel: Zoning certification Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to M PC? NFIP Flood Zone FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager Signature • Date FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL LEAD -BASED PAINT Adapted from http:// www. epa .gov/lead /pubs/renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead -safe work practices. • Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping_checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project. However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800- 424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants sign a pre - renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information pamphlet. • Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: Take training to learn how to perform lead -safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair, and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may take the 4 -hour refresher course instead of the 8 -hour Initial course from an accredited training provider to become a certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead-safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation. Repair and Paintina. 4-7-4 - IFYOU'R[NOT LAD-SAf E (ERiIFlf R ISTURBING `JUST SIX SQUARE FEET COULDCOSTYOU BIG TIM Signature Date e1- Printed Name Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Undersigned ,o,.. ` L. ? ("d Printed Name - t Date Office Use Only: Project Address: Permit Number: 07/11/2011 16:41 FAX 9127868943 GREGORY A WILETS MD PC STATE OF GEORGIA ) HOLD HARMLESS / } INDEMNIFICATION COUNTY OF CHATHAM ) AGREEMENT THIS AGREEMENT is made the by day of g1002 .2()11 . (hereinafter referred to as "Owner") WITNESSETH Owner hereby agrees to protect. defend, indemnify and hold harmless the City of Tybee Island, Georgia, (a political subdivision of the State of Georgia), its Mayor and Council. officers, agents, and employees (hereinafter referred to as "City") from and against any and all liability, damages, claims. suits, liens, and judbnnents of whatever nature, including any claims for contribution and /or indemnification for injuries to any person or persons, or damage to the property or other rights of any person or persons, caused in any manner pertaining to the location of privately constructed or any other privately owned structures and plants, which protrudes into the right -a -way of any City street. The undersigned further recognizes and agrees that this license does not confer upon the undersigned any rights, title. estate. or interest in said licensed premises; nor does this license agreement confer upon the undersigned a license coupled with an interest or easement. This license merely gives the undersigned a revocable privilege, it being expressly understood and agreed that, regardless of any improvements or investments made, expense and harm incurred or encountered by the undersigned, this agreement shall be subject to revocation, cancellation or termination, this license shall he null and void. IN WITNESS THEREOF, Owner has hereunto set its hand and affixed its seal on the day and year first above written. Cis 11A.SS_,____ Witness eelitiAd, 61Prai32B REFERENCES: 1. DEED 800K 290L -348, 2. P.R.B. 16P -46 3. P.R.B. 28P -88 W Z Y 0 BROKEN C.M.F LOT 3 S 79'49'56" E LOT 11 VINYL PICKET FENCE S 79'55'00" E 100.00' S STATE OF GEORGIA CHATHAM COUNTY PLAT OF LOT 1 GARDEN WARD, FOR: GREGORY LOT 4 CHAIN LINK FENCE Co. ( O tD 75.00' >< x U Q PORCH 10.71' 10.74' 0 Ok z 0• NEW TWO STORY FRAME RESIDENCE ON CONCRETE BLOCK PIERS PORCH vaaaa =1111 Illr muundo lumundi C.M.F. 78.14' LAUREL ...- • A w 0 O A 43 — N 79'55'00" W AVENUE 60' R/W 34de. 1k. ors tec.k.. pi- pi k sld N 674P C.M.F. = CONCRETE MONUMENT FOUND R.B.F. = 1/2" REBAR FOUND M.A.G.F. = MAG NAIL FOUND 2 & THE WESTERN PORTION OF LOT 13, BLOCK 6, TYBEE ISLAND, KNOWN AS No. 1111 LAUREL AVENUE. A. & JULEE WILETS DATE OF SURVEY: DATE OF PLAT: IN MY OPINION THIS PLAT REPRESENTATION OF THE E.O.C. FIELD < ERROR /POINT ADJ. METHOD E.O.C. PLAT TOTAL STATION JUNE 3, 2008 JUNE 17, 2008 IS A CORRECT LAND PLATTED 1/ 61,712 GEODIMETER 610 SCALE: 1"= 20' 0' 20' 40' BERT BARRETT, JR. LAND SURVEYING, P.C. 145 RUNNER ROAD SAVANNAH. GA. 31410 (912) 897 -0661 (F.B. 013 -79 -2) 10 Storag 12' • 1635 Building, Aluminu 120 0' (SF) f O 1 18' 12' 14' 903 Wood Deck 335 17' 17' 9C e- tc-5, En 6 24 ' •100 Two Story 864 ,! 21 rport Flat Roof 432 1 losed P X907 ch Screened Wall X204 19' 15' r ■ 100 Two Story 480 ✓ Use-DR Slab w 'Valis under 20 16 2 11100 Two Story 768 NI 904 Slab Porch with Roof 384 11' 13' •903 Wood Deck 66 11' 6' 903 Wood Deck 212 12' 11' ORDINANCE NO. 16-2011 AN ORDINANCE TO AMEND THE CODE OF ORDINANCES PERTAINING TO SEC. 3 -165 aka FOR THE CITY OF TYBEE ISLAND, GEORGIA WHEREAS, the duly elected governing authority for the City of Tybee Island, Georgia, is authorized under Article 9, Section 2, Paragraph 3 of the Constitution of the State of Georgia to adopt reasonable ordinances to protect and improve the public health, safety, and welfare of the citizens of Tybee Island, Georgia, and WHEREAS, the duly elected governing authority for the City of Tybee Island, Georgia, is the Mayor and Council thereof, and WHEREAS, the governing authority desires to adopt ordinances under it police, zoning, and home rule powers, and WHEREAS, the City of Tybee Island so as to amend in particular Section 3 -165 pertaining to greenspace, and NOW, THEREFORE, be it ordained by the governing authority of the City of Tybee Island that Section 3 -165 of the Land Development Code of the City of Tybee shall be amended so as to hereafter provide as follows: Sec. 3 -165. Greenspace. In all zoning districts, 65 percent of the designated setback area of a lot shall remain in a vegetative state. This greenspace requirement shall require that at least 65 percent of the required set back area for a parcel remain in a vegetative state, and is not to be reduced by setback area averaging or variances granted so that the square footage required is calculated without regard to the averaging or a variance granted. It is the intention of the governing body, and it is hereby ordained, that the provisions of this ordinance shall become and be made a part of the Code of Ordinances, City of Tybee Island, Georgia, and the sections of this ordinance may be renumbered if necessary to accomplish such intention. y D l lci \ t o. cL: e (Y -q-1 This Ordinance shall become effective on day of , 2011. ADOPTED THIS DAY OF , 2011. MAYOR ATTEST: CLERK OF COUNCIL FIRST READING: 05.26.11 SECOND READING: °(I ENACTED: fJ EMH /TYBEE /ORDINANCES /2011/16 -2011 Sec. 3 -165 05.31.11 LOT 11 N 1C71705' E 1 1 I I 10.0' u1 1 L105 I I GR I I I ( GR L. 23' DLA_PINE I °LOT 12 $ WESTERN I PORTION OF LOT 13 0473 S.F. 1658' _Olm '7" :1 0 17.54' OPTIONAL TWO -STORY FRAME ON PIERS 19" DIA. LIVE OAK ONE -STORY SCREEN PORCH ON POSTS TWO -STORY FRAME ON PIERS 16' DA. LIVE OAK 0 6.86 DECK ON POSTS GR PT 9 O DECK ON 4 POSTS 23.0 PT 8 10.0• B.RL 25 245 PT 7 -I PT6 GR GR EAST PORTION OF LOT 13 $ WEST 1/2 OF LOT 114 '-1 PT 1 =3.5x15 PT2 =5x7 PT3 -PT6 = 5x10 PT7 = 3.5x51 PT8 -PT9 = 5x8 Dianne Otto From: Dianne Otto Sent: Thursday, June 30, 2011 4 :59 PM To: 'Downer Davis' Cc: Ethan Imhoff Subject: 1111 Laurel Ave. - proposed project Attachments: drainage 1111 Laurel Ave.pdf; greenspace ordinance.pdf; existing rear with dimensions.pdf; survey showing existing rear.pdf; proposed front & east side.pdf Downer, Attached are documents related to a proposed project at 1 1 1 1 Laurel Avenue / Wilets. The hous got a C.O. in June, 2008. Tony Petrea (658 -7239) is the contractor. v p cI Q,- 5 u r � e j + v0� s �„j be�4 cr dro.,,.) % s 4- rpta oSI The application is for the installation of decks and walkways in the front and side yards. The rear yard already has a storage building and other decks /walkways. I have concerns: 1. The construction will be wood and Tony said permeable spaces will appear between the boards 2 or 3 weeks after installation. stp ct S W : e QS nQ 15 reQtd: red c 2. Will this project cause the site to be in violation of the 65% greenspace requirement? (se s) "." attached ordinance) -1 s wire, A. aradr -Z- 3. Will this project disrupt the approved drainage? (see attached drainage plan) .n ecas-1-4 0.44.9x$7D cwNr W:II 6%4cic (perm Wed. I'm planning to meet with you tomorrow at 4 pm to discuss this. Thanks, Downer. Dianne K. Otto, CFM City of Tybee Island phone 912.786.4573 ext. 136 fax 912.786.9539 I scp o -I 80 � I Q9.40 6' 31'-1 ;-�- ,1 se--, -b area 1 3 (0.o ec `'Q7 Walk 5 2 .S 3S �eo ,,-773 /11V, 9 ,e4140 ,44igfr 34 "CSC- - loaALciP44- 54 �t u LEGACY LODGE & CONFERENCE CENTER LAKE LANIER ISLANDS RESORT. Qron-k-- 2..3x' .114 .D o t f o x r-15 = 'l 5D S ;c1e 13 x Qo. I4 -3o _ (001.40 3S►L e!b ►r) f cz. ; eno gg, (OM JI En's` (cS PAz v ic&11l, . M ' C1 11 o 7,2 7o.? 23 I+72.(U fa�:�S`,nQ 1�an'Qr22- n50�cQs. ( 70) n 5-e40;,,_cicS LS J (S 3Q 5Q _t 2oS Mixed Sources FSC76 6w.Ca -0030„ Cowin 996 forest Stewardship Council non -gr ate (tfl vn 542-+b0.i✓k 5 ( Z2 7 7000 Holiday Road • Lake Lanier Islands, GA 30518 • 770-945-8787 • www.lakelanierislands.com REFERENCES! 1. DEED BOOK 290L -348. 2. P.R.B. 16P -46 3. P.R.B. 28P -88 O co w W Z U BROKEN C.M.F LOT 3 S 79'49'56" E LOT 11 VINYL PICKET FENCE S 79'55'00" E 100.00' STATE OF GEORGIA CHATHAM COUNTY PLAT OF LOT 1 GARDEN WARD, FOR: GREGORY O 0' k I r Z w w Sri( '11 LOT 4 CHAIN 75.00' x McK.'8.F. 'N• { 0 100 10.71' 10.74' c O z PORCH ' w D NEW TWO STORY FRAME RESIDENCE ON CONCRETE BLOCK PIERS C.M.F. • PORCH 11111111 .a.. ��� pf .p"1' nu�rs�s�uiaauua�i�iia OHIC..1......9!! . �1..... 111 Mut 1.�.....•h... _.:...elee� 78.14' 12.09 LINK FENCE - 5 Qd p,^ teak E rr p{kt. { 1/4 6.41> LOT, 13 , x 1' (0 0 to lx�^3 R.B.F. O x-- N 79'55'00" W LAUREL AVENUE 60' R/W C.M.F. = CONCRETE MONUMENT FOUND R.B.F. = 1/2" REBAR FOUND M.A.G.F. = MAG NAIL FOUND 2 & THE WESTERN PORTION OF LOT 13, BLOCK 6, TYBEE ISLAND, KNOWN AS No. 1111 LAUREL AVENUE. A. & JULEE WILETS DATE OF SURVEY: JUNE 3, 2008 DATE OF PLAT: JUNE 17, 2008 IN MY OPINION THIS PLAT IS A CORRECT REPRESENTATION OF THE LAND PLATTED E.O.C. FIELD < ERROR /POINT ADJ. METHOD E.O.C. PLAT TOTAL STATION 1/ 61,712 GEODIMETER 610 SCALE: 1"= 20' 0' 20' 40' BERT BARRETT, JR. LAND SURVEYING, P.C. 145 RUNNER ROAD SAVANNAH, GA. 31410 (912) 897 -0661 (F.B. 013 -79 -2) 1 1 r0 -- LOT 11 I LOT 12 $ WESTERN • ' PORTION OF LOT 13 0,875 S.F. 23" DIA. PINE ▪ T_7 N 1O17O5' E 10.0' B.R.L t i L105 _ ir I i 1 GR GR L. 1754' 1658 19" DIA. LIVE OAK 0 ONE -STORY SCREEN PORCH ON POSTS TWO -STORY FRAME ON PIERS 16" D 4. LIVE OAK 0 10.0' B.R.L. 1 I 1 JJ1 "120, 1 6.80 DECK ON POSTS GR 18.0 O DECK ON • POSTS 23.0 PL GR GR II PT 7 PT 6 rD PT 5 PT HT 78.0 LAUREL. AVENUE 6C R'W GR GR EAST PORTION OF LOT 13 $ WEST 1/2 OF LOT 114 PT1= 3.5x15 5z,5 PT2 = 5x7 ` 3 5. PT3 -PT6 = 5x10 PT7= 3.5x51 t S PT8 -PT9 = 5x8 T LA C> 12' 1Q h 11635 ®' Stora9,4 Building, aluminum (SF) 120 ' 8' 1903 Wood Deck 335 12' 18' 6 1100 Two Story 864 ,121 54' Flat Roof 432 1 losed P 14' 17' 17' x45 -�N� �wA'1�S 19' 8� X907 ch Screened Wall X204 1 r 1100 \ ,i Two Story ,,,x'� 480.E UNDR Slab w Walls under 2 0 4' 15' -- - - - -- 24 1100 Two Store 768 111904 Slab Porch with Roof 384 1 1903 Wood Deck 212 11' 1903 Wood Deck 66 11' 13' 1 6' 12' 1 3' 11'