HomeMy Public PortalAbout11-0385 Wilets_1of2City of Z T.ee Island • Community Develop„ Jilt Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No.
1�- 0 325-- 3
Owner's Name 1 5
Gen. Contractor V�
Contact Information
Project Address
Scope of Work F
Inspector %0
I(S.
1
INTERNATIONAL
CODE COUNCIL'
MEMBER
Date Requested
Date Needed 09-2?—(1
Subcontractor
-�� ci 7z 39
a-12,o s I yS
Inspection P
Date of Inspection
Pass
inspection Pass Fail LJ Fee
Inspectio Pass Fail El Fee
Inspection Pass ❑ Fail ❑ Fee
Permit No.
City of Tee Island • Community Development Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Date Requested 7—/q-
MUM / q -
INTERNATIONAL
CODE COUNCIL'
MEMBER
G oner's Name V, 1 P 4",c Date Needed
Gen. Contractor 00,n U'. Pry. /S Subcontractor
Contact Information
r?
Project Address f f i/
7239
(9 l Ave, .
Scope of Work . . r '� S
Inspector Date of Inspection
Inspection -1; o a
Pass 137Fail Fee
Inspection Pass LJ Fail
Fee
Inspection Pass El Fail r"'1 Fee
Inspection Pass r — Fail 0 Fee
DATE ISSUED: 07 -11 -2011
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
CITY OF TYBEE ISLAND
BUILDING PERMIT
INSTALL PATIOS /WALKWAYS
1111 LAUREL AVE
GREGORY WILETS
1111 LAUREL AVE
TYBEE ISLAND GA 31328 -8748
CONSOLIDATED SERVICES
PO BOX 60593
SAVANNAH GA 31420
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 51.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION
$1,200.00
PERMIT #: 110385
• Deck boards to be
spaced the width
of the nails used
to place them.
• Hold Harmless
agreement in file.
• 65% of setbacks
to remain
greenspace.
TOTAL BALANCE DUE: $ 51.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
Location: 1/1 / � v 2
NAME
ADDRESS
I,
h ar tyd es-5
PIN# q- ooZco -o4- Q/Z
TELEPHONE
(Check all that apply)
❑ Repair [}Residential
❑ Renovation [angle Family
❑ Minor Addition ❑ Duplex
❑ Substantial Addition ❑ Multi- Family
Other cJ_ /S /oLe . l Commercial
n Footprint Changes
❑ Discovery
n Demolition
Details of Project: 54.94/ S / d .sue k S ,8-S
Estimated Cost of Construction: $ 1'ZOO. ° °
Construction Type C /) (Enter appropriate number)
(I) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY Of LOT and complete the
following information sed on the construction drawings and site plan:
# Units #Bedroom " # Bathrooms
Lot Area Livi g pace (total sq. ft.)
# Off - street parking spaces
Trees located & listed o¢. -site plan ,
Access:
Drivewa r (ft.) With culvert? -- With swale?
Set. - s: Front Rear Sides..( (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
&@c2_1v- dc./t.-CL.-
Ill / LRu2eL /que
g1Z-
Owner
LvI'lefs
'Ty 10J-2_ 7 fj.. -d 4,4 .
'78-8q V--?
Architect
or Engineer
`
ti /-
Building
L'o4.isol,olgfth
P -o. 00 coosg3
9/Z -ro58-
Contractor
612-"" /C-g-1 l e-e f'''2'"
5,4-v ,✓,a -y4, iD ar 314/i0-.
-7 2 3 S
(Check all that apply)
❑ Repair [}Residential
❑ Renovation [angle Family
❑ Minor Addition ❑ Duplex
❑ Substantial Addition ❑ Multi- Family
Other cJ_ /S /oLe . l Commercial
n Footprint Changes
❑ Discovery
n Demolition
Details of Project: 54.94/ S / d .sue k S ,8-S
Estimated Cost of Construction: $ 1'ZOO. ° °
Construction Type C /) (Enter appropriate number)
(I) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY Of LOT and complete the
following information sed on the construction drawings and site plan:
# Units #Bedroom " # Bathrooms
Lot Area Livi g pace (total sq. ft.)
# Off - street parking spaces
Trees located & listed o¢. -site plan ,
Access:
Drivewa r (ft.) With culvert? -- With swale?
Set. - s: Front Rear Sides..( (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through 0 ti 5/ T E /304-rr4
On -site waste and debris containers will be provided by C or
Construction debris will be disposed by Lo,-;- ite.rc or by means of -rrzvae
understand that 1 must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as- built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction. - -�
Date: - Z - 11 Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The,following is to he completed by (.'ity personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New Existing
Is it in compliance with City map?
If not, has street name and /or number been reported to M PC?
NFIP Flood Zone
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm /Drainage
Inspections
City Manager
Signature
•
Date
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
LEAD -BASED PAINT
Adapted from http:// www. epa .gov/lead /pubs/renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre- renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping_checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre - renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour Initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead-safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation. Repair and Paintina.
4-7-4 -
IFYOU'R[NOT
LAD-SAf E (ERiIFlf R
ISTURBING
`JUST SIX
SQUARE FEET
COULDCOSTYOU
BIG TIM
Signature Date
e1-
Printed Name
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned
,o,.. ` L. ? ("d
Printed Name
- t
Date
Office Use Only:
Project Address:
Permit Number:
07/11/2011 16:41 FAX 9127868943 GREGORY A WILETS MD PC
STATE OF GEORGIA ) HOLD HARMLESS /
} INDEMNIFICATION
COUNTY OF CHATHAM ) AGREEMENT
THIS AGREEMENT is made the
by
day of
g1002
.2()11 .
(hereinafter referred to as "Owner")
WITNESSETH
Owner hereby agrees to protect. defend, indemnify and hold harmless the City of Tybee
Island, Georgia, (a political subdivision of the State of Georgia), its Mayor and Council.
officers, agents, and employees (hereinafter referred to as "City") from and against any
and all liability, damages, claims. suits, liens, and judbnnents of whatever nature,
including any claims for contribution and /or indemnification for injuries to any person or
persons, or damage to the property or other rights of any person or persons, caused in any
manner pertaining to the location of privately constructed or any other privately owned
structures and plants, which protrudes into the right -a -way of any City street.
The undersigned further recognizes and agrees that this license does not confer upon the
undersigned any rights, title. estate. or interest in said licensed premises; nor does this
license agreement confer upon the undersigned a license coupled with an interest or
easement. This license merely gives the undersigned a revocable privilege, it being
expressly understood and agreed that, regardless of any improvements or investments
made, expense and harm incurred or encountered by the undersigned, this agreement
shall be subject to revocation, cancellation or termination, this license shall he null and
void.
IN WITNESS THEREOF, Owner has hereunto set its hand and affixed its seal on the day
and year first above written.
Cis 11A.SS_,____
Witness
eelitiAd, 61Prai32B
REFERENCES:
1. DEED 800K 290L -348,
2. P.R.B. 16P -46
3. P.R.B. 28P -88
W
Z
Y
0
BROKEN C.M.F
LOT 3
S 79'49'56" E
LOT 11
VINYL PICKET FENCE
S 79'55'00" E
100.00'
S
STATE OF GEORGIA
CHATHAM COUNTY
PLAT OF LOT 1
GARDEN WARD,
FOR: GREGORY
LOT 4
CHAIN LINK FENCE
Co.
( O
tD
75.00'
>< x
U
Q
PORCH
10.71'
10.74'
0
Ok
z
0•
NEW TWO STORY
FRAME RESIDENCE ON
CONCRETE BLOCK PIERS
PORCH
vaaaa =1111
Illr muundo
lumundi
C.M.F.
78.14'
LAUREL
...-
• A w
0
O
A 43
— N
79'55'00" W
AVENUE 60' R/W
34de. 1k.
ors tec.k..
pi- pi k
sld N
674P
C.M.F. = CONCRETE MONUMENT FOUND
R.B.F. = 1/2" REBAR FOUND
M.A.G.F. = MAG NAIL FOUND
2 & THE WESTERN PORTION OF LOT 13, BLOCK 6,
TYBEE ISLAND, KNOWN AS No. 1111 LAUREL AVENUE.
A. & JULEE WILETS
DATE OF SURVEY:
DATE OF PLAT:
IN MY OPINION THIS PLAT
REPRESENTATION OF THE
E.O.C. FIELD
< ERROR /POINT
ADJ. METHOD
E.O.C. PLAT
TOTAL STATION
JUNE 3, 2008
JUNE 17, 2008
IS A CORRECT
LAND PLATTED
1/ 61,712
GEODIMETER 610
SCALE: 1"= 20'
0' 20'
40'
BERT BARRETT, JR.
LAND SURVEYING, P.C.
145 RUNNER ROAD
SAVANNAH. GA. 31410
(912) 897 -0661
(F.B. 013 -79 -2)
10
Storag
12'
• 1635
Building, Aluminu
120
0'
(SF)
f O 1
18'
12'
14'
903
Wood Deck
335
17'
17'
9C e-
tc-5,
En
6
24 '
•100
Two Story
864 ,!
21
rport Flat Roof
432
1
losed P
X907
ch Screened Wall
X204
19'
15'
r ■ 100
Two Story
480 ✓ Use-DR
Slab w 'Valis under
20
16
2
11100
Two Story
768
NI 904
Slab Porch with Roof
384
11' 13'
•903
Wood Deck
66
11'
6'
903
Wood Deck
212
12'
11'
ORDINANCE NO. 16-2011
AN ORDINANCE TO AMEND THE CODE OF ORDINANCES
PERTAINING TO SEC. 3 -165
aka
FOR THE CITY OF TYBEE ISLAND, GEORGIA
WHEREAS, the duly elected governing authority for the City of Tybee Island, Georgia,
is authorized under Article 9, Section 2, Paragraph 3 of the Constitution of the State of Georgia
to adopt reasonable ordinances to protect and improve the public health, safety, and welfare of
the citizens of Tybee Island, Georgia, and
WHEREAS, the duly elected governing authority for the City of Tybee Island, Georgia,
is the Mayor and Council thereof, and
WHEREAS, the governing authority desires to adopt ordinances under it police, zoning,
and home rule powers, and
WHEREAS, the City of Tybee Island so as to amend in particular Section 3 -165
pertaining to greenspace, and
NOW, THEREFORE, be it ordained by the governing authority of the City of Tybee
Island that Section 3 -165 of the Land Development Code of the City of Tybee shall be amended
so as to hereafter provide as follows:
Sec. 3 -165. Greenspace.
In all zoning districts, 65 percent of the designated setback area of a lot shall remain in a
vegetative state. This greenspace requirement shall require that at least 65 percent of the required
set back area for a parcel remain in a vegetative state, and is not to be reduced by setback area
averaging or variances granted so that the square footage required is calculated without regard to
the averaging or a variance granted.
It is the intention of the governing body, and it is hereby ordained, that the provisions of
this ordinance shall become and be made a part of the Code of Ordinances, City of Tybee Island,
Georgia, and the sections of this ordinance may be renumbered if necessary to accomplish such
intention.
y D l lci \ t o. cL: e (Y -q-1
This Ordinance shall become effective on day of , 2011.
ADOPTED THIS DAY OF , 2011.
MAYOR
ATTEST:
CLERK OF COUNCIL
FIRST READING: 05.26.11
SECOND READING: °(I
ENACTED:
fJ
EMH /TYBEE /ORDINANCES /2011/16 -2011 Sec. 3 -165 05.31.11
LOT 11
N 1C71705' E
1
1
I I
10.0'
u1
1
L105
I I
GR
I I
I (
GR
L.
23' DLA_PINE
I °LOT 12 $ WESTERN
I PORTION OF LOT 13
0473 S.F. 1658'
_Olm
'7"
:1 0
17.54'
OPTIONAL
TWO -STORY
FRAME ON PIERS
19" DIA. LIVE OAK
ONE -STORY
SCREEN PORCH
ON POSTS
TWO -STORY
FRAME ON PIERS
16' DA. LIVE OAK
0
6.86
DECK ON
POSTS
GR
PT 9
O DECK ON
4 POSTS
23.0
PT 8
10.0•
B.RL
25
245
PT 7
-I PT6
GR
GR
EAST PORTION OF
LOT 13 $ WEST 1/2
OF LOT 114
'-1
PT 1 =3.5x15
PT2 =5x7
PT3 -PT6 = 5x10
PT7 = 3.5x51
PT8 -PT9 = 5x8
Dianne Otto
From: Dianne Otto
Sent: Thursday, June 30, 2011 4 :59 PM
To: 'Downer Davis'
Cc: Ethan Imhoff
Subject: 1111 Laurel Ave. - proposed project
Attachments: drainage 1111 Laurel Ave.pdf; greenspace ordinance.pdf; existing rear with dimensions.pdf;
survey showing existing rear.pdf; proposed front & east side.pdf
Downer,
Attached are documents related to a proposed project at 1 1 1 1 Laurel Avenue / Wilets. The hous
got a C.O. in June, 2008. Tony Petrea (658 -7239) is the contractor. v p cI Q,- 5 u r � e j + v0� s �„j
be�4 cr dro.,,.) % s 4- rpta oSI
The application is for the installation of decks and walkways in the front and side yards. The rear yard
already has a storage building and other decks /walkways.
I have concerns:
1. The construction will be wood and Tony said permeable spaces will appear between the
boards 2 or 3 weeks after installation. stp ct S W : e QS nQ 15 reQtd: red c
2. Will this project cause the site to be in violation of the 65% greenspace requirement? (se s) "."
attached ordinance) -1 s wire, A. aradr -Z-
3. Will this project disrupt the approved drainage? (see attached drainage plan)
.n ecas-1-4 0.44.9x$7D cwNr W:II 6%4cic (perm Wed.
I'm planning to meet with you tomorrow at 4 pm to discuss this.
Thanks, Downer.
Dianne K. Otto, CFM
City of Tybee Island
phone 912.786.4573 ext. 136
fax 912.786.9539
I scp o
-I 80
� I
Q9.40
6' 31'-1 ;-�- ,1 se--, -b area
1
3 (0.o ec `'Q7
Walk
5 2 .S
3S
�eo ,,-773 /11V, 9
,e4140 ,44igfr 34
"CSC- -
loaALciP44- 54
�t
u
LEGACY LODGE
& CONFERENCE CENTER
LAKE LANIER ISLANDS RESORT.
Qron-k-- 2..3x' .114
.D o t f o x r-15 = 'l 5D
S ;c1e 13 x Qo. I4 -3o _ (001.40
3S►L e!b
►r)
f cz. ; eno gg, (OM
JI
En's` (cS
PAz
v ic&11l, . M ' C1 11
o
7,2
7o.?
23
I+72.(U fa�:�S`,nQ 1�an'Qr22- n50�cQs.
( 70) n 5-e40;,,_cicS
LS
J
(S
3Q
5Q
_t
2oS
Mixed Sources
FSC76 6w.Ca -0030„
Cowin 996 forest Stewardship Council
non -gr ate
(tfl vn 542-+b0.i✓k 5
( Z2 7
7000 Holiday Road • Lake Lanier Islands, GA 30518 • 770-945-8787 • www.lakelanierislands.com
REFERENCES!
1. DEED BOOK 290L -348.
2. P.R.B. 16P -46
3. P.R.B. 28P -88
O
co
w
W
Z
U
BROKEN C.M.F
LOT 3
S 79'49'56" E
LOT 11
VINYL PICKET FENCE
S 79'55'00" E
100.00'
STATE OF GEORGIA
CHATHAM COUNTY
PLAT OF LOT 1
GARDEN WARD,
FOR: GREGORY
O
0'
k I
r
Z
w
w
Sri(
'11
LOT 4
CHAIN
75.00'
x
McK.'8.F.
'N• { 0
100
10.71'
10.74'
c
O
z
PORCH
' w
D
NEW TWO STORY
FRAME RESIDENCE ON
CONCRETE BLOCK PIERS
C.M.F.
•
PORCH
11111111
.a.. ��� pf .p"1'
nu�rs�s�uiaauua�i�iia
OHIC..1......9!! .
�1.....
111 Mut
1.�.....•h...
_.:...elee�
78.14'
12.09
LINK FENCE
- 5 Qd
p,^ teak
E rr p{kt.
{
1/4
6.41>
LOT, 13
, x
1'
(0
0
to
lx�^3
R.B.F.
O
x-- N 79'55'00" W
LAUREL AVENUE 60' R/W
C.M.F. = CONCRETE MONUMENT FOUND
R.B.F. = 1/2" REBAR FOUND
M.A.G.F. = MAG NAIL FOUND
2 & THE WESTERN PORTION OF LOT 13, BLOCK 6,
TYBEE ISLAND, KNOWN AS No. 1111 LAUREL AVENUE.
A. & JULEE WILETS
DATE OF SURVEY: JUNE 3, 2008
DATE OF PLAT: JUNE 17, 2008
IN MY OPINION THIS PLAT IS A CORRECT
REPRESENTATION OF THE LAND PLATTED
E.O.C. FIELD
< ERROR /POINT
ADJ. METHOD
E.O.C. PLAT
TOTAL STATION
1/ 61,712
GEODIMETER 610
SCALE: 1"= 20'
0' 20'
40'
BERT BARRETT, JR.
LAND SURVEYING, P.C.
145 RUNNER ROAD
SAVANNAH, GA. 31410
(912) 897 -0661
(F.B. 013 -79 -2)
1
1
r0 --
LOT 11 I LOT 12 $ WESTERN
• ' PORTION OF LOT 13
0,875 S.F.
23" DIA. PINE
▪ T_7
N 1O17O5' E
10.0'
B.R.L
t i
L105 _
ir
I i
1 GR
GR
L.
1754'
1658
19" DIA. LIVE OAK
0
ONE -STORY
SCREEN PORCH
ON POSTS
TWO -STORY
FRAME ON PIERS
16" D 4. LIVE OAK
0
10.0'
B.R.L.
1
I
1
JJ1
"120,
1
6.80
DECK ON
POSTS
GR
18.0
O DECK ON
• POSTS
23.0
PL
GR
GR
II
PT 7
PT 6
rD
PT 5
PT HT
78.0
LAUREL. AVENUE 6C R'W
GR
GR
EAST PORTION OF
LOT 13 $ WEST 1/2
OF LOT 114
PT1= 3.5x15 5z,5
PT2 = 5x7 ` 3 5.
PT3 -PT6 = 5x10
PT7= 3.5x51 t S
PT8 -PT9 = 5x8 T LA C>
12'
1Q h 11635 ®'
Stora9,4 Building, aluminum (SF)
120
' 8'
1903
Wood Deck
335
12'
18'
6
1100
Two Story
864
,121
54' Flat Roof
432
1
losed P
14'
17'
17'
x45 -�N�
�wA'1�S
19'
8�
X907
ch Screened Wall
X204
1
r 1100 \ ,i
Two Story ,,,x'�
480.E UNDR
Slab w Walls under
2 0
4'
15'
-- - - - -- 24
1100
Two Store
768
111904
Slab Porch with Roof
384
1
1903
Wood Deck
212
11'
1903
Wood Deck
66
11'
13'
1
6'
12'
1
3'
11'