Loading...
HomeMy Public PortalAbout11-0385 Wilets_2of2Da3 or Da4 RAISED BERM OR LANDSCAPE BED TO PREVENT STORM WATER FROM LEAVING SITE TOP BERM TO BE 7.75 100.00' Da3 or Da4 I.E. 4.80 S 79'55'00" F inixizevAr #4:4w7 el 4 �.� W000 DECK RETENTION BASIN TO BE P DEEP WITH A BOTTOM AREA OP BOO of AND 3:1 SIDESLOPES - BOTTOM AND SIDES TO BE SODDED TO PREVENT EROSION e 5' 75.00' 6' 25.00' BUILDING HEIGHT IS 33.5' ABOVE GRADE Da3 or Da4 RAISED BERM OR LANDSCAPE BED TO PREVENT STORM WATER FROM LEAVING SITE TOP BERM TO BE 7.71 Da2 Da3 or Da4 EAST PORTION OF LOT I3& WEST 112 OF LOT 114 GENERAL BUILDING INFORMATION NOTES. 1. NEW BUILDING IS TO 80 2,150 of (envelope] 2 PROPOSED BUILDING FINISHED FLOOR ELEVATIONS ARE TO BE SET AS PER FEMA FLOOD STUDY MAPS AND AS PER THE CITY OF TYBEE ISLAND, GEORGIA ORDINANCES 0 PROPOSED BUILDINGS ARE TO BE SUPPORTED ON PIERS OR FOUNDATION WHICH WILL SATISFY FEMA ELEVATION AND FEMA ZONE REQUIREMENTS. GENERAL DRAINAGE NOTES. I THE NEW BUILDING WILL RESULT IN A DECREASED RUN -OFF OF 0.18 cfe DUE TO IMPERVIOUS AREA DURING THE 25 YEAR STORM 2 THE SITE WILL NEED TO BE GRADED AS SHOWN AND AS DICTATED BY EXISTING CONDITIONS WHICH CAN NOT BE FORSEEN TO ALLOW FOR PROPER DRAINAGE. 3. THE PROPOSED BUILDING WILL HAVE THE NEED OF GUTTERS AND DOWNSPOUTS TO DIRECT RUN -OFF. 4. OUTFALL FOR THE PROJECT WILL BE DICTATED BY EXISTING CONDITIONS WITHIN THE CITY OF TYBEE EXISTING DRAINAGE SYSTEM AND EASEMENTS. NOTES. 1. CONTRACTOR IS TO COORDINATE ALL GAS, LIGHTING, ELECTRICAL, PHONE, CABLE AND ANY OTHER REQUIRED UTILITIES WITH THE APPROPRIATE UTILITY AGENCIES. 2, CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL EXISTING UTILITIES PRIOR TO COMMENCING OF CONSTRUCTION ACTIVITIES AND FOR AVOIDING CONFLICT WITH SAME. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR. 3. CONTRACTOR IS TO COORDINATE ALL DEMOLITION WORK WITH THE OWNER. ALL ITEMS NOT TO BE RELOCATED OR GIVEN TO THE OWNER WILL BECOME THE PROPERTY OF THE CONTRACTOR. 4. REMOVE ALL UNDERGROUND UTILITIES NOT TO BE UTILIZED. DO NOT ABANDON UTILITIES IN PLACE. 5. REMOVE ALL TREES AS NECESSARY FOR PROPOSED CONSTRUCTION. B. PREVENT DAMAGE TO EXISTING TREES WHERE POSSIBLE X TREES TO BE REMOVED EASEMENT NOTES: 1. THE OWNER, ENGINEER AND SURVEYOR ARE TO COORDINATE ALL EASEMENTS PRIOR TO FINAL PLAT APPROVAL AND RECORDING. 2. ALL DRAINAGE EASEMENTS TO BE PRIVATELY MAINTAINED. ELEVAIIENS SHONN ON PLANS SWALE DETAIL not to soda BOSWELL DESIGN SERVICES, INC. 8 S SITE PLAN SITE' PLAN to.- 10' SPECIAL CONSTRUCTION NOTE. IF THE CONTRACTOR KNOWS OR CAN RESONABLY Be EXPECTED TO HAVE KNOWN OF AN ERROR, DISCREPANCY OR CONFLICT IN THE PLANS, SPECIFICATIONS OR CONSTRUCTION STAKING AND FAILS TO REPORT THE PROBLEM PRIOR TO CONSTRUCTION, HE SHALL NOT BE ENTITLED TO COMPENSATION FOR ANY WORK OR EXPENSE INCURRED BY HIM FOR WORK REQUIRED TO BE RE- CONSTRUCTED BECAUSE OP SAID ERROR, DISCREPANCY OR CONFLICT, SCALE: I" = 12' DRAWING NUMBER C-2 2 OF 4 SHEETS