HomeMy Public PortalAbout11-0409 PattersonDATE ISSUED: 07 -22 -2011
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPLACE FLAT ROOF
1412 SECOND AVE
ELOISE C. PATTERSON
PO BOX 1071
TUCKER GA 30085 -1071
ACE ROOFING & REMODELING INC
5256 HWY 80 E
ELLABELL GA 31308
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 50.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION
$ 950.00
PERMIT #: 110409
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
2011 -07 -22 08:48
Location;
ACE ROOFING
9127283945 » 912 786 9539
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
/Loa NuE., Ttibe,e,
NAME
ADDRESS
PIN #
TELEPHONE
Owner
T(}(� �7 „,,,,
fk-u €-
tlQIi- o� Ci 3
`"";'�,1 ,
Architect
or Engineer
Contractor
C'e '
�t�./�C
�� /4a� �
�f5�
(Check all that apply)
❑ Repair
❑ Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
Details of Project:
• Residential
❑ Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
❑ Footprint Changes
❑ Discovery
[� Demolition
lace - C-ia_i-
Estimated Cost of Construction: $ q5-6 , GO
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
(Enter appropriate number)
(4) Masonry (6) Other (please specify)
(5) Steel & Masonry
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units
Lot Area
# Off-street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.)
# Bedrooms
Living space (total sq. ft.)
# Bathrooms
With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories _ Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
P 1/1
2011 -07 -22 08:50
ACE ROOFING 9127283945 »
912 786 9539 P 1/1
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by
Construction debris will be disposed by ACe2tOrf-rr0 by means of
I understand that I must comply with zoning, flood damage control building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 74311r
Note: A permit normally takes 7 to 10 days . to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New Existing
is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
NFIP Flood Zone
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL