Loading...
HomeMy Public PortalAboutStaff Report_Arsenal Project_2017_0424_FINALPage 1 of 12 TOWN OF WATERTOWN Department of Community Development and Planning STAFF REPORT This Staff Report is a technical analysis of the submitted application material and the required findings of the Watertown Zoning Ordinance. It is based only upon information submitted prior to the public hearing and may be revised or updated with new recommendations, findings and/or conditions as new information is obtained by Planning Staff during the public hearing process. Case #: PB-2017-01 Master Plan Site Plan Review Approval Subject Property: 485 & 615 Arsenal Street, Arsenal Yards Parcel ID: 1301 2 1; 1301 2 1A; 1302 2A 1; 1302 2D 2; 1301 2D 2A, 2B, 2C and 2D Zoning District: Regional Mixed Use District (RMUD) Owner/Petitioner(s): BP Arsenal Group LLC, 800 Boylston Street, Suite 1390, Boston, MA 02199 Zoning Relief Sought: §5.18, RMUD (Regional Mixed Use District) Zoning District – Final Site Plan Review for Phase 1 of Master Plan Permit PB- 2016-03 Special Permit Granting Authority: Planning Board Site Plan Review Meeting(s): March 28, 2017 Staff Recommendation: May 5, 2017 - Conditional Approval Planning Board Hearing: Scheduled May 10, 2017 485-615 Arsenal Street/Arsenal Yards May 5, 2017 PB-2017-01 Master Plan Site Plan Review – Phase 1 Staff Report Page 2 of 12 I. PUBLIC NOTICE (M.G.L. C. 40A, §11) 1. Procedural Summary Petition PB-2017-01 (Site Plan Review) is scheduled to be heard by the Planning Board (Board) on May 10, 2017. As required by M.G.L. c. 40A, sec.11 and the Watertown Zoning Ordinance, notice was given as follows: • Published in the Watertown Tab on April 21 and 28, 2017 • Posted at the Town Administration Building on April 14, 2017 • Mailed to Parties in Interest on April 25, 2017. 2. Legal Notice “485, 615-1, 617 Arsenal Street - BP Arsenal Group, LLC, 800 Boylston Street, Suite 1390, Boston, MA 02199, herein requests the Planning Board grant a Site Plan Review Approval in accordance with Watertown Zoning Ordinance §5.18(h)(5), Final Site Plan Review, so as to retrofit Buildings A (485 Arsenal) & E (615-1 Arsenal) to resemble their historic footprint and character and to install, grade and landscape the parking and roadway access around these buildings. RMUD (Regional Mixed-Use District) Zoning District PB-2017-01” II. DESCRIPTION A. Site Characteristics The subject property is an approximate 23-acre site fronting on Arsenal Street to the north and Arsenal Park and ‘Little’ Greenough Boulevard to the south/southwest. The existing site has approximately 260,000± Gross Leased Area (GLA) of retail, comprised of the enclosed mall buildings and the Old Navy as well as Golfsmith portion of the (Home Depot) building along Arsenal Street. The site has a main parking field facing Arsenal Street. The two Arsenal buildings are attached with a 1980s addition that encompassed the original smaller 1800s Magazine Building, which still has one external façade facing the front parking lot of the site. The western portion of the site, identified as 485 Arsenal Street, includes several original one to two-story Arsenal structures (the Arsenal Mall and two office buildings comprising Harvard Vanguard). The site does not include a portion of a condominium development (Home Depot and its parking field to the south), but includes the portion of that building that was Golfsmith. The Harvard Vanguard Medical Associates office buildings (53,000± GLA of medical office space) and its parking is not included in the redevelopment, although it is part of the overall site. The eastern portion of the site, identified as 617 Arsenal Street, is occupied by an existing two- story commercial building which includes a parking garage. The building includes 64,000± GLA of retail and office space, and also is not included in the requested Master Plan at this time, but is part of the overall site. An approximate 100-foot wide section of property located on the southern end of the site connects the western and eastern portions of the site and is included in the Master Plan. Under a separate permit, the Home Depot site was reviewed for adjusting the parking lot and ‘ring road’. 485-615 Arsenal Street/Arsenal Yards May 5, 2017 PB-2017-01 Master Plan Site Plan Review – Phase 1 Staff Report Page 3 of 12 B. Surrounding Land Use The Arsenal Street corridor has a mix of uses that include restaurant, retail/office, service, and industrial/R&D to the north. There are two residential complexes (Arsenal Condominiums and the Arsenal Apartments, a senior housing development) and the Arsenal Park to the west. The Commanders Mansion is located further to the west, and the Charles River Reservation and Greenway are located to the south and east of the site. C. Nature of the Request The Petitioner requests a Site Plan Review Approval for Phase 1 of the Master Plan Special Permit. The First Phase will rebuild the exterior facades of the two remaining buildings on the site and will also implement much of the stormwater measures for the site, as well as landscaping and hardscape around the buildings. The Phase also includes a partial road reconfiguration around the buildings and the adjacent Home Depot parking lot. This Phase does not include any new buildings proposed as part of the Master Plan. D. Permitting History This project is the first phase of the Arsenal Yards Master Plan Special Permit with Site Plan Review (PB-2016-03) approved January 11, 2017, for a mixed-use project that proposes a uses such as retail, restaurants, a bowling alley, and a theatre comprising approximately 374,000 square feet in total and up to 503 residential units within 7 buildings. The proposed project also includes the removal of buildings, portions of buildings, and the majority of the large parking fields, and replacing them with new buildings with a focus on an outdoor pedestrian experience. The project was proposed to be built in phases with review by the Planning Board of each Phase. The approved Master Plan had an extensive process with a number of meetings. Five separate community meetings were held from May through August of 2016 and three meetings (part of the Public Hearing) were held by the Planning Board (October 2016 through January 2017). The final approval included numerous amenities and mitigation measures such as: • Adding a passive park space between the new buildings proposed to the east and the existing main Arsenal building with direct access to Arsenal Park (the Petitioner has also offered to participate in and fund some improvements within Arsenal Park) • Provide onsite open/green space (over 3.2 acres) that is mostly open to the public and provides substantial stormwater improvements for the site. • Complete Streets measures that include traffic calming adjacent to Arsenal Street and support for improved safety near School Street and near Watertown Square. • A Transportation Demand Management Program that requires monitoring and remedies to limit offsite parking. • Pedestrian and Bicycle safety and connectivity – The site is improving north-south connections through the site and there is a central corridor designed to prioritize pedestrian and bicycles over vehicles and facilitate off-road access through the site and into Arsenal Park and beyond. • Limiting offsite light pollution and glare with a condition for lighting for each phase. • Offsite construction monitoring (ensuring that construction does not damage surrounding structures). 485-615 Arsenal Street/Arsenal Yards May 5, 2017 PB-2017-01 Master Plan Site Plan Review – Phase 1 Staff Report Page 4 of 12 • Existing and proposed buildings/structures are to the north and east of residential and public parklands, which limits any shadows created by taller structures. The approved offsite transportation mitigation includes a contribution of $2,059,000 for Items addressed in the mitigation package include but are not limited to traffic signal upgrades with new equipment, pavement striping, and widening, signal retiming, and mill/overlay work on Arsenal Street. Utility peer review confirmed that the sewer capacity is adequate and the Petitioner agrees to contribute $810,000 toward sewer line repairs, inspections, and town-wide study. The site meets its storm water requirements on-site. III. PUBLIC COMMENT An Informational/community meeting was held for the project on April 20, 2017. A summary of the Community Meeting is included in the record. At the time of this report, no other public comments were received on this phase. Comments at the community meeting focused on: • Questions about Master Plan approval and overall site development plans • Through access and park interface/design • Façade and how designs are reviewed • Parking and interim plans • Landscape and tree locations • Communication concerns (use of Facebook for community updates) IV. ANALYSIS AND FINDINGS A. Plan Consistency As identified in the approved Master Plan Decision, this project is in keeping with the 2015 Watertown Comprehensive Plan and the Regional Mixed Use District (RMUD) Zoning District. This Phase of the project does not implement the suggested Arsenal Park Connector, as identified in the 2014 Charles River Basin - Pedestrian and Bicycle Connectivity Study. A key suggestion identified creating a north-south connection between the Watertown-Cambridge Greenway across the Arsenal Mall Site and through Arsenal Park to the Charles River Greenway. The proposed two-way cycle track that connects the spur of the Watertown Greenway through the site to Arsenal Park achieves a safe connection to the Arsenal site and also provides the critical connection to the south and the Charles River. The approved Master Plan requires that the project finalize the connection up to the park prior to the relevant Phase. The approval also discussed contributions to improvements to the park. B. Master Plan Special Permit §5.18 (h) Projects of 2 acres or more in the Regional Mixed Use District (RMUD) with an approved Master Plan Special Permit must also obtain a Site Plan Review Approvals for each phase of development, subject to the review procedures under §9.03 Site Plan Review of the WZO, in which the ten criteria listed in §9.03(c) must be evaluated along with design review. 485-615 Arsenal Street/Arsenal Yards May 5, 2017 PB-2017-01 Master Plan Site Plan Review – Phase 1 Staff Report Page 5 of 12 This Phase includes: Building Proposed Use Square Footage Existing Building E 1/E 3 Retail/Restaurant 80,000 s.f. plus 7,000 s.f. of common area Existing Building A Retail/Restaurant 167,000 s.f. plus 12,000 s.f. of common area This first Phase of the proposal updates and redevelops the existing buildings (buildings A and E) on the site, and activates the newly created streetscape adjacent to these buildings, internal to the site. The project also will create the River Green, an enhanced access point and pedestrian connection through the site and into the adjacent Arsenal Park. This Phase is designed to be operational on its own prior to future phases being implemented and prepares the site for future phases. Therefore, the new and existing areas of the site have been designed to provide a seamless transition. Site Plan Review Criteria §9.03(c) A Developer’s Conference of the Site Plan Review Committee was held on 3/28/17. Present at the meeting were members of the Site Plan Review Committee (consisting of Town Staff and Committees) and the Petitioner, who presented the proposal, after which members of the Committee responded with questions, comments, and suggestions. Staff reviewed the ten criteria for Site Plan Review provided in §9.03(c) of the WZO and has incorporated Staff/Committee comments where appropriate: 1. Landscape: The landscape shall be preserved in its natural state, insofar as practicable, by minimizing tree and soil removal, and any grade changes shall be in keeping with the general appearance of neighboring developed areas. Adequate landscaping shall also be provided, including screening of adjacent residential uses, provision of street trees, landscape islands in the parking lot and a landscape buffer along the street frontage. Conditionally Met: This Phase’s landscaping is in-keeping with the approved Master Plan, providing more detailed landscape plans for around Building A and E to the proposed curb lines. The layout of the site and the interim measures for the transition to areas not altered as part of this Phase are appropriate. The site work includes the connections to the adjacent Home Depot parcel and implements the recommendations for that offsite area, as identified in the Master Plan. Details should be submitted for interim site management/temporary landscape for the exposed land areas on/around Building F and G as part of the Building Permit. Two larger areas of open space/landscape are proposed adjacent to the cinema (Cinema Plaza) and adjacent to Building A connecting to the park (The River Green). The Cinema Plaza is primarily hardscape (this is a destination area with potential for substantial foot traffic) with an adjacent landscape to provide a transition between the site and the Home Depot parking lot. This transition area provides a bank sloping down to the existing parking lot and a mix of foundation and over-story plantings to provide a visual break between the ring road and the parking field. 485-615 Arsenal Street/Arsenal Yards May 5, 2017 PB-2017-01 Master Plan Site Plan Review – Phase 1 Staff Report Page 6 of 12 The River Green to the east of Building A has varied levels and individual areas to allow for programed play/use. There are several trees proposed along the central access of this landscape. The design for this area has desirable features including the creation of various areas for congregation and programing. One feature that provides flexibility and allows for year- round use is the area of synthetic lawn. This area is pervious and provides open space, but does not provide vegetated landscape. One item not included in the project suggested by Planning Staff was to consider the inclusion of a water feature in the ‘river green’ area near the new entrance to Arsenal Park. A water feature such as a fountain provides activation and can be a desirable amenity for many users, and especially children and families. This type of feature may be designed to be more artistic in nature, or can have a more traditional look, but would require continued maintenance. 2. Relation of Buildings to Environment: Proposed development shall be integrated into the terrain and the use, scale and architecture of existing buildings in the vicinity and shall be in accordance with the Comprehensive Plan or other plans adopted by the Town guiding future development. The Planning Board may require a modification in massing so as to reduce the effect of shadows on abutting property in all districts or on public open space. Conditionally Met: The first Phase proposes to remove an awkward below grade vehicular connection between this site and the adjacent Home Depot site and demolish the 1980s sections of the mall. This opens up the site to create a more standard grid with primary and secondary roads with substantial pedestrian connectivity created where little now exists. The two larger existing buildings are being retained and much of the façades are proposed to be rebuilt with new windows included (to look similar to what the buildings looked like historically). The project also proposes to remove an original Arsenal building (Magazine Building), which was surrounded by the newer part of the development. There is initial interest in reusing the roof of the building within the Arsenal Park, but public meetings need to be held to determine the viability of this. A condition of this approval should include the consideration for removal of and reuse of the Magazine Building’s roof to allow for its relocation to Arsenal Park, if it is determined that a large covered space is a preferred option within the Park. The Master Plan Special Permit is conditioned to require the Petitioner submit, at the time of Site Plan Review for each Phase(s), materials showing how development in the Phase(s) conforms to the Arsenal Project Design Guidelines and the Town’s Design Guidelines within §9.03(d). The Petitioner has submitted Arsenal Yards Tenant Design Standards to address the design of the buildings and what can and cannot be altered as part of each façade. The manual provides detailed requirements for storefronts, types, new construction, and historic facades. The manual addresses the entire Master Plan implementation and suggests a submittal procedure. Staff suggests that the Petitioner develop a checklist and architectural review submittal template to be used for submittals to DCDP for sign-off prior to any tenant exterior façade designs being finalized for Building Permits to confirm plans are in-keeping with the Master Plan and Design requirements. 3.Open Space: All open space required by this Zoning Ordinance shall be so designed as to maximize its visibility for persons passing the site, encourage social interaction, maximize its utility, and facilitate its maintenance. 485-615 Arsenal Street/Arsenal Yards May 5, 2017 PB-2017-01 Master Plan Site Plan Review – Phase 1 Staff Report Page 7 of 12 Conditionally Met: Open space in the first Phase will include vegetated areas and public plazas for people to congregate with flexible s open areas for public gathering and entertainment. The Phase also includes open space within the parking lots with appropriate shade trees. This Phase also provides two access points to the adjacent parklands. The Board conditioned the Master Plan to require that the pedestrian/bicycle connection to Greenough Boulevard be designed to ensure that it creates a safe and appropriate connection, with review by DCDP staff, the Conservation Commission, and DCR. The DCDP and Conservation Commission have reviewed the proposed design submitted as part of this Phase and recommend it for approval as part of the Master Plan. Staff suggested looking at an option for access to the open space from the proposed landing on the ramps (including benches for resting) and suggested considering the flat area within this open space for a dog park. Initial staff review found that there would not be a concern with a dog park located on the stormwater area. The Petitioner shall submit documentation showing DCR sign-off for this connection prior to construction of the ramps. Additionally, there shall be DCDP staff review of a modification to the ramp and open space area adjacent to Greenough Boulevard to accommodate passive recreation such as benches and consider the accommodation for dogs somewhere on site. 4. Circulation: Special attention shall be given to traffic circulation, parking areas and access points to public streets and community facilities in order to maximize convenience and safety of vehicular, bicycle and pedestrian movement within the site and in relation to adjacent streets. Special consideration shall be given to infrastructure and design that will enhance public transit, such as bus shelters, on-site transportation demand management measures, and participation in a Transit Management Association. Conditional Approval: This project is in-keeping the approved Master Plan by implementing several of the proposed realignments to the internal road network using complete streets techniques. The Master Plan received approval with a number proposed improvements to the site circulation. This Phase implements key aspects of the final plan to allow safe access for all user types to the site and the existing buildings to remain. This initial Phase is primarily removing buildings and shifting the roadway to its final location on the site. This Phase does not propose any changes to the current access from Arsenal Street or through the site into Arsenal Park. This Phase proposes appropriate bicycle facilities and the racks meet the requirements of the WZO. The site’s total bicycle parking provisions will require final review during each phase with appropriate mix and number identified for long-term enclosed and short term (customer or visitor) parking, visible and near building entrances. This Phase provides appropriate universal design principals to allow an inclusive and accessible environment and shall be ADA/MAAB compliant. Car share parking will be identified and electric vehicle charging stations will be located in appropriate locations, with review by DCDP staff as part of phase development. 485-615 Arsenal Street/Arsenal Yards May 5, 2017 PB-2017-01 Master Plan Site Plan Review – Phase 1 Staff Report Page 8 of 12 Most transformers and switches are placed within landscape islands to blend with the landscape and provide as much screening as feasible. One switch box is proposed adjacent to the Arsenal Park entrance, replacing a larger shade tree in apparent decline. DCDP staff looked at the health of this tree and it has been pruned to remove deadwood at the tips of many branches. The loss of this tree at the gateway to the park is still a concern, so staff suggests that the switch be placed to minimize impacts to pedestrian and bicycle connection to the Park and into the Arsenal Yards site. The landscape (yew bushes and other shade trees near the park entrance) should be assessed and updated landscape plans should be included in the phase that includes the multi-use path into the park. Transportation mitigation is addressed as part of the Master Plan Approval and is not part of this Phase’s review. 5. Surface Water Drainage: Special attention shall be given to proper site surface drainage so that removal of surface waters will not adversely affect neighboring properties or the public storm drainage system. Proposed developments shall seek to retain storm water runoff on site to the maximum extent possible, incorporating best practices in storm water management and Low Impact Design techniques. In cases where storm water cannot be retained on site, storm water shall be removed from all roofs, canopies and paved areas and carried away in an underground drainage system. Conditionally Met: The Stormwater Management Plan was approved as part of the Master Plan. This Phase is in-keeping with the approved plans and, as required within the Master Plan Approval, all utility and grading plans shall have final review by DPW prior to approval of any building permit for any phase of the Master Plan. 6. Utility Service: Electric, telephone, cable TV and other such lines and equipment shall be underground. The proposed method of sanitary sewage disposal and solid waste disposal from all buildings shall be indicated. Conditionally Met: All utilities to the site, including electric, telephone, cable TV and other such lines are now and shall continue to be underground. All water mains, service lines and hydrants will be reviewed and approved by DPW prior to installation. Sewer mains installed in the access drives and connected in Arsenal Street have also been reviewed and will require final approval by DPW. Mitigation will be required to be provided on a proportional basis as the phases are approved. The Master Plan indicated that trash and recycling will be located at the southwest corner of Building A and the south side of Building E. The dumpster areas will be required to be screened, and managed privately. 7. Environmental Sustainability: Proposed developments shall seek to diminish the heat island effect; employ passive solar techniques and design to maximize southern exposures, building materials, and shading; utilize energy-efficient technology and renewable energy resources; and minimize water use. All Mixed Use Developments in the NB, LB, CB, I-1, I-2, I-3, and PSCD Districts must meet LEED Certifiable requirements as outlined by the United States Green Building Council’s Leadership in Energy and Environmental Design (current edition as applicable) as a minimum. Design documentation shall be provided by the Petitioner to the Town to verify that 485-615 Arsenal Street/Arsenal Yards May 5, 2017 PB-2017-01 Master Plan Site Plan Review – Phase 1 Staff Report Page 9 of 12 the project could achieve the minimum number of LEED points to achieve certification. Such documentation may include but not be limited to a project narrative describing how the project design intends to achieve selected LEED credits, and a LEED checklist with criteria (or points) which shows the project will achieve a minimum of 40 points. Conditional Met: This Phase’s initial LEED checklist indicates that Building A has a LEED score of 52 points and Building E1 has 51 points. As the Phase is permitted additional documentation will be submitted to show compliance with the requirement that the buildings within the site achieve LEED Silver Certifiability. 8. Screening: Screening, such as screen plantings, shall be provided for exposed storage areas, exposed machinery installations, service areas, truck loading areas, utility buildings and structures, and similar accessory areas and structures in order to prevent their being incongruous with the existing or contemplated environment and the surrounding properties. Conditionally Met: The Petitioner proposes to screen onsite utilities with a mix of evergreen and deciduous plantings as well as architectural screens and fences. As required in the Master Plan, the project shall be required to provide appropriate screening for all storage areas, exposed machinery, service areas, loading areas, utilities, and rooftop equipment. Further, appropriately screened HVAC plans shall be submitted and reviewed as part of the final Site Plan submittals for each building or phase. Transformers and switches will also require further review for placement, with a preferences for underground where feasible. 9. Safety: With respect to personal safety, all open and enclosed spaces shall be designed to facilitate building evacuation and maximize accessibility by fire, police, and other emergency personnel and equipment. Conditionally Met: The site is accessible by emergency vehicles from the three entrances along Arsenal Street and the access through the adjacent Home Depot lot. DPW and Public Safety staff have completed initial review of site circulation plans to ensure that all safety requirements have been met. Further review will be required for all intersections, and this review will include onsite and offsite aspects. This Phase of the project had the interim and final circulation plans reviewed and is satisfactory to the Town. 10. Design: Proposed developments shall seek to protect abutting properties from detrimental site characteristics resulting from the proposed use, including but not limited to air and water pollution, noise, odor, heat, flood, dust vibration, lights or visually offensive structures or site features. Conditionally Met: The approved Master Plan will protect abutting properties from detrimental site characteristics. The project includes an updated stormwater management system which will greatly reduce offsite stormwater and the water pollutants typically transported. Construction related impacts, such as dust and erosion, will be mitigated through the implementation of a Stormwater Pollution Prevention Plan, including sediment and erosion control, and construction management will be required. The submitted lighting has been reviewed for design and Zoning compliance. This Phase implements the first Phase of the Master Plan and updates the suite of fixtures that were 485-615 Arsenal Street/Arsenal Yards May 5, 2017 PB-2017-01 Master Plan Site Plan Review – Phase 1 Staff Report Page 10 of 12 conceptually proposed for the Master Plan. This Phase will set the groundwork for the exterior lighting design of future phases. Fixture heights: For wall-mounts, the Master Plan maximum mounting height is 20 feet. Pole mounts are also limited to 20 feet. Submitted diagrams indicates heights of 12, 14, 20 and feet. As part of the Building Permit submittal, the pole heights should be confirmed, and total fixture height expressed as (base + pole + head). Further, all lights must be fully shielded and down- directed as required within the WZO. DESIGN REVIEW The Town’s Design Consultant, Gamble Associates, participated in the required Developer’s Conference and provided comments on the proposed Phase. Since the initial review, the Petitioner has updated the plans to address some concerns raised by staff and the consultant. Three areas suggested to consider in the overall project’s review and approval by the Planning Board included: 1. Raised Tabletop – There was substantial agreement from the Committee that the road network should be more seamlessly tied into the ‘River Green’ by incorporating a raised intersection at the terminus of the open space. The Petitioner discussed options with their Engineer and updated the plans to include this suggestion. 2. Sustainability – Suggested incorporation of advanced energy saving solutions such as solar electric, solar hot water, and geothermal solutions or other options like district heating and cooling. 3. Architectural – Creates a strong sense of campus but should consider further simplifying of the architectural palette of the new buildings to define and enhance the public realm The submitted plans implement a phase of the Master Plan and the Tenant Design Standards provide clear guidance on façade improvements. V. Staff Recommendation: DCDP staff recommended that the request for Arsenal Yards Master Plan Phase 1 be granted with conditions based on the findings that this Phase is in accordance with Watertown Zoning Ordinance §5.18 (RMUD) to implement the first Phase in the redevelopment of approximately 23 acres for a mixed use proposal that includes a mix of Residential, Commercial, Retail and Restaurant Uses. See below for the Conditions Matrix. 485-615 Arsenal Street/Arsenal Yards May 5, 2017 PB-2017-01 Master Plan Site Plan Review – Phase 1 Staff Report Page 11 of 12 VI. CONDITIONS OF APPROVAL: # Condition Timeframe for Compliance To be Verified by 1. Control Documents: This approval is based upon the application materials and documents titled Arsenal Yards Watertown, MA, prepared by RJO’Connell & Associates, Inc. for Boylston Properties and The Wilder Companies dated 4/11/2017 as modified by these conditions: A. Cover Sheet B. Existing Condition of Land, Feldman, 5 sheets C. OS-1, Overall Site Plan D. N-1, General Notes E. C-1A and C-1B, Demolition Plans F. C-2A and C-2B, Grading and Drainage Plans G. C-3A and C-3B, Utility Plans H. C-4A and C-4B, Parking and Traffic Control Plan I. C-5, Erosion Control Details J. C-6, Drainage Details K. C-7, Utility Details L. C-8 and C-9, Site, Parking and Traffic Control Details M. L100, Overall Site Plan, Carol Johnson Associates, Inc. N. L200, Overall Materials Plan, Carol Johnson Associates, Inc. O. L201-L205 Materials Plans, Carol Johnson Associates, Inc. P. L300, Overall Planting Plan, Carol Johnson Associates, Inc. Q. L301-L304, Planting Plans, Carol Johnson Associates, Inc. R. L400, Plantings and Materials Schedule, Carol Johnson Associates, Inc. S. L401-L402, Details, Carol Johnson Associates, Inc. T. SL-1, Site Lighting Photometric Plan U. SL-2, Site Lighting Schedule, Details, and Photometric Plan V. A1.10-1.11 Building A 1st Floor Plan Part A & B, Perllwitz Cheliknski Associates W. A1.12-1.13, 2nd Floor Plans Part A & B, Perllwitz Cheliknski Associates, Inc. X. A1.14, Building A, Mezzanine Floor Plan, Perllwitz Cheliknski Associates, Inc. Y. A1.15-A1.16, Building A Roof Plan Part A& B, Perllwitz Cheliknski Associates, Inc. Z. A1.20-1.21, Build E 1 & 3 1st Floor Plans, Perllwitz Cheliknski Associates, Inc. AA. A1.22-1.23, Building E1 & E3 Roof Plans, Perllwitz Cheliknski Associates, Inc. BB. A2.10-2.11, Building A Elevations, Perllwitz Cheliknski Associates, Inc. CC. A2.20-2.30, Building E 1 & E3 Elevations, Perllwitz Cheliknski Associates, Inc. DD. A3.10, Potential Pallet of Materials, Perllwitz Cheliknski Associates, Inc. EE. A4.10-4.11, Perspective Views, Perllwitz Cheliknski Associates, Inc. FF. Arsenal Yards Tenant Design Standards, March 14, 2017 Perpetual ZEO/ ISD 2. Plan Modifications and Amendments: Changes to the approved project shall follow the procedure outlined in Section 5.18(h)(6) of the Watertown Zoning Ordinance. Perpetual ZEO/ DCDP 3. Recordation: Prior to issuance of the first Building Permit, the Petitioner shall provide a copy of this entire decision, showing that it has been filed and recorded with the Registry of Deeds. Building Permit (BP) ZEO 4. Codes/Regulation Compliance: The Petitioners shall comply with the requirements of the Master Plan Special Permit, and all other applicable local, State, and Federal requirements, ordinances, and statutes. Perpetual ZEO/ ISD 485-615 Arsenal Street/Arsenal Yards May 5, 2017 PB-2017-01 Master Plan Site Plan Review – Phase 1 Staff Report Page 12 of 12 # Condition Timeframe for Compliance To be Verified by 5. Prior Approvals: This approval shall be subject the Decision and Conditions of Master Plan Special Permit 2016-03 Perpetual ZEO 6. Interim Landscape: Details should be submitted for interim site management/temporary landscape for the exposed land areas on/around Building F and G as part of the Building Permit for this Phase. BP ZEO 7. Water Feature: Consider the inclusion of a water feature in the ‘river green’ area near the new entrance to Arsenal Park. . BP DCDP 8. Reuse of Magazine Roof: Consider the reuse of the Magazine Building’s roof to allow for its relocation to Arsenal Park, if it is determined that a large covered space is a preferred option within the Park. Prior to Demo Permit for Magazine ZEO 9. Design Checklist: Develop a checklist and architectural review submittal template to be used for submittals to DCDP for sign-off prior to any tenant exterior façade designs being finalized for Building Permits to confirm plans are in-keeping with the Master Plan and Design requirements. BP of Facades DCDP 10. Greenough Open Space: Submit documentation showing DCR sign-off for the Greenough pedestrian connection. Additionally, there shall be DCDP staff review of a modification to the ramp and open space area adjacent to Greenough Boulevard to accommodate passive recreation such as benches and consideration for the accommodation for dogs somewhere on site. BP for Ramps DCDP 11. Arsenal Park Entrance: The landscape (yew bushes and other shade trees near the park entrance) should be assessed and updated landscape plans should be part of the phase that includes the multi-use path into the park. Relevant Phase DCDP