HomeMy Public PortalAboutThomas & Hutton Lift Stn 6 W1 50 PARK OF COMMERCE WAY I POST OFFICE BOX 2727 SAVANNAH, GA 31402-2727 I 912 234 5300 WWW.THOMASANDHUTTON.COM September 3, 2013 Ms. Diane Schleicher City of Tybee Island 403 Butler Avenue Tybee Island, GA 31328 Re: Water System Improvements City of Tybee Island, Georgia Letter Agreement for Services Additional Services for Lift Station #6 Force Main Replacement Dear Ms. Schleicher: Pursuant to our discussion at the August 8th Infrastructure Committee meeting, you requested Thomas & Hutton perform the following scope changes, which were not included in our original contract: Design, permitting, bid and construction phase services for Lift Station #6 force main replacement. The project will consist of approximately 5,800 linear feet of 12-inch C-900 PVC force main and appurtenances, connecting to the existing force main in front of Lift Station #6 from Jones Avenue, along Solomon's Avenue, and Polk Street to the existing force main at the entrance to the wastewater treatment facility. A jack and bore cased crossing of US Hwy 80 and permitting through the Georgia Department of Transportation will be required. A directional drill of the section of Solomon Avenue where construction will be within the 25' marshland protection zone will also be included.The Engineer will utilize a previously completed topographic survey furnished by the City. The force main plans and specifications will be incorporated into the proposed water system improvement project currently under design and the project will be bid as a single project. In order to provide the additional scope of work specified, we request a modification of our contract. Our fee to perform the described scope is as follows: Fee or Time & Phase Fee Structure Expense Budget, General Consulting/ GEFA Application: = "r4F $ 5,000.00 Design: Lump Sum $ 12,000.00 Permit: Lump Sum $ 7,500.00 Bid: Lump Sum $ 2,500.00 Construction: Lump Sum $ 14,000.00 Post-Construction: Lump Sum $ 4,000.00 Additi I Services: Time & Expense-See Consulting Services Rate Sheet _Owner's Initials Consultant's Initials CHARLESTON, SC i MYRTLE BEACH, SC I WILMINGTON, NC I BRUNSWICK, GA Ms. Diane Schleicher City of Tybee Island Letter Agreement for Services September 3, 2013 Page Two If acceptable, please indicate your authorization to proceed with this additional work by signing and initialing where designated below and returning a copy to us for our files. This proposal will be open for acceptance until October 31, 2013, unless changed by us in writing. Please note that no work will be performed without prior written authorization to proceed. This extra work is subject to the terms and conditions of the contract executed for this project dated June 10, 2013 This proposal between the City of Tybee Island (Owner), and Thomas & Hutton Engineering Co. ("Consultant" or "Engineer"), consisting of the Consulting Services on a Time & Expense Basis Rate Sheet and Exhibit "A," represent the entire understanding between you and us with respect to the scope change. This agreement may only be modified in writing if signed by both of us. We appreciate this opportunity to be of service to you on this project. Should you have any questions or need further information, please do not hesitate to call on us. Very truly yours, THOMAS & HUTTON ENGINFEING CO. 4 By _ '/ James J. ollins, P.E. • Region erector By A. Christopher Stovall, P.E. Principal/Project Manager JJC,ACS/kts Enclosures: Exhibit "A" Additional Services of Consultant Consulting Services Rate Sheet ACCEPTED: e sue+ • 2013 U 11� ' E A ass c-�rd, TITLE Owner's Initials Consultant's Initials EXHIBIT"A"TO LETTER AGREEMENT FOR SERVICES BETWEEN THOMAS&HUTTON ENGINEERING CO.(CONSULTANT)AND THE CITY Of TYBEE ISLAND(OWNER) ADDITIONAL SERVICES LIFT STATION#6 SEPTEMBER 3,2013 EXHIBIT "A" ADDITIONAL SERVICES OF CONSULTANT If authorized by Owner in writing, Consultant shall furnish or obtain from other., Additional Services of the following types that are not considered normal or customary Basic Services. 1. Revising previously fully approved and accepted studies (by regulato agencies), reports, design documents or Contract Documents when such revisions are due to causes beyond Consultant's control. 2. Furnish the services of special consultant for other than the civil or structural engineering defined in the scope of services. Special services such as mechanical or electrical engineering, geotechnical exploration, underwater investigation, laboratory testing and inspections of samples, materials, and equipment. 3. Preparing to serve or serving as a consultant or witness for Owner in any litigation, public hearing or other legal or administrative proceeding involving the project. 4. Services after completion of the Construction Phase, such as inspections during any equipment, material, or construction guarantee period and reporting observed discrepancies under guarantees called for in any contract for the project. 5. If requested by Owner and agreed to in writing, a Resident Project Representative will be furnished and will act as directed by Consultant in order to assist in observing performance of the work of Contractor(s). Through more extensive on-site observations of the work in progress by the Resident Project Representative, Consultant shall endeavor to provide further protection for the Owner against defects and deficiencies in the work of Contractor(s). However, the furnishing of such representation will not make Consultant responsible for construction means, methods, techniques, sequences, procedures or for safety precautions or programs, or for Contractor(s), failure to perform their work in accordance with the Contract Documents. ° Owner's Initials Consultant's Initials air THOMAS H U T T Consulting Services �� Hme end E pence �,�7 0s 1 I,. o February 1,2013 cThomas&Hutton provides services on a time and expense basis as follows: E, u 1.This basis includes allowance for direct salary expenses and for direct non-salary expenses. It also provides for services we may subcontract to others. c y r; 2.Direct salary expenses are generally based upon our payroll costs. The payroll costs include the cost of salaries and wages(including sick leave,vacation,and holiday pay)for time directly PI chargeable to the project; plus unemployment, excise, payroll taxes, and contributions for social security, employment compensation insurance, retirement benefits, and medical and _�,' v' insurance benefits. m in The current hourly rate charges for each skill position for 2013 are as follows: Hourly Engineer Survey Landscape GIS Quality Control Business/ Rate 1 y [ Administrative $200.00 I Consultant I Consultant I Consultant ( Consultant I Consultant Senior Manager E $ 180.00 Senior Manager Senior Manager Senior M Survey Party(3 Men) g ( eor anager ( Senior Manager Senior Manager $ 175.00 Project Manager V Survey Manager V I ) Project Engineer V Project Surveyor V Landscape Architect V GIS Manager V Project Manager IV S M IV $ 150.00 Survey Landscape Architect IV GIS Manager IV Software/Computer Consultant IV Project Engineer IV Project Surveyor IV $ 140.00 Project Manager 111 Survey Manager III Landscape Architect III GIS Manager III Software/Computer Consultant III Project Engineer III Project Surveyor III P $120.00 Project Manager II Survey Manager II Landscape Architect II GIS Manager II Construction Administrator II Software/Computer Consultant II Project Engineer II Project Surveyor II $ 115.00 Project Manager I Survey Manager I Landscape Architect I GIS Manager I Construction Administrator I Software/Computer Consultant I Project Engineer I Project Surveyor I Designer IV Staff Surveyor IV $ 110.00 Engineering Technician IV Survey Field Supervisor Landscape Designer IV GIS Analyst IV Field Representative V Survey Party(2-Men) Designer III $ 100.00 Staff Surveyor III Landscape Designer III GIS Analyst III Field Representative IV Engineering Technician III $ 90 00 Designer II Staff Surveyor II Landscape Designer II GIS Analyst II Field Representative III Engineering Technician II $ 85.00 Designer I ( Survey Party(1-Man) Landscape Designer I GIS Analyst I Field Representative II Permit Coordinator II,Admin IV Engineering Technician i Staff Surveyor I $ 80.00 CADD Technician III I Survey Technician III Landscape Technician III GIS Technician III I Permit Coordinator I $ 75.00 CADD Technician II I Survey Technician II Landscape Technician II GIS Technician II I I I ' $ 70.00 CADD Technician I I Survey Technician I Landscape Technician I GIS Technician I Admin III $ 65.00 I I Field Representative I Admin II S 60.00 I I Admin i 1 $335.00 I Expert Witness I 3.When warranted,overtime will be charged for any non-salary employees. Overtime hours will be billed at 1-1/2 times the individuals charge rate. 4. Direct non-salary(reimbursable)expenses,including printing, reproduction,air travel,lodging,and meals are billed at cost. Travel in company or private vehicles will be billed at$0.615 per mile and may be revised based on fuel pricing. Outside consultant fees will be billed at 1.15 times the cost. 5.All rates and charges are effective through January 1,2013,including printing, reproductions,materials,and travel and are subject to change at that time. New rates and costs will become immediately effective to contracts in effect at the time of rate changes. 6. Boats with a length of 17 feet and greater shall be billed at a rate of$160 per day. Boats with a length less than 17 feet shall be billed at a rate of$90 per day. iAVANNAH. GA I CHARLESTON. Se { (v' YRTLE BEACH, SC I WILMINGTON. NC I BRUNSWICK. GA I WWW.THOMASANDHUITON.COM