Loading...
HomeMy Public PortalAboutPlumbing and Gas Fees (Updated 2018) TOWN OF BREWSTER PLUMBING & GAS FEES Effective July 1, 2018 1. All fees will be automatically doubled for permits not obtained within the prescribed time, pursuant to the applicable code. 2. A fee may be charged for each reinspection as a result of a requested inspection where the work is non- compliant, not ready, premises locked, not readily accessible or otherwise disapproved. Reinspection fees: $75 first, $125 second and subsequent inspections. 3. Permit fees and deposits are non-refundable. Residential Uses (1 & 2 Family, Multi-Family, Condominiums) (Each unit constitutes a separate permit) Base Permit (includes first fixture or appliance) $80.00 11 Fixtures $180.00 2 Fixtures $90.00 12 Fixtures $190.00 3 Fixtures $100.00 13 Fixtures $200.00 4 Fixtures $110.00 14 Fixtures $210.00 5 Fixtures $120.00 15 Fixtures $220.00 6 Fixtures $130.00 16 Fixtures $230.00 7 Fixtures $140.00 17 Fixtures $240.00 8 Fixtures $150.00 18 Fixtures $250.00 9 Fixtures $160.00 19 Fixtures $260.00 10 Fixtures $170.00 20 Fixtures $270.00 Each Additional Fixture or Appliance $10.00 Exceptions (Residential): Replacement water heater, dishwasher, LPG tank or other single appliance or fixture replacement $50.00 Replacement Gas Water Heater (covers Gas & Plumbing Permits) $100.00 Commercial (Other than Residential Uses Noted Above) (Each unit constitutes a separate unit if fire separated) Base Permit (includes first fixture or appliance) $80.00 6 Fixtures $155.00 2 Fixtures $95.00 7 Fixtures $170.00 3 Fixtures $110.00 8 Fixtures $185.00 4 Fixtures $125.00 9 Fixtures $200.00 5 Fixtures $140.00 10 Fixtures $215.00 Each additional Fixture or Appliance $15.00 *Plumbing and Gas permit fees for unusual or special conditions not itemized herein will be determined by the Building Commissioner.