Loading...
HomeMy Public PortalAbout100_032_Addendum 02 for RFQP 2013-643 K f .11 r ,41 IIaH'loHf}'s ADDENDUM #2 TO RFQ/P # 2013-643 - DEMOLITION OF MULTIPLE BUILDINGS This addendum hereby modifies RFQ/P # 2013-643 — DEMOLITION OF MULTIPLE BUILDINGS as issued by the City of Tybee Island. All information included in this addendum shall be incorporated into the RFQ/P. Proposers shall acknowledge receipt of this addendum on the Quotation Sheet submitted with their Proposal. 1. Pre-Proposal Conference: a. A Pre-Proposal Conference and walk-though was held at the Project Site on Thursday, October 10, 2013 at 1:00 PM. The RFQ/P and Addendum #1 were reviewed in detail. The attendees were advised to strictly follow the submittal procedures and submittal format described in the RFQ/P. The attendees were then granted access to the facilities that are to be demolished under this contract. b. A copy of the sign-in sheet is attached. 2. Contract Time: a. The RFQ/P indicates the Contract Time as 30 (thirty) calendar days. However, the City recognizes that the federal and state regulatory reporting requirements associated with the removal of hazardous materials at the Ceramics Building may limit the contractor's ability to complete the work within this timeframe. Therefore, additional time shall be allowed for the demolition of the Ceramics Building only. All other work shall still be performed within the 30 (thirty) calendar day time limit indicated in the RFQ/P. b. The Proposer may provide an extended timeline for the demolition of the Ceramics Building in the "Section 5. Capability to Perform" portion of the proposal. This section should also describe the regulatory hardships that are affecting the schedule and demonstrate that the timeline has been minimized to the greatest extent possible. 3. Extents of Below Slab Demolition: a. As indicated on the Drawings attached to the RFQ/P, building demolition shall include the complete removal of floor slabs, foundations and footing, and below slab utilities. The Contractor shall be reasonably responsible for the removal of these features for a depth of 4 (four) feet below the floor slab. Abnormal foundations, utilities, and building features discovered below this depth shall be considered "unforeseen conditions". The Contractor shall immediately notify the City and the Architect upon the discovery of such conditions. END OF ADDENDUM JOB JOB NO. G R E E N SCALE A P C H I T E C T U R F CALCULATED BY DATE SHEET NO. OF dale, 5 5-;Ars ill eri / t v,7 gf sa,rrr�f — 17 5 1 b c,4 1 L= .q/Z -255 -372,c r l riP`em- �riOle,�} �:nkrr, 912-655-NO J-)vn 146d gcol earn t2c.oUc-t 1rt (4,LIJ‘E_ n-et-cl 1 `741 J10 5v4c4 1'•v Qr�4 .C�tw he-IL ! Ha*"&- fit° -cwt — c,-r� SPEC. lLcO. � k7■ . OF C-�Ut5L\C Wort-v-s C-Vri 9 - ritSE1= \SLOK1�� roL►GE 4Ar''rA.1J — GI o -C'vsec