HomeMy Public PortalAbout100_092_fees_07142011 'c COMMUNITY DEVELOPMENT DEPARTMENT P.O. Box 2749 • 403 Butler Ave. • Tybee Island, GA 31328
4 1 Phone (912) 786-4573 • Fax (912) 786-9539
'" FEES
Accessory Structure $100 Sign-Banner $15
• with electrical: additional$40+$5 per$1000* • with electrical: additional$40+$10 per$1000*
• with plumbing: additional$40+$5 per$1000* Sign -Permanent $75 + $10 per$1000*
Administrative Approval of Minor Subdivision $125 • with electrical: additional$40+$10 per$1000*
Clearing&Grading $75 Sign-Temporary $50
Cell Tower $2,000 • with electrical: additional$40+$10 per$1000*
Demolition $250 Site Plan—Residential; Minor Commercial(to amend a Site Plan that was
Discovery/Tearout (fee applied to construction permit) $50 approved within the prior 3 years) $250
Dock/Crossover-Commercial $250+$8 per$1000* Sprinkler,Fire Suppression $100+$1 per sprinkler head
Dock/Crossover-Residential $100+$5 per$1000* Street Cut $75 +$500(2-year refundable LOC or bond)
Driveway,Patio $50+$5 per$1000* or 110%of the value of the work,whichever is greater
Electrical $50+$5 per$1000* Swimming Pool -Commercial $250+$8 per$1000*
Fence $50+$5 per$1000* Swimming Pool -Residential $100+ $5 per$1000*
Infrastructure $250+$8 per$1000* Temporary Structure $100
Land Disturbance $150 • when plan review required: additional$250 (not applied to permit fee)
Map Amendment, Text Amendment, Site Plan—Major Commercial, Tree Removal-Dead Tree $15
Special Review, Subdivision,Zoning Variance -Commercial $500 Tree Removal $50+$50/inch if required to mitigate
Mechanical $50+$5 per$1000* Well-Deep $100
Plumbing $50+$5 per$1000* Well- Shallow $50
Reinspection (each additional after two failures) $50 Work Without a Permit $250+double all fees
Relocation of Structure $250 Zoning Variance-Residential $200
Returned Check $32 All of the above include two inspections per phase *Starting after first$1000
• _ •
Water Tap/Meter# Construction
Capital Cost Recovery $2,000.00 Plan Deposit(applies to all plan reviews) $250 Inspection($15 minimum) $3 per$1000
per water meter fee applied to permit;forfeited if abandoned Reinspection $50
3/4" $670.00 Building Permit-Commercial
1" $938.40 $499 or less $50 Aid to Construction-Commercial --- see Sec. 70-33
1-1/2" $1,693.00 Construction$500 -$1000 $75
2" $2,007.60 Construction$1001 or higher Aid to Construction-Residential
Above 2" determined by City Mgr. $100 for first$1000+$8 per$1000+inspection fee New $1 per sq. ft.
Sewer Stub# Building Addition 500 per sq. ft.
Building Permit-Residential
4" $550.00 $499 or less—work by owner $0 Engineering Services varies by project
6" $818.40 $499 or less—work by contractor $50
8" $1,573.00 Construction$500 -$1000 $50
#Installation of line and meter shall be Construction$1001 or higher
the responsibility of the applicant $50 for first$1000+ $5 per$1000+inspection fee
• New construction value= $100 per heated sq.ft. fees effective 07/14/2011