Loading...
HomeMy Public PortalAbout100_092_fees_07142011 'c COMMUNITY DEVELOPMENT DEPARTMENT P.O. Box 2749 • 403 Butler Ave. • Tybee Island, GA 31328 4 1 Phone (912) 786-4573 • Fax (912) 786-9539 '" FEES Accessory Structure $100 Sign-Banner $15 • with electrical: additional$40+$5 per$1000* • with electrical: additional$40+$10 per$1000* • with plumbing: additional$40+$5 per$1000* Sign -Permanent $75 + $10 per$1000* Administrative Approval of Minor Subdivision $125 • with electrical: additional$40+$10 per$1000* Clearing&Grading $75 Sign-Temporary $50 Cell Tower $2,000 • with electrical: additional$40+$10 per$1000* Demolition $250 Site Plan—Residential; Minor Commercial(to amend a Site Plan that was Discovery/Tearout (fee applied to construction permit) $50 approved within the prior 3 years) $250 Dock/Crossover-Commercial $250+$8 per$1000* Sprinkler,Fire Suppression $100+$1 per sprinkler head Dock/Crossover-Residential $100+$5 per$1000* Street Cut $75 +$500(2-year refundable LOC or bond) Driveway,Patio $50+$5 per$1000* or 110%of the value of the work,whichever is greater Electrical $50+$5 per$1000* Swimming Pool -Commercial $250+$8 per$1000* Fence $50+$5 per$1000* Swimming Pool -Residential $100+ $5 per$1000* Infrastructure $250+$8 per$1000* Temporary Structure $100 Land Disturbance $150 • when plan review required: additional$250 (not applied to permit fee) Map Amendment, Text Amendment, Site Plan—Major Commercial, Tree Removal-Dead Tree $15 Special Review, Subdivision,Zoning Variance -Commercial $500 Tree Removal $50+$50/inch if required to mitigate Mechanical $50+$5 per$1000* Well-Deep $100 Plumbing $50+$5 per$1000* Well- Shallow $50 Reinspection (each additional after two failures) $50 Work Without a Permit $250+double all fees Relocation of Structure $250 Zoning Variance-Residential $200 Returned Check $32 All of the above include two inspections per phase *Starting after first$1000 • _ • Water Tap/Meter# Construction Capital Cost Recovery $2,000.00 Plan Deposit(applies to all plan reviews) $250 Inspection($15 minimum) $3 per$1000 per water meter fee applied to permit;forfeited if abandoned Reinspection $50 3/4" $670.00 Building Permit-Commercial 1" $938.40 $499 or less $50 Aid to Construction-Commercial --- see Sec. 70-33 1-1/2" $1,693.00 Construction$500 -$1000 $75 2" $2,007.60 Construction$1001 or higher Aid to Construction-Residential Above 2" determined by City Mgr. $100 for first$1000+$8 per$1000+inspection fee New $1 per sq. ft. Sewer Stub# Building Addition 500 per sq. ft. Building Permit-Residential 4" $550.00 $499 or less—work by owner $0 Engineering Services varies by project 6" $818.40 $499 or less—work by contractor $50 8" $1,573.00 Construction$500 -$1000 $50 #Installation of line and meter shall be Construction$1001 or higher the responsibility of the applicant $50 for first$1000+ $5 per$1000+inspection fee • New construction value= $100 per heated sq.ft. fees effective 07/14/2011