HomeMy Public PortalAboutSANCTUARY PL_8.pdfDATE ISSUED: 10 -31 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
CITY OF TYBEE ISLAND
BUILDING PERMIT
24 X 18 RIPRAP BARRIER
8 SANCTUARY PL
GREGORY /ALLISON TAYLOR
2370 LANSBURGH COURT
AURORA IL 60502
GRIFFIN LANDSCAPE DESIGN & CON
809 EAST VICTORY DRIVE
SAVANNAH GA 31405
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 112.50
PROPERTY IDENTIFICATION #
PROJECT VALUATION $ 385.00
PERMIT #: 130542
TOTAL BALANCE DUE: $ 87.50
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
azi,
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
:I I Y VI- I YLitt ISLAND
403 Butler Ave
PO Box 2749
Tybee Island, GA 31328 -2749
Ph (912) 786 -4573 FAX (912) 786 -5832
Vendor # :
Issued to:
01- 002055
DAVIS ENGINEERING, INC
P 0 BOX 1663
TYBEE ISLAND, GA 31328
F.O.B. Point - Tybee Island, GA
PU ^.CHASE ORDER
PO Number: 14_24690
This number must appear on a re ated
correspondence, shipping papers and invoices.
10/31/ 2013`equisition #: 14 -2469
Date:
Ship to:
CITY HALL
403 BUTLER AVENUE
TYBEE ISLAND, GA 31328
Terms - Net 30 days
UNE UNITS
DESCRIPTION
PRICE AMOUNT
1
0.00 Eng - 8 Sanctuary Place 100- 7220 -52 -1203
Davis Engineering, Inc invoice #21305201 dated
10/31/2013 for engineering at 8 Sanctuary Place
Taylor
Purchase Order void after 90 days.
Special Instructions:
I agree to provide the items /services listed on this
purchase order and accept the Purchase Order
Terms and Conditions that accompany this form.
Supplier Acknowledgement Date
0. 00
TOTAL
87.50
87.50
Authorized by
For the City of Tybee Island
Date
DAVIS ENGINEERING, INC.
PO Box 1663 Tybee Island, Georgia 31328
Tel. (912) 695 -7262 dkdbus @gmail.comt
October 31, 2013
Diane Otto
City of Tybee Island
P.O. Box 2749
Tybee Island, GA 31328
Invoice # 21305201
Phone (912) 786 -4573 Fax: (912) 786 -9539
RE: The Sanctuary Rip -Rap Bulkhead on SE side of Causeway
10 -28 -13
0.50 Review and concurrence
0.50 hours @ $175 /hour = $87.50 Total Due This Invoice
13 -c542
/4- .246.'90
10 -3a�13
ablQ.
S2.-12o3
CITY OF TYBEE ISLAND
BUILDING PERMIT
ON -SITE SUPERVISOR TO SPEAK WITH CITY'S ENGINEER
(DOWNER DAVIS / 695 -7262) PRIOR TO BEGINNING WORK.
ENGINEERING FEES TO BE INVOICED AT CLOSE OUT.
DATE ISSUED: 08 -28 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
24 X 18 RIPRAP BARRIER
8 SANCTUARY PL
GREGORY /ALLISON TAYLOR
PO BOX 2559
TYBEE ISLAND GA 31328
GRIFFIN LANDSCAPE DESIGN & CON
809 EAST VICTORY DRIVE
SAVANNAH GA 31405
P
$ 25.00
PIN #4- 0022 -01 -370
$ 385.00
PERMIT #: 130542
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Dianne Otto
From: Downer Davis [dkdbus @gmail.com]
Sent: Wednesday, August 28, 2013 10:47 AM
To: Dianne Otto
Cc: Deb Barreiro
Subject: Re: Greg Taylor - rip rap at 8 Sancturary Pl.
While I understand it and I found Greg to communicate quite well. However, as we have found communication to to
be the source of much of our violations, we should minimize the probability of error on this project. I recommend that
I at least have a phone conversation with the ON SITE SUPERVISOR for this work and be advised of when it will
occur.
I have one hour involved and don't expect more than another hour of involvement. I'd prefer to bill at the end.
Downer
On Tue, Aug 27, 2013 at 5:53 PM, Dianne Otto <Dotto@cityoftybee.org> wrote:
Downer — Greg Taylor's plan for the rip rap to replace the sediment barrier at 8 Sanctuary Place is shown on the top of
the attached plan. Does this match your understanding of the project? Do you want to invoice now or at closeout or
both?
Deb — Please verify you re- verified the JD line as shown on the attached survey. You may not submit an invoice for
your time on this project. - 7) c 1,0 cat( td, 1 o- -2..g" - )3 a. M • 4" Ver. t , e SLR, had
k....)' r--; 4-2n 0,. � 5Jrve:A •
Dianne K. Otto, CFM
City of Tybee Island
Planning & Zoning Manager
phone 912.472.5031
fax 912.786.9539
..*..** .......................33.......3..33.......3.33.....3. ......................3......3. .....33.............33.........
This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you are not the named
addressee you should not disseminate, distribute or copy this e-mail. Please notify the sender immediately by e-mail if you have received this e-mail by mistake and delete
this e-mail from your system. Please note that any views or opinions presented in this email are solely those of the author and do not necessarily represent those of The City
of Tybee Island. The recipient should check this email and any attachments for the presence of viruses. The City of Tybee Island accepts no liability for any damage caused
by any virus transmitted by this email. City of Tybee Island P.O. Box 2749 Tybee Island, GA 31328
,,,,,,,,,,,,,,,,,,,,,,,,,<.... ,..,,«.,,,,,3...3.33..3.333.... ..................3...3..33...3 3..3........3..........3...333.
1
/3 -D51 L
Property Address:
City of Tybee Island, Georgia
912 - 472 -5030 • Fax 912- 786 -9539
APPLICATION FOR BUILDING PERMIT
PIN: 1-7 00 ,29 — Dl - 370
ay.v:15---co re.
Single Family
❑ Duplex
❑ Multi- Family units
❑ * Commercial unit(s)
Check all that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: ` S ■ k � \10y ic� ` i1",)\
\
Estimated Cost of Construction: $ 3 &S (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: a®ak) Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Man: gement. I accept responsibility for any corrective actions
that may be necessary to restore drains -impaired b this p- r �"tted construction. in $ A-a.11 r; p cap a� w. ctrS�
i �
Date: 6 1' \V2j Signature: �y11� �11k■
Printed Name of Applicant: r • _ WWICAIN
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Date
FEES
Permit 2 .S
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Name
gailing Address
Telephone
Owner
—�
C c �0
?D 3ti)< 55 G(
Home: "II a- �ii,, -yats
Cell:(,,-3o `31q-3705
Office:
Cell:
Architect or
Engineer
Contractor
3 ; \\ �1'sv.,i
(cl. U`�c---(':)y
Office:
Cell 91 h ^cM∎. - LT-11-i
ay.v:15---co re.
Single Family
❑ Duplex
❑ Multi- Family units
❑ * Commercial unit(s)
Check all that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: ` S ■ k � \10y ic� ` i1",)\
\
Estimated Cost of Construction: $ 3 &S (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: a®ak) Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Man: gement. I accept responsibility for any corrective actions
that may be necessary to restore drains -impaired b this p- r �"tted construction. in $ A-a.11 r; p cap a� w. ctrS�
i �
Date: 6 1' \V2j Signature: �y11� �11k■
Printed Name of Applicant: r • _ WWICAIN
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Date
FEES
Permit 2 .S
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * * * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http:// www. gaswcc .org /docs /field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called f they will be installed with a separation that allows for the first one to fail (fall
ove) without impacting the s and one. The complete assembly and installation must be compliant; steel or
wo posts, post spicing, T or A.
Sign ture for eip
Printed Name_}
ead Pam, Asbestos, and BMP notices Date
t-i_\ 4\.()z L\N. Zt-ug(L‘vkci
Louis S. Off
Pin# 4- 0022 -01 -042
Ping' 4- 0022 -01 -371
Joseph Counihan
of
N25'09'11 "W
90'Access, Utility
& Walking Esmt.
Water
Valve
LEGENO:
N64'50 04'E
1
Water'
Valve
Coastal Island Dev. Co.
Pin# 4- 0022 -01 -041
�y.. 101.75'
ONR ✓ar/sdicl %no/ Line
.4s Flogged By Go. ONR
,-Seplsmbar 2071
IPF
10' BSL
2: -
L4 L3
`25' Marsh
Buffer
Limestone Drive
1 .9
N
Brick
Drive
Water
Meters
Pump N
1 Station
ITEasep?enl
- -� Coble
Pedestal
6' Wood
Fence
564'53'51 "W'
4.98'
Al NON ROO 1VVN0
IPF IRON PIPE FOUND
.°b # 4- 0022 -01 -370
ACCAYOMC 7I2 INC 12000 WM/RANCE
RITE /NP IXISICOI1JP ABED .SEPT. 24 1004
)W4' SURVEYED PROMPT IS 1NMAN A
SPECIAL 12000 AWARD AREA zaw h2" . Z. 110
ro
17.1'
12.9'
Three- a
Story
N Stucco
10.2 Residence
4/C
40.2'
13
^o
h
10' BSL
Pod
17
rd 12.7'
1^
96.55' $65'15 Q3"W
1 Telephone
I , Pedestal
-3
J 10'
Lot
Lot 9° b W
i
4. 564'45'43"W 554•41 '45"W
129.07' 13.74'
Sanctuary Place
10
WETLANDS LINE TABLE
LINE LENGTH BEARING
L1 26,84 N64 '58'04'E
L2 4.59 S25.01'11'E
L3 3,10 N67'54'33'E
L4
11.00 N67.54.33'E
L5
13,31 N81'33'43'E
Pin# 4- 0022 -01 -371
Coastal island Dev. Co.
/4:"
Plat Of Lot 11, The Sanctuary, Phase 1,
Bay Ward, 5th. G.M. District,
Tybee Islan4 Chatham County, Georgia
Also Known As: # 8 Sanctuary Place
For Greg Taylor
SCALE: 1 ” = 20
Vincent Helmly
317 DERRICK /NN RO40
SAVANNAH, GEORGIA
(912) 915 -3523
Date: 09/26/11
Scale 0 " =20'
Job No. 11-110