HomeMy Public PortalAboutNAYLOR AV_20.pdfCity of 'i , Island • Community Development ..
Inspection Report
tJ3 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.472 -5032 • Fax 912.786.9539
trit-
INTERNATIONAL
CODE COUNCIL
MEMBER
Permit No. 13 -b &73 Date Requested
Owner's Name i /n0i7 77) A.) Date Needed
Gen. Contractor > Subcontractor
Contact Information r L- t • ,y;
Project Address �_L.,.' f1/4.)A-ti /1) Z.
Scope of Work f :,� {� ' 7 C.
Inspector Date of Inspection
Inspection Pass n Fail Fee
is.;
Inspection Pass ❑ Fail 0 Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Fax Transmission Result Rep Page [1 ] of [1]
Date/Time 10 -31 -2013 10:15 AM
Model Name CLX -9352
Machine Serial Number Z94UB1ED500022H
Linel City of Tybee
Linel Name : 9127869539
Line2 is not available
Line2 Name is not available
Job Destination Start Time Duration Mode Job Type Page User Result
1207 Georgia Power rele 10 -31 -2013 10:14 00'59" G3 H -Tx 1/1 LocalUser OK
ase/1 88885 1441 1 AM
Tybee Island, GA
GEORGIA POWER RELEASE FOR ELECTRIC SERVICE
PHONE: 1- 888 - 748 -6843, Press 1, Extension 32855 or 32856
FAX: 1 -888- 851 -4411
Location Address: i/"> / /b7Z /-N/i1 Release Date: i n/jn/r-,
,fit
Type of Release: ve Tempot� ary _ Permanent Permit # t3— 07673
Electrician: 1421 IL Ili i[c J9 l G Phone # I[r14_l 451- 8 ? '74-
Builder: vi-R4-1- 6441 Phone # —rows A"- F16Z1,
Owner: tllnr nxk 1
Phone #
Location Address: Release Date:
Type of Release: _Temporary Permanent Permit #
Electrician: Phone #
Builder: Phone #
Owner: Phone #
Planning and Zoning
Jervis Bryant
912472 -5033
H -Rx: Host Rx
H -Tx: Host Tx
M -S: Memory Save P -Rx: Poll Rx D -Tx: Delay Tx
S -Rx: Secure Rx P -Tx: Poll Tx
BC -Tx: BroadCast Tx
Tybee Island, GA
GEORGIA POWER RELEASE FOR ELECTRIC SERVICE
PHONE: 1- 888 - 748 -6843, Press 1, Extension 32855 or 32856
FAX: 1- 888 - 851 -4411
Location Address: 7ID / !bZ ,4it .
Type of Release: L"" Temporary Permanent Permit # j3 — 067.3
Electrician: 14.116 l'...) i -1-rzi G
Release Date:
Phone # VrJ 451- g '7i4
Builder: 74 1- Phone # -Tom h7 -J Zf
Owner: Phone #
Location Address:
Type of Release:
Electrician:
Builder:
Owner:
Temporary
Release Date:
Permanent Permit #
Phone #
Phone #
Phone #
Planning and Zoning
Jerris Bryant
912 - 472 -5033
DATE ISSUED: 10 -22 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
CITY OF TYBEE ISLAND
BUILDING PERMIT
DISCOVERY / TEAROUT ONLY
20 NAYLOR AVE
JEFF MORTON
1238 WHITLOCK RIDGE DR
MARRIETTA GA 30064
404 - 262 -3032 ext1602
FIRST CITY ENTERPRISES
PO BOX 1016
TYBEE ISLAND GA 31328
P
$ 50.00
4- 0020 -05 -007
PROJECT VALUATION $1,000.00
PERMIT #: 130673
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Property Address:
)3 -b(0-73
aD /Awu
\Q_
City of Tybee Island, Georgia
912 - 472 -5030 • Fax 912 - 786 -9539
APPLICATION FOR BUILDING PERMIT
PIN: H-00-2_0_0c,00-)
IA Single Family
❑ Duplex
❑ Multi - Family units
❑ * Commercial unit(s)
II I Check all that apply
Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project )may require Site Plan Approval.
Details of Project: �ev� Q U I_1 C (i /t I Am 0 )1J! 1 � 1 11 Apo 1� S
Nes2��� rd{L Cfi CCzvefLr
Estimated Cost of Construction: $ /O7D -- 01)
(materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Q o
Year Built: I D 1 Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site r oom f cilities will be provided through 01./441Q-----, . Construction debris will be disposed
by Cap' i'?, C Li'f(_, by means of ('177) NQ j . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage paired b this •er +itj d c• struction.
Date: / VZ.2, )3 Signature:
Ped Name of Applicant:
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Date
to 22-!3
FEES
Permit 5 0
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL 5D
c) ;it be Gred;d =�.ci
re bJ ; i adv-vv .J
Name '
Mailing Address
Telephone
Owner
.Q_ t'��t r\
ccO TA COQ -12
Home:
Cell:
Architect or
Engineer
1
J 1 ft ICOY\ = r.1
Office:
Cell:
Contractor
I o) (
' u 12.02 j4 1�,
��
`
3
3
-13
Office: r /V6 --�7- ) 0
Cell: '0 7- 6 04- b
jp, ,-Rtx
f1�� <�y wC:a'
IA Single Family
❑ Duplex
❑ Multi - Family units
❑ * Commercial unit(s)
II I Check all that apply
Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project )may require Site Plan Approval.
Details of Project: �ev� Q U I_1 C (i /t I Am 0 )1J! 1 � 1 11 Apo 1� S
Nes2��� rd{L Cfi CCzvefLr
Estimated Cost of Construction: $ /O7D -- 01)
(materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Q o
Year Built: I D 1 Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site r oom f cilities will be provided through 01./441Q-----, . Construction debris will be disposed
by Cap' i'?, C Li'f(_, by means of ('177) NQ j . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage paired b this •er +itj d c• struction.
Date: / VZ.2, )3 Signature:
Ped Name of Applicant:
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Date
to 22-!3
FEES
Permit 5 0
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL 5D
c) ;it be Gred;d =�.ci
re bJ ; i adv-vv .J
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * * * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Shc —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http:// www. gaswcc .org /docs /field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wog s, post spaci.'g, yp- C •, A.
4
Si nat re for r3eipt of Le : d P
Printed Name
bestos, and BMP notices
Date