Loading...
HomeMy Public PortalAboutChange Order No. 5 to Contract No. 95-2014 - Metro - INDOT (R35686) - Consultant - Rundell Ernstberger - Starr Gennett area redevelopmentContract No:R -35686 Change Order No.: 005 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -35686 Letting Date: 12/1012014 District:GREENFIELD DISTRICT AE:Anthony, Oliver R. PE/S:Newkirk, Eric Status:Approved Change Order Information Change Order No.: 005 EWA: Y or Force Acct: N Date Generated: 09/15/2015 Date Approved: 09/16/2015 Reason Code: SCOPE CHANGES, Material Related Description: Reclaimed/Salvaged Aggregate Base from road removal Original Contract Amount $ 2,648,720.86 Current Change Order Amount $ 5,600.00 Percent: 0,211 % Total Previous Approved Changes $-29,913.87 Percent: -1.129 % Total Change To -Date $-24,313.87 Percent: -0.918 % Modified Contract Amount $ 2,624,406.99 Time Extension Information Date Initiated 00100/0000 Date Completed 00/00/0000 Original Contract Tlme SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00 Previous Time Approved Revised Contract Time SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value $ SS Completion Date 00100/0000 or SS CalendartWork Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R -35686 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Review and Approval information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>50/o? Scope/Design Recommendation Required? Change Order No.: 005 Page: 2 AE: DCE: SCE: * DDCM: (-LE$250K-)(-LE$750K-)(--LE$2M—}(—GT$2M—) ( 50 SS days ) ( 100 SS days ) ( 200 SS Days) ( GT 200 SS days) Y / N if Y, by Date Issued Y / N if Y, Copy to Program Budget Manager Y / N If Y, Referred to Project Manager(PM) Date to PM Date Retumed Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date If N, Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y / N if Y, Date to LPA Date Retumed FHWA Signatures Required? Y / N if Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R -35686 INDIANA Change Order No:005 Department of Transportation Contract: R -35686 Project. 0810267 - State:0610267 Change Order Nbr. 005 Change Order Descriptlow Reclaimed/Salvaged Aggregate Base from road removal Reason Code: SCOPE CHANGES, Material Related Date.09/16/2015 Page: 3 CLN PCN PLN Item Code Unit Unit Price Co Qty Comment Amount Change 0102 0010267 0102 202-02676 TON 8.750 640.000 C Amount:$ 500.00 Item Description: TRANSPORTATION OF SALVAGED MILLET) MATL Supplemental Descriptionl: salvaged stone reused as aggregate base Supplemental Descripiion2: Total value for Change Order 005 = S 5,600.00 Whereas, the Standard SpoolRcations for this contract Provides for ouch work to be performed, the following change is recommended. Genenal or Standard Change Order Explanation The existing stone base from the road removal area was salvaged and reused in place of Item 0020 Compacted Aggregate No. ss aass The msWW was quanhillIfted based on ftf-axle load counts which were stored on site near the poirrt of use. This change order compensates ttte contractor for handit the material, placing it, grading it and compacting it for use under paved are. General or Standard Change Order Explanation INDOT Project Manager has been Informed of this change order. Change Order Explanation for Specific Line item !tt!'tfM4MtN4t NltNttlttNNNNititfft NlMHttef fNktfif tNiHff•NlNMitHtNNtNltff-ttHMN+NNMHftklllfNlltsRN It is the Intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. CatlreQor t✓ eS i ` ,, y s e signed f4lli-" e2-O7 s r tsfi!lMHINMf!llflMMflN*►N1NNMlNMIN/NlitatlflMlM lNt4NfaaNtltNMfsllaltke!llH4Nty+tfNtfftatetlltfl Nt NOTE: Otter required State and FH WA signatures WIN be obtained electronically through the SIeManaGW system. Contract No:R -35686 INDIANA Change Order No:005 Department of Transportation lH;.!!tfliHHHlttif!!NlHt Httt, ttHtfNtttttNJ:.ttNNliY!lttitettffNHit�i�fll�lettNlttlfNNtlNttMt.tftltt!!fH!!! APPROVED FOR LOCAL PUBLIC AGENCY ,MMIATURE) (TITLE) SUBMITTED FOR CONSIDERATION PE[S MlHfitttitlftfNf t!f 11Nlff!lttHfli� IMtHNllNtNSNN t;NNtlf lli!!N}NtN1 HlNttlHNNY4NttNHNHNf YHiNtf �lYs Date:09/16/2015 Page: 4 z-/z-/.� (DATE) (DATE) APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date Status Project Engfneer/Supervisor NevAdrk, Eric 09/1612015 Approved