Loading...
HomeMy Public PortalAboutChange Order No. 6 to Contract No. 95-2014 - Metro - INDOT (R35686) - Consultant - Rundell Ernstberger - Starr Gennett area redevelopmentI Contract No:R -35686 Change Order No.: 006 1NDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -35686 Letting Date:12/1012014 District:GREENFIELD DISTRICT AE:Anthony, Oliver R. PE/S:Newkirk, Eric Status:Approved Change Order Information Change Order No.: 006 EWA: Y or Force Acct: N Date Generated: 09/18/2015 Date Approved: 0911812015 Reason Code: SCOPE CHANGES, Project Acceleration Description: 2" Water Service Connections, 2 Each Original Contract Amount $ 2,648,720.86 Current Change Order Amount $14,800.00 Percent: 0.559 % Total Previous Approved Changes $-24,313.87 Percent: -0.918 % Total Change To -Date $-9,513.87 Percent: -0.359 % Modified Contract Amount $ 2,639,206.99 Time Extension Information Date Initiated 00/00/0000 Date Completed 00/00/0000 Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00 Previous Time Approved SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value $ Revised Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SS Date 00/00/0000 or SP Days 0 Contract No: R -35686 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>5%? Scope/Design Recommendation Required? Change Order No.: 006 Page: 2 AE: DCE: SCE: " DDCM: (-LE$250K-)(-LE$750K-)(—LE$2M—)(—GT$2M—) ( 50 SS days) (100 SS days) ( 200 SS Days) ( GT 200 SS days) Y / N If Y, by Date Issued Y / N If Y , Copy to Program Budget Manager Y / N If Y, Referred to Project Manager(PM) Date to PM Date Returned Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y / N If Y, Date to LPA Date Returned FHWA Signatures Required? Y / N If Y, Date to FHWA Date Retumed * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R -35686 INDIANA Change Order No:006 Department of Transportation Contract: R -35686 Project: 0810267 - State:0810267 Change Order Nbr: 006 Change Order Description: 2" Water Service Connections, 2 Each Reason Code: SCOPE CHANGES, Project Acceleration CLN PCH PLN Item Code Unit Unit Price CO Qty Comment 0103 0610267 0103 715-02574 EACH 7,400.000 2.000 C Item Description: WATER SERVICE CONNECTION, 2 IN, Supplemental Descriptionl: Supplem mal Description2: Date:09/16/2015 Page: 3 Amount Change Amount:$ 14,800.00 Total Value for Change Order 006 = $14,800.00 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation Sunesis (Contractor) is to pay for the 2 each 2" water service connection fees upfront and be reimbursed by the City of Richmond at a later date. General or Standard Change Order Explanation INDOT Project Manager has been made aware of this change order Change Order Explanation for Specific Line Item aMbfMMM�MMfelt�flMtt�M�wtseM�lHeNM�e��M1a��ff ���ea Naflaati�k�N��v��.11hMfa+M�M�Mfhtt�M���MI�M�fti1 It is the intent of the parties that this change order Is full and complete compensation for the work describe above. Notification and consent to this change order Is hereby acknowledged. Contractor._ ,5/vsstei- fi r*#t1' VC4 V- Signed By:— v Date. b (^([ 1 ..,.,.«.,..,�.........�reeK�r�rMe.�a��e+w+..+�.�aM.�s�..m�..�.ere�s�:��eeN��w..nti+RMws.e�r��w�e.«.e.w...+w.• NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. e Contract No:R -35686 INDIANA Change Order No:006 Department of Transportation APPROVED FOR LOCAL PUBLIC AGENCY f-��19t�T� UF2E1 � (TITLE) J� SUBMITTED FOR CONSIDERATION PE/SG �`� Date:09/18/2015 Page: 4 (DATE) ) %-\L-is' (DATE) APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date Status Project Engineer/Supervisor Newkirk, Eric 09/18/2015 Approved