HomeMy Public PortalAboutChange Order No. 7 to Contract No. 95-2014 - Metro - INDOT (R35686) - Consultant - Rundell Ernstberger - Starr Gennett area redevelopmentContract No:R -35686 Change Order No.: 007 INDIANA Department of Transportation Page. 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -35686 Letting Date:12/10/2014 District-GREENFIELD DISTRICT AE:Anthony, Oliver R. PE/S:Newkirk, Eric Status:Pending Change Order Information Change Order No.: 007 EWA: Y or Force Acct: N Date Generated: 11/06/2015 Date Approved: 00/00/0000 Reason Code: CHANGED COND, Geotechnical Related Description;T & M for 8-1-15 through 8-31-15 for foundation removals Original Contract Amount $ 2,648,720.86 Current Change Order Amount $ 33,357.37 Percent: 1.259 % Total Previous Approved Changes $-9,513.87 Percent: -0.359 % Total Change To -Date $ 23,843.50 Percent:0.900 % Modified Contract Amount $ 2,672,564.36 Time Extension Information Date Initiated 11/06/2015 Date Completed 11/06/2015 Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 10 SP Days Value $ 0.00 Previous Time Approved SS Days by AE DCE: SCE: DDCM: SS Days SP Days Value $ Revised Contract Time SS Completion Date 12/21/2015 or SS Calendar/Work Days 10 SS Date 00/00/0000 or SP Days 0 Contract No:R -35686 Change Order No.: 007 INDIANA Department of Transportation Page: 2 Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority AE: DCE: SCE: " DDCM: t ($ per Change Order) (- LE $ 250K-) (- LE $ 750K -) ( -- LE $ 2 M —) (- GT $ 2 M — } (Days per Contract) ( 50 SS days ) (100 SS days) { 200 SS Days) ( GT 200 SS days) Verbal Approval Required? Y / N If Y, by Date Issued Total Change To-Date>5%? Y / N If Y , Copy to Program Budget Manager Scope/Design Recommendation Y / N If Y, Referred to Project Manager(PM) Required? Date to PM Date Returned Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y / N If Y. Date to LPA Date Returned. FHWA Signatures Required? Y / N If Y, Date to FHWA Date Returned " Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: Contract No:R -35686 INDIANA Date:11/06/2015 Change Order No:007 Department of Transportation Pager 3 Contract: R -35686 Project: 0810267 - State:0810267 Change Order Nbr: 007 Change Order Description:T & M for 8-1-15 through 8-31-16 for foundation removals Reason Code: CHANGED COND, Geotechnical Related CLN PCN PLN Item Code Unit Unit Price Co oty Comment Amount Change 0104 0810267 0104 109-04299 DOL 33.357.370 1.000 C Amount:$ 33,357.37 Item Description: FORCE ACCOUNT WORK Supplemental Descriptionl: Removal of unforseen foundations and slabs Supplemental Description2: Total Value for Charge Order 007 = 3 33,357.37 Milestone Time Adjustment Milestone Nbr: 02 Milestone Description: INTERMEDIATE COMPLETION DATE 2 Original Completion dt: 12/1&2015 Adj compi dt 12/3l/2015 Adj No. of Days 10 Explanation: This work was unforseen and should be granted additional time. Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation This change order covers work performed on this project in Time and Materials for work from 8-1-15 through 8-31-16 for unforseen work demolishing, removing or modifying of existing structures in the way of construction. Change Order Explanation for Specific Line Item •H��HI��",�1[�M�MHffI�HHHHH�tiMtH�M�H4HffHHRHr�Hf �HAHH,tH�NtHH�M�H�HH�f1flHHf�fH�M�H�HH�H It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. Contractor Date: Signed By: iHM�H�HH�HMIRHHMHM�MIH`HHHMMH�tHH�HHllf�HYHfMM�M�HtHHfMNMHHMRt�lkHft�N� HfIfUHHH NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Contract No:R -35686 INDIANA Change Order No:007 Department of Transportation fNaaMHN#HN MNMN#H#N Na aNHNNHHM#HfNfNHMMlHfa fHefa#H N HlMaNN fMN#HNHH#N HMaflN APPROVED FOR LOCAL PUBLIC AGENCY (SIGNATURE) (TITLE) N V4e.w (TITLE) A V SUBMITTED FOR CONSIDERATION PENS iKilff#lNfHfKHfMKfHKfKHHNHINMIffHfHfHYMflNtlf#NNtNfHKwNHHKf1fH #HNNHRMHftHtHKHw#4! Date: 11 /06/2015 Page: 4 �1�-/� (DATE) 1 %- IL- )S (DATE) APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date Status Project Engineer/Supervisor Newkirk, Eric 00/00/0000 Action Pending