Change Order No.: 009
INDIANA Department of Transportation Page: 1
Construction Change Order and Time Extension Summary
Contract Information
Contract No.: R -35686 Letting Date:12/10/2014
District:GREENFIELD DISTRICT
AE:Anthony, Oliver R. PE/S:Newkirk, Eric Status:Pending
Change Order Information
Change Order No.: 009 EWA: Y or Force Acct: N
Date Generated: 11/21/2015
Date Approved: 00/00/0000
Reason Code: ERRORS & OMISSIONS, Design/Plan Related
Description: Stes 2 & 9 modifications
Original Contract Amount
$ 2,648,720.86
Current Change Order Amount
$1,392.17 Percent: 0.053 %
Total Previous Approved Changes
$ 30,199.20 Percent: 1.140 %
Total Change To -Date
$ 31,591.37 Percent: 1.193 %
Modified Contract Amount
$ 2,680,312.23
Time Extension Information
Date Initiated 12/21/2015 Date Completed 12/22/2015
Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0
SP Date 00/00/0000 or SP Days
(SS = Standard Specification, SP = Special Provision)
Time Elemeni Description: r
Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00
Previous Time Approved SS Days by AE: DCE: SCE: DDCM:
SS Days SP Days Value $
Revised Contract Time SS Completion Date 00/00/0000 or SS CalendartWork Days 0
SS Date 00/00/0000 or SP Days 0
Contract No:R -35686
INDIANA Department of. Transportation
Construction Change Order and Time Extension Summary
Review and Approval Information
Required Approval Authority
($ per Change Order)
(Days per Contract)
Verbal Approval Required?
Total Change To-Date>5%?
Scope/Design Recommendation
Required?
Change Order No.: 009
Page: 2
AE: DCE: SCE: * DDCM:
(-LE$250K-)(-LE$750K-)(--LE$2M--)(—GT$2M—)
( 50 SS days) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days)
Y / N If Y, by Date Issued
Y / N If Y , Copy to Program Budget Manager
Y / N If Y, Referred to Project Manager(PM)
Date to PM
Approval Authority Concurs with PM? Y / N If Y, Concurrence by
If N,Resolution: Approved,
Date Returned
Date
Disapproved
Resolved by Date
LPA Signatures Required? Y / N If Y, Date to LPA Date Returned
FHWA Signatures Required? Y / N If Y. Date to FHWA Date Returned
* Field Engineer Recommendation (Required for SCE or DDCM Approval)
Field Engineer Date
Comments: __
Contract No:R -35686 INDIANA
Change Order No:009 Department of Transportation
Contract: R -35666
Project: 0810267 - State:0610267
Change Order Nbr: 009
Change Order Description: Str's 2 & 9 modifications
Reason Code: ERRORS & OMISSIONS, Design/Plan Related
CLN PCN PLN Item Code Unit Unit Price Co oty Comment
0106 0810267 0106 ? 05-06807 LS 896.010 1.000 C
item Description: ADDITIONAL
Supplemental Descriptionl: Structure No. 9 modfications
Supplemental Descdption2:
Date: 11 /23/2015
Page: 3
Amount Change
Amount:$ 896.01
0107 0810267 0107 105-06807 LS 496.160 1.000 C Amount:$ 496.16
Item Description: ADDITIONAL
Supplemental Descriptionl: Structure No, 2 modifications
Supplemental Descfiption2:
Total Value for Change Order009 = $ 1.392.17
Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended.
General or Standard Change Order Explanation
Structure No. 9 was 2 feet lower than the plan elevation and the existing pipe which the structure straddled was a 30 inch pipe not a 24 inch pipe
as shown on the plans causing additionals excavation modifying the bottom section by cutting the doghouse cut out larger to recieve the 30 inch
pipe additional bricks and an addOonal 1.5 CY of concrete for an increased cost of 896.01 dollars
General or Standard Change Order Explanation
Structure No_ 9 was 2 feet lower than the plan elevation causing the need for a new cone shaped manhole section.
Change Order Explanation for Specific Line Item
iHfifMfHlfltfflNNIHHtHNft+tfNttNtttlfNNHiMf/NNN1tttMiN�f!lftlttftt....RNt.N.Atl----NfMHtH�4L
It is the Intent of the parties that this change order is full and complete compensation for the work describe above.
Notification and consent to this change order is hereby acknowledged.
Contractor.11 Al:q i,t Signed By:
Date: 13�
•ttfttNNftNtflHtNtHftNtMlNtlfttttHf NtNNt HlfNNHfNlHlNNfNRNlN1NNtMtNttfH!!flNNfH!lNHHN1tf
NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.
Contract No:R -35686 INDIANA
Change Order No:009 Department of Transportation
RNf 4NHNia4N1Nf 4NN4NHlNlN N4N4NN4f MaNNaN444NNN44N1.N1444Na�14N4N4H441444N4 N 4NH44444NNN44NN
APPROVED FOR LOCAL PUBLIC AGENCY
�Zla'� t9� OyAk*k-
RE) (TITLE)
f6a I-Iet- m" 6-we-
(SIGNATURE) (TITLE)
a4aNN4Rf44N4NNRNNNNR44N4N Nf HflNNRtfKHf f N1lf NNR!!NlNNaNNRNNRR4RN4+MNN44NN444tNH44NRf 4N4N
�. SUBMITTED FOR CONSIDERATION
PFJS G
t NRR 4NRfftflfNNN4f4ft444411t4NtNltfNNlNktkttl4MSf444NNNltfN4NlNlNNRNwN444NNN4NNNNftNlNN4lNN
Date: 11/23/2015
Page: 4
/'� 3 7�r
(DATE)
1Z-3-iS
(DATE)
APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION
Approval Level Name of Approver Date
Project Engineer/Supervisor Newkirk, Eric 00/00/0000
Status
Action Pending