Loading...
HomeMy Public PortalAboutChange Order No. 9 to Contract No. 95-2014 - Metro - INDOT (R35686) - Consultant - Rundell Ernstberger - Starr Gennett area redevelopmentContract No:R -35686 Change Order No.: 009 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -35686 Letting Date:12/10/2014 District:GREENFIELD DISTRICT AE:Anthony, Oliver R. PE/S:Newkirk, Eric Status:Pending Change Order Information Change Order No.: 009 EWA: Y or Force Acct: N Date Generated: 11/21/2015 Date Approved: 00/00/0000 Reason Code: ERRORS & OMISSIONS, Design/Plan Related Description: Stes 2 & 9 modifications Original Contract Amount $ 2,648,720.86 Current Change Order Amount $1,392.17 Percent: 0.053 % Total Previous Approved Changes $ 30,199.20 Percent: 1.140 % Total Change To -Date $ 31,591.37 Percent: 1.193 % Modified Contract Amount $ 2,680,312.23 Time Extension Information Date Initiated 12/21/2015 Date Completed 12/22/2015 Original Contract Time SS Completion Date 00/00/0000 or SS Calendar/Work Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Elemeni Description: r Current Time Extension SS Days 0 SP Days 0 SP Days Value $ 0.00 Previous Time Approved SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value $ Revised Contract Time SS Completion Date 00/00/0000 or SS CalendartWork Days 0 SS Date 00/00/0000 or SP Days 0 Contract No:R -35686 INDIANA Department of. Transportation Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>5%? Scope/Design Recommendation Required? Change Order No.: 009 Page: 2 AE: DCE: SCE: * DDCM: (-LE$250K-)(-LE$750K-)(--LE$2M--)(—GT$2M—) ( 50 SS days) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days) Y / N If Y, by Date Issued Y / N If Y , Copy to Program Budget Manager Y / N If Y, Referred to Project Manager(PM) Date to PM Approval Authority Concurs with PM? Y / N If Y, Concurrence by If N,Resolution: Approved, Date Returned Date Disapproved Resolved by Date LPA Signatures Required? Y / N If Y, Date to LPA Date Returned FHWA Signatures Required? Y / N If Y. Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer Date Comments: __ Contract No:R -35686 INDIANA Change Order No:009 Department of Transportation Contract: R -35666 Project: 0810267 - State:0610267 Change Order Nbr: 009 Change Order Description: Str's 2 & 9 modifications Reason Code: ERRORS & OMISSIONS, Design/Plan Related CLN PCN PLN Item Code Unit Unit Price Co oty Comment 0106 0810267 0106 ? 05-06807 LS 896.010 1.000 C item Description: ADDITIONAL Supplemental Descriptionl: Structure No. 9 modfications Supplemental Descdption2: Date: 11 /23/2015 Page: 3 Amount Change Amount:$ 896.01 0107 0810267 0107 105-06807 LS 496.160 1.000 C Amount:$ 496.16 Item Description: ADDITIONAL Supplemental Descriptionl: Structure No, 2 modifications Supplemental Descfiption2: Total Value for Change Order009 = $ 1.392.17 Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation Structure No. 9 was 2 feet lower than the plan elevation and the existing pipe which the structure straddled was a 30 inch pipe not a 24 inch pipe as shown on the plans causing additionals excavation modifying the bottom section by cutting the doghouse cut out larger to recieve the 30 inch pipe additional bricks and an addOonal 1.5 CY of concrete for an increased cost of 896.01 dollars General or Standard Change Order Explanation Structure No_ 9 was 2 feet lower than the plan elevation causing the need for a new cone shaped manhole section. Change Order Explanation for Specific Line Item iHfifMfHlfltfflNNIHHtHNft+tfNttNtttlfNNHiMf/NNN1tttMiN�f!lftlttftt....RNt.N.Atl----NfMHtH�4L It is the Intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. Contractor.11 Al:q i,t Signed By: Date: 13� •ttfttNNftNtflHtNtHftNtMlNtlfttttHf NtNNt HlfNNHfNlHlNNfNRNlN1NNtMtNttfH!!flNNfH!lNHHN1tf NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. Contract No:R -35686 INDIANA Change Order No:009 Department of Transportation RNf 4NHNia4N1Nf 4NN4NHlNlN N4N4NN4f MaNNaN444NNN44N1.N1444Na�14N4N4H441444N4 N 4NH44444NNN44NN APPROVED FOR LOCAL PUBLIC AGENCY �Zla'� t9� OyAk*k- RE) (TITLE) f6a I-Iet- m" 6-we- (SIGNATURE) (TITLE) a4aNN4Rf44N4NNRNNNNR44N4N Nf HflNNRtfKHf f N1lf NNR!!NlNNaNNRNNRR4RN4+MNN44NN444tNH44NRf 4N4N �. SUBMITTED FOR CONSIDERATION PFJS G t NRR 4NRfftflfNNN4f4ft444411t4NtNltfNNlNktkttl4MSf444NNNltfN4NlNlNNRNwN444NNN4NNNNftNlNN4lNN Date: 11/23/2015 Page: 4 /'� 3 7�r (DATE) 1Z-3-iS (DATE) APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date Project Engineer/Supervisor Newkirk, Eric 00/00/0000 Status Action Pending