Loading...
HomeMy Public PortalAboutChange Order No. 13 to Contract No. 95-2014 - Metro - INDOT (R35686) - Consultant - Rundell Ernstberger - Starr Gennett area redevelopmentContract No:R -35686 Change Order No.: 013 INDIANA Department of Transportation Page: 1 Construction Change Order and Time Extension Summary Contract Information Contract No.: R -35686 Letting Date:12/10/2014 District:GREENFIELD DISTRICT AE:Anthony, Oliver R. PE/S:Newkirk, Eric Status:Approved Change Order Information Change Order No.: 013 EWA: Y or Force Acct: N Date Generated: 01/19/2016 Date Approved: 01/21/2016 Reason Code: CHANGED COND, Geotechnical Related Description: drainage items Original Contract Amount $ 2,648,720.86 Current Change Order Amount $1,414.35 Percent: 0.053 % Total Previous Approved Changes $ 89,896.09 Percent: 3.394 % Total Change To -Date $ 91,310.44 Percent: 3.447 % Modified Contract Amount $ 2,740,031.30 Time Extension Information Date Initiated 10/21/2015 Date Completed 11/22/2015 Original Contract Time SS Completion Date 00/00/0000 or SS CalendarNVork Days 0 SP Date 00/00/0000 or SP Days (SS = Standard Specification, SP = Special Provision) Time Element Description: Current Time Extension SS Days 0 SP Days 1 SP Days Value $ 0.00 Previous Time Approved SS Days by AE: DCE: SCE: DDCM: SS Days SP Days Value $ Revised Contract Time SS Completion Date 00/00/0000 or SS CalendarNVork Days 0 SS Date 00/00/0000 or SP Days 0 i Contract No:R -35686 INDIANA Department of Transportation Construction Change Order and Time Extension Summary Review and Approval Information Required Approval Authority ($ per Change Order) (Days per Contract) Verbal Approval Required? Total Change To-Date>5%? Scope/Design Recommendation Required? Change Order No.: 013 Page: 2 AE: DCE: SCE: * DDCM: (-LE$250K-)(-LE$750K-)(--LE$2M—)(--GT$2M--) ( 50 SS days) ( 100 SS days) ( 200 SS Days) ( GT 200 SS days) Y / N if Y, by Date Issued Y / N If Y , Copy to Program Budget Manager Y / N If Y, Referred to Project Manager(PM) Date to PM Date Returned Approval Authority Concurs with PM? Y / N If Y, Concurrence by Date If N,Resolution: Approved Disapproved Resolved by Date LPA Signatures Required? Y / N If Y, Date to LPA Date Returned FHWA Signatures Required? Y / N If Y, Date to FHWA Date Returned * Field Engineer Recommendation (Required for SCE or DDCM Approval) Field Engineer l�c._lt��,� Date " 2 Comments: Contract No:R -35686 INDIANA Change Order No:013 Department of Transportation Contract: R -35686 Project: 0810267 - State:0810267 Change Order Nbr: 013 Change Order Description: drainage items Reason Code: CHANGED COND, Geotechnical Related CLN PCN PLN item Code Unit Unit Price Co city Comment 0111 0810267 0111 105-06807 LS 1,414.350 1.000 C Item Description: ADDITIONAL Supplemental Descriptionl: miscellaneous drainage items Supplemental Description2: Date:01121l2016 Page: 3 Amount Change Amount:$ 1,414.35 Total Value for Change Order 013 = $1,414.35 Milestone Time Adjustment Milestone Nbr: 02 Milestone Description: INTERMEDIATE COMPLETION DATE 2 Original Completion dt: 12/18/2015 Ad] compi dt 0110912016 Adj No. of Days 1 Explanation: an additional day is added for this work that was not included In the original contract. Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. General or Standard Change Order Explanation These changes include an existing underdrain at the north pavement removal limits that was rerouted as part of this lump sum item to outlet onto the parking lot. These changes also include a French drain that was included after if was decided to eliminate the grass pavers that were adjacent to the permeable pavers behind the Stan-Gennett Building that provided solid water transfer surface to the permeable pavers during periods of high intensity rainfall periods. Change Order Explanation for Specific Line Item flf1w4M1wf fHMMffMHtMH4MHwf4a,HHtffH4ffwHfwewH4faH4ffffflMH4NHff 4t HHRRHwHaf f4wff4HwH4ffwH4fff4ff4<M It is the intent of the parties that this change order is full and complete compensation for the work describe above. Notification and consent to this change order is hereby acknowledged. Contractor: r emu' N G 1 r j' Signed By: two ,.. ,.. Date: 112wI 44lRHwf HHRtHRii4H<RHHfRl44lH4MHf HHMfR4fMtRN<HHtf<l1HN4H,444t}RtfRHR1,HlHHffi<MRl444tHf4f<HHHlH NOTE: Other required Stale and FHWA signatures will be obtained electronically through the SiteManager system. � 1 � Contract NOR -35686 INDIANA Change Order No:013 Department of Transportation f f YHfHHHYNHYHMHYHHIYHHHSYYwIYYYHf H HYHY YYYH HfHHYff f HHIHaYYHYfYflHlflYHHf yfltHYnY Hf YMHIMf H APPROVED FOR LOCAL PUBLIC AGENCY (SIGNATURE) (TITLE) 7aj (TITLE) PE/S/`- SUBMITTED FOR CONSIDERATION ffHHHlHlHlHfHHlHlHHlHtflHlHfH11HHlYlHHHf1HYHlf1fHlflHfHf 1fflfHIHYHHfHNfif!lHM1H1HHYHYH Date:01/21/2016 Page: 4 -�-/ `X� (DATE) a_ (DATE) y--Iev APPROVED FOR INDIANA DEPARTMENT OF TRANSPORATION Approval Level Name of Approver Date Status Project Engineer/Supervisor Newkirk, Eric 01/21/2016 Approved