HomeMy Public PortalAboutCAPTAINS VIEW_32.pdfDATE ISSUED: 11 -6 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
CITY OF TYBEE ISLAND
BUILDING PERMIT
REROOF - METAL
32 CAPTAIN'S VIEW
THOMAS BRUNSON
1030 FISHER ST
SAVANNAH GA 31410 -2807
C M MORRIS ROOFING
545 LITTLE NECK RD
SAVANNAH GA 31419
P
$ 83.00
4- 0021 -16 -070
PROJECT VALUATION $4,500.00
PERMIT #: 130708
TOTAL BALANCE DUE: $ 83.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
/3-670S)
Property Address: -37 Cc1 V; Ct.J
City of Tybee Island, Georgia
912 - 472 -5030 • Fax 912- 786 -9539
APPLICATION FOR BUILDING PERMIT
PIN:
c .N� h(.o is
" ingle Family
Duplex
❑ Multi - Family units
❑ * Commercial unit(s)
Check all that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
El Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: Remove., CtC?. f6 -4 k Qoo'€ And Ei.& ‘/N1 CAI
Estimated Cost of Construction: $ `{ S �1_) (materials + labor + profit /overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: 1 C1 01 6- Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date: f (c ° (3 Signature:
Printed Name of Applicant:
C6AuA 772a4rco
K :; i1Uv'i S
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Signature Date
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Name
Mailing Address
Telephone
C\ 3u�v)
lu C F s 1n � c- 3 1'-1 l U
3
Home:
Cell: Cc> 13. ' 916'3
Architect or
Engineer
).WQYf-5
Office:
Cell:
Contractor
Chi i5 c`'occ -lc-,
_
L15 The NEck Rd , 3i11 1R
Office:
Cell: (i(C7- (.66-7
c .N� h(.o is
" ingle Family
Duplex
❑ Multi - Family units
❑ * Commercial unit(s)
Check all that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
El Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: Remove., CtC?. f6 -4 k Qoo'€ And Ei.& ‘/N1 CAI
Estimated Cost of Construction: $ `{ S �1_) (materials + labor + profit /overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: 1 C1 01 6- Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date: f (c ° (3 Signature:
Printed Name of Applicant:
C6AuA 772a4rco
K :; i1Uv'i S
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Signature Date
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * * * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co - Construction Exit and Sd1 -
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http://www.gaswcc.org/docs/field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts, post spacing, Type C or A.
C ,A4 .441 t-— c 3
Signature for receipt of Lead Paint, Asbestos, and BMP notices Date
Printed Name
Chatham County Board of Assessors: 2013 Property Record Card 4- 0021 -16 -070 Page 1 of 2
2013 Chatham County Board of Assessors 4- 0021 -16 -070
Property Record Card
32 CAPTAINS VIEW TYBEE ISLAND
APPRAISER MWTHOMAS
LAST INSP 03/13/2013
APPR ZONE 000008
LOT 10B SUB OF LOT 10 CAPTAIN'S ROW TYBEE ISLAND SMB 16S
25
BRUNSON THOMAS I AS
TRUSTEE*
1030 FISHER ST
SAVANNAH GA 31410
CAMA ASMT
121,400 121,400 LAND 1
132,700 132,700 BLDG 1
OBXF 0
254,100 254,100 Cost -
MS
SALES BOOK/ INS VI QU RSN PRICE
PAGE
29 Feb 376X 335 QC I U UR
2012
GRANTOR:BRUNSON THOMAS I
GRANTEE:BRUNSON THOMAS I AS TRUSTEE*
01 Mar 302X 0225 WD I Q 490,000
2006
GRANTOR:GRIER PHIL G
GRANTEE:BRUNSON THOMAS I
10 Sep 188K 0151 WD I Q 135,000
1997
GRANTER:ROACH MICHAEL J
GRANTEE:GRIER PHIL G
15 Mar 165X 0453 WD V U UN 27,000
1994
GRANTOR:SIMMONS ROBERT E
GRANTEE:ROACH MICHAEL JAMES
COMMENTS:
04 Jun 2012
15 Nov 1999
03 Dec 1996
*TY13 THOMAS IVEY
BRUNSON LIVING TRUST
376X/335
ADD CHG LTR 11 -15 -1999 SSB
1997 NEW PIN; SPLIT OUT OF
4- 21 -16 -18 12/3/96
[Click for larger picture]
SAGS,,,
?_ti a am County
Tax Commissioner
Property Tax Statement
CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA 0004 Tybee Island
NBHD 003030.00 C030 CAPTAINS
ROW TY
EXEMPTIONS
HISTORY LAND IMPR TOTAL
2012 121,400 115,400 236,800 Cama
2011 156,700 115,400 272,100 Cama
2010 174,100 115,400 289,500 Cama
2009 156,500 156,500 313,000 Over
2008 217,500 255,000 472,500 Cama
2007 217,500 241,500 459,000 Cama
2006 109,000 221,500 330,500 Cama
2005 68,000 230,500 298,500 Cama
2004 68,000 175,500 243,500 Cama
2003 68,000 149,500 217,500 Cama
2002 40,000 116,000 156,000 Cama
2001 40,000 114,000 154,000 Cama
2000 33,000 109,500 142,500 Cama
1999 33,000 109,500 142,500 Cama
1998 33,000 107,500 140,500 Cama
1997 30,500 97,500 128,000 Cama
LAND
ID# USE DESC
112099 SINGLE FAMILY RES 40 85 3,400.00 -SF 39.68 R2 -10 121400
FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
http: //boa.chathamcounty. org/DesktopModules/ ChathamCounty /BoardofAssessors /Propert... 11/6/2013
2
Chatham County Board of Assessors: 2013 Property Record Card 4- 0021 -16 -070 Page 2 of 2
2013 Chatham County Board of Assessors
Property Record Card
4- 0021 -16 -070
32 CAPTAINS VIEW TYBEE ISLAND
BUILDING SECTION
87128 -1 -2013
CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
Residential 156,139 1995 MS 15.00 0.00 0.00 0.00 15.00 132,71B 132,700
12'
■100
T..,, Stun
1152
1711
Ruilt -iv Gn'age
576
192
[Click for larger picture]
32 CAPTIANS VIEW
SECTION TYPE 1 - Main
AREA 1152
TYPE 1 - Single- family Residence
FRAME 1 - Stud Frame
STYLE 2 - Two Story
QUALITY 5.00
CONDITION 3.00
# UNITS 0
# OF BEDS / BATHS 2 /2.00
COMPONENTS Units % QUAL
R1 108 Frame, Siding, Wood 100.00
R2 214 Metal, Preformed 100.00
R3 352 Heat Pump 100.00
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #) 10.00
R6 602 Plumbing Rough -ins ( #) 1.00
R7 711 Built -in Garage (SF) 576.00
R11 903 Wood Deck (SF) 192.00
R11 903 Wood Deck (SF) 144.00
R11 904 Slab Porch (SF) with Roof 192.00
R11 904 Slab Porch (SF) with Roof 192.00
http: //boa. chathamcounty. org/ DesktopModules /ChathamCountyBoardofAssessors /Propert... 11/6/2013