HomeMy Public PortalAbout09-0247 GreenPermit No.
Owner's Name
Gen. Contractor
Contact Information
Project Address
City of Tybee Isi nd . Community Development Dept.
Inspection Report
403 Butler Ave., P.O. Box 2749 Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
oz
k14-17
1 7Do S <__orEAT1,44
Date Requested
Date Needed
Subcontractor
6S-E
330
S
4JiDc4)
Scope of Work IA)
Inspector
5 / 4/ -
Inspection r•)a- Fail Fee
Inspection Pass El Fail 0 Fee
Inspection Pass Ei Fail Fee
Inspection Pass Fail 0 Fee
DP50 643307 III IIIIIIIIIIIIIIIIIIIIIII111111IIIII
I
NFRC '
National Fenestration
RatingCouncit@
AMI
3102 - IPPact Slider
CPD# ASO—A -54 -00008
SOLID UINYL — UELDED — DOUBLE GLZD
13/16 IG, LM LO —E. ARGON
CERTIFIED
ENERGY PERFORMANCE RATINGS
U- Factor
0.32
(U.S. /I -P)
1.82
(Metric /SI)
Solar Heat Gain Coefficient
0.32
ADDITIONAL PERFORMANCE RATINGS
Visible Transmittance
0.51
worow
AMR
Manufacturer stipulates that these ratings conform to applicable NFRC procedures for determining whole
product performance. NFRC ratings are determined for a fixed set of environmental conditions and a
specific product size. NFRC does not recommend any product and does not warrant the suitability of any
product for any specific use Consult manufacturer's literature for other product performance information.
www.nfrc.org
El I I II I II11111111111I 111 (1111111111
National Fenestration
Rating Council@
Series 4D11 Double Hung
CPD# ASO —R -11 -00753 -00001
SOLID UINYL — UELDED — DOUBLE GLZD
13/16' IG, DS LE70, ARGON
U- Factor
Manufacturer stipulates that these ratings conform to applicable NFRC procedures for determining whole
product performance. NFRC ratings are determined for a fixed set of environmental conditions and a
specific product size. NFRC does not recommend any product and does not warrant the suitability of any
product for any specific use Consult manufacturer's r tc i ature for other product performance information.
DATE ISSUED: 05 -22 -2009
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
R &R WINDOWS
1308 SEVENTH AVE
OWNER NAME ROBERT GREEN
ADDRESS PO BOX 2558
CITY, ST, ZIP TYBEE ISLAND GA 31328 -2558
PHONE NUMBER
CONTRACTOR NAME WINDOW WORLD OF SAVANNAH
ADDRESS 2708 LEGION DR
CITY STATE ZIP THUNDERBOLT GA 31404
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 137.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $15,235.00
PERMIT #: 090247
TOTAL BALANCE DUE: $ 137.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
�I�
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
c',4' ozd7
Location:
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
1"30' ?it ,vEI
NAME
ADDRESS
P1N #
Owner
`lei db eel- Co ,
C®/Ee)
.2(0 b` L INcv ,0,4 /,v NA..-■t. v
,p .f /3 -t) ?I ALITA/ ;41269c'e,:
/V /'`
e-H4,t -.
Robed-, 6 kfel.
— /U/ ? 1, J
Lo c/4---1-- (0)1
-I/-
.S ►, A NZ io4.,l ,c.. C h . r•-,4
• i . / /1V6,4 . -I/V L- TW ./V A-
A_
-0E-Eftgifle
Building-
DOLL)
45e -/ 3 94, 1bc� -66 34.
rf
%}Mee - s ,
(Check all that apply)
❑ Repair ❑ Residential
Renovation ❑ Single Family
❑ Minor Addition ❑ Duplex
❑ Substantial Addition ❑ Multi- Family
❑ Other ❑ Commercial
Details of Project:
-epLi��EHF��
❑ Footprint Changes
❑ Discovery
❑ Demolition
/ d
Estimated Cost of Construction: $
A., TA i
!Z / 91'Lr'S • Nei
Peopa SA-LS LL51 c23.57A
Construction Type l (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use: `ke. S . 4 - L ,,,0„0/../h
Remarks:
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Area Living space (total sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) With culvert? With swale?
Setbacks: Front Rear Sides (L) (R)
# Stories Height Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through
On -site waste and debris containers will be provided by u)tv a -) ZOO, f/ Se& ,4 77):C f t p)
Construction debris will be disposed by ,c t0ekw u.)6E ( -( by means of / ,4ii C AttiA y .
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: 3----.2g-,706 i Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator _
Code Enforcement Officer 172%f
Water /Sewer
Storm/Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
00
TOTAL 131°'=
"Simply the Best for Less"
Vt ow World of Savannah
2706 Legion Drive • Thunderbolt, GA 31404
Phone: (912) 355 -5055 • (888) 418 -9800
Fax: (912) 355 -5017
www.windowworld.com
w *nroc
Good Househaeping
Customer: L Rob
Rp Robed- % Cr (
, T r�v►/ Phone (h) REVIEW FOR CODE COMPLIANCE
Every effort has been made to identify
Install Address: /30g 7 t A ✓QNwP- Tyhc? 2-5 /a,✓d,Gil 3/32g Phone (w) 65 R violations, no oversight by the
Bill Address: E -mail reviewer shall be construed as authority
, cancel, alter or set aside
able codes or ordinances. The
permit should not be construed
ty or guarantee.
y-21 Date�iZZhq
COMFORTWORLD
Series 2000 DH Mech -Weld $190
tie mine
COMFORTWORLD VALUE PL y applic,
/0 Series 4000 DH All- Welded $ d
Series 4000 DH All - Welded $200
Series 6000 DH All-Welded $� a- a- Warrar
Series 6000 DH All- Welded $220
Window Color
Reviewed d
INCLUDED IN VALUE PLUS
/ S. Hurricane Rated Up to 140 mph (3' x 5') $25 anit-
/Y0 Full Screens $27
No Colonial Grids $37
7RT Contoured Grids $42
f y Half Screens $9
Diamond Grids $78
Double Locks (on windows > 25 ") $5
Oriel / Cottage Style (40/60 or 60/40) $38
/ Solarzone Energy Package $32
----/T
Picture Window $3
Argon Gas $15
y 2 Lite Sliderrytoz-//Cowg g 4/9osi sm,, al IL
%$ Foam Insulation on Jambs $11
2 Lite Slider Swing & Clean (AMI only) $409
— Remove Storm Windows $10
3 Lite Slider $550
Lifetime Glass Breakage Warranty $11 O'S
3 Lite Slider Swing & Clean (AMI only) $625
/ Double Lifetime Warranty H C
Casement $315
Total Options $118 WINDOWS
Sale Price I
$59
YOU SAVE PER WINDOW $S9 APPROV!I
Twin Casement $630
3 Lite Casement $945
Bay Window $2300
Bow Window $2650
PO tllrq
MISCELLANEOUS
a s Custom Exterior Trigg $e, / 3010,
Garden Window $1950
Brown Exterior (6000 onl y) $90
i .
Facin g W Color re
Almond / Beige $37
`
! 0 Metal Window Extra Labor $56 OA,O,
Woodgrain Interior Color $90
Mull To Form Multi -unit $40
y Specialty Window Trapezoids 633$ 24iq a,
Tempered DH Sash (BSO) (TSO) $75
White Int. / Beige Ext. $90
Tempered Other $9 /Sq. ft.
Tinted Glass $48
DOORS
VSP Vinyl Rolling Patio Door 6ft. $850
—q—VSP Vinyl Rolling Patio Door 8ft. tinstotre
Obscure Glass (BSO) (TSO) $35
575A i
Install Interior Trim (Stops) $40
VSP Vinyl Rolling Patio Door 9ft. $1050
Install Interior Casing $50
Includes Exterior Vinyl Facing
Facing Color
Repair, Sill or Jamb $55
Lifetime Glass Breakage Warranty $11
Specialty Door
Remove Window Unit A/C $90
Grids Patio Door $100
Solarzone Elite Energy Package Upgrade $89
y Low -E Patio Door $125 SOO/
TOTAL LIST PRICE $ 13900
Storm Door $
You the buyer are responsible for the removal and installation of any existing security system and window treatments. Initial:
NO EXTRA WORK IF NOT IN WRITING!
�1 L' 3/S �P.e%�S �5 t.
05150, c. h.tt�f' G ✓nlG /�t" ,,,nw7`e.rr4I
/a 6or /'n al /rchw+ /i .. four tr0iae.us,,d,
apemi ir9s, A/ /,firf5 tv/l /he_ h444,Iedi
0.40121 aArd,1 t4 s f?4SP,rildin ;N WW,eilvt&dit
Customer
mwd,
Card
Balance
agrees to the terms of payment as follows:
Carpentry / Alteration Extra Labor $ 5%$O. 7la jte2g:ist eb
Site Set -up & Landfill Disposal Fee $ $85.00
Total Amount $ /4/ y35.
Custom Order Deposit 50% $ 721R,Ck#
Expiration Date
LOAN d,,. -,n o s��/'/
Paid to Installer upon Completion $ 72y 7,
APPROVAL #
Amount Financed $
You the buyer may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction.
Notice of cancellation must be in writing postmarked no later than midnight of the following third business day.
THIS IS A CUSTOM ORDER NOT FOR RESALE!
EACH WINDOW WORLD IS INDEPENDENTLY OWNED AND OPERATED
Thuntl ,808 Window 10-08
Owner
Date
Salesman Date Owner
White Copy - Original Yellow Copy - File Pink Copy - Customer
Date
OWS, DOORS AND SKYLIGHTS
9 TABLES 602A1, 602A2, 602A3, SECT. 60
301.2.1.2
GLASS DOORS AND SKYLIGHTS SHALL SE
AND INSTALLED TO COMPLY WITH 80Th
NO NEGATIVE PRESSURES,
DP45i1l
1-)/5.(4.0 vWIX
P•O. Box 2558
• 1013 ] --Ivvy 80
Tgbee (Jc nd, GA 31328
inch I nvenino%
May 21, 2009
As required for compliance on replacement of windows /doors for the 1308 7th
Avenue window and sliding door replacement project:
A value of $800.00 is estimated for the purchase of materials and work to create 1 /2"
plywood panels for all the windows and 4 sliding glass doors.
Your focus- eiezer!rnines your realit y.