Loading...
HomeMy Public PortalAboutEIGHTEENTH ST_6.pdfDATE ISSUED: 10 -15 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT ROOF REPAIRS 6 EIGHTEENTH ST ROBERT & PAULA CROWE 1207 MAGNOLIA AVE BRUNSWICK GA 31520 -7474 230 -1135 COLLINS CONSTRUCTION SER, INC. PO BOX 30785 SAVANNAH GA 31410 P $ 900.00 4- 0009 -05 -014 PROJECT VALUATION $35,000.00 PERMIT #: 130647 TOTAL BALANCE DUE: $ 900.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: c),....) CD*6 P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org Mailin ' Address PIN: (-/' 0009 — 0S-014 Tele • hone Home: Cell: —i3 Office: fil A'AAJal Cell: p� � � � Office: ' /,2 r`t33 2.ov CO) I; VI 4, ts�e /a,, ,R,R!2) Fat, l ell: '7l-.L 6$/ 713 Property Address: 3- o 4-7 City of Tybee Island, Georgia 912 -472 -5030 Fax 912 -786 -9539 APPLICATION FOR BUILDING PERMIT Name Architect or Engineer Contractor Single Family ❑ Duplex [I Multi - Family units ❑ * Commercial unit(s) Check all that apply ❑ DiscoverylTearout El Footprint Changes ❑ additional square feet heated /cooled ❑ Demolition or Relocation ❑ Other ace•. 27 • 313140 * A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with the appropriate State % Georgia profertonal license. A commercial project may require Site Plan Approval. 1 Details of Project: 4) oI ' r .f 160 1 rh on 3 Doe • ko" Estimated Cost of Construction: $ c., JD 0) 0 - (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and/or survey of the property. Depending upon the scope of the work, two sets of construction drawings and /or a site plan may be required. (S Listed on National Historic Register or located within a National Historic District? Y / Year Built: � l3. ▪ Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island, • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction On -W. Wstroom f ciliti s wi be provided through CU.)v\.c' Construction debris will be disposed by (.,. Ili Vr S S Vt� ( by means of _ I understand that I must comply with zoning, flood damage control, building, fire, shoes protection an wet /_ nd ordinances,, FEMA regulations and all applicable codes and tg latians. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions that may be necessary to restore drainage imp: ired by t permitted construction_ Date: - '7 `) Signature; rutted Name of Applicant: Note: A • ermit normall takes 7 to 10 da s to • rocess. Processin a time for a historic structure maybe longer. S au.- k: errs r<o 4 - re Approvals: • Signatu Date Planning & Zoning Manager Djt3 \ 0-1.5- ( 3 Building Official Water /Sewer Storm /Drainage - City Manager or (iJ , 4-k av t o Pere FEES Permit 12c Inspections ! ps Cap. Cost Rec. �- Water Tap Sewer Stub Eng. Fees Aid to Const. 325 X 2- IOS° TOTAL 0 LEAD - BASED PAINT RRP RULES Ordinary renovation and maintenance activities can create dust that contains lead_ Contractors who perform renovation, repairs, and painting jobs in pre -1978 housing and child - occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right; lr)mportartt_Lead Hazard information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices_ Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026. Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per Interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * * * * * * * * * * * * * * * * ** Asbestos /Environmental Notification to Georgia EPD for Proiecfis Involving �emoli'tiort Wirecking, or Renovation The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules_ The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * * * ** * * * * * * * * * * * * * ** BMPs While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sdl — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; http: l/ www_ gaswcc .orgldocstfield_manual_4ed.pdf. Problems with the Co is not limited to the installation, but to material. The stone will be a representation of 1.5 " -3.5" stone or larger. Type A sediment barriers have been installed where Type C is required and shown on the permit drawings, Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, p.-t pa ing, T 'e C or Signature for Printed Name P. int, Asbestos, and BMP notices 0 /DI 3 Date PO Box 30785 Savannah, Ga 31410 912 -233 -2001 OFFICE 912- 2343003 FAX dmorgan @collinsconstructioninc,com Fax To: Fax: Collins Construction Services, Inc. Dianne! City of Tybee Building permits From: Collins Construction/Dawn Morgan 912-472-5030 Phone: 912 - 786 -9539 Pages: 3 including cover Date: 10/14/2013 Re: #61$'" Street ( Urgent X( For Review ( Please Comment (Please Reply ( Please Recycle LEGAL NOHCE CITY OF TYBEE ISLAND VIO ATIO S O PERMIT NO. lTr WHEREAS, VIOLATIONS OF THE CODE OF THE CITY OF TYBEE ISLAND HAVE BEEN FOUND, NOTICE IS HEREBY GIVEN THAT ALL PERSONS CEASE, DESIST FROM, AND STOP WORK AT ONCE ON ANY CONSTRUCTION, ALTERATION, REPAIR, OR FURTHER USE OF THESE PREMISES KNOWN AS 4kb IBm STREET UNTIL THE VIOLATION HAS BEEN CORRECTED AND APPROVED BY THE CITY OF TYBEE ISLAND. ALL PERSONS ACTING CONTRARY TO THIS NOTICE OR REMOVING OR MUTILATING IT ARE LIABLE TO SUMMARY ARREST UNLESS SUCH ACTION IS AUTHORIZED BY THE CITY OF TYBEE ISLAND. DATE io/is'/ig PHONE 786 4573 INSPECTOR 1307