Loading...
HomeMy Public PortalAboutTENTH PL_10.pdfE 29DD -4M/90 ] JAMES B. JOHNSON, JR. R.O. Box 1577 Statesboro, Georgia 30459 (912) 764 -2582 Friday 6 December 2013 Planning and Zoning Board City of Tybee Island Post Office Box 2749 Tybee Island, Georgia 31328 Pine Tree Removal Permit 10 Tenth Place Tybee Island I am enclosing my $50.00 check in payment of the above tree removal permit, issued September 24, 2013, and good through March 24, 2014. Please hold the permit for me at your office, and I will pick it up from you next time I'm at Tybee during your business hours. Please call me in Statesboro, at the above number, if there are any questions or problems. Yours truly, Enclosure: USAA #3123 for $50.00 DATE ISSUED: 09 -24 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REMOVE 1 PINE TREE 10 TENTH PL J.B. & E.M. JOHNSON PO BOX 1577 STATESBORO GA 30459 -1577 J.B. & E.M. JOHNSON PO BOX 1577 STATESBORO GA 30459 -1577 P $ 50.00 4- 0006 -17 -004 $ 0.00 PERMIT #: 130596 TOTAL BALANCE DUE: $ 50.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 3_ ‘5".�e CITY OF TYBEE ISLAND 1\ —0 3 p (o — 1 .7 t L TREE REMOVAL PERMIT APPLICATION Telephone: (912) 786 -4573 • Fax: (912) 786 -9539 Address of Property 9/ 0 je z 1 Owner's Namelf -6S 4 ■-iQ9J ‘ I Applicant's Name .F— 3.407-1.1-- Owner's Address e0 , hox („c"-,7 ''j9 Applicant's Address - .n.a__ ' Applicant's Telephone .1�- <„y�,� , Owner' s Telephone 7 %� � qt,p - 7 69 _ a s g - REQUIREMENTS FOR TREE REMOVAL • Must maintain a density of 3 trees per 4,500 square feet. All trees with a 6" diameter at 4.5 feet above ground count toward the density count. • Significant trees may be removed only under certain circumstances and must be replaced inch - for -inch in like species with minimum 2 -inch diameter trees or be otherwise mitigated. (See reverse side for defmition.) • By accepting the Tree Removal Permit, the property owner and the applicant agree to comply with all requirements of the Tree Ordinance including mitigation requirements, planting specifications and tree survival requirements. APPLICATION Scaled plot plan showing location, size and species REQUIREMENTS of all trees on the lot which have a diameter of 6 inches or all proposed improvements, and property setbacks. proposed replacement trees. (If replacement is proposed for with the same information notated.) more at 4.5 feet above ground, all existing improvements, Mark all trees proposed for removal. Mark the planting location, size and species for all another parcel of land, a plot plan of that parcel is required Exp in the species Dof tree(s), the reason for removal, _ and the location ,(Xe_ � 1a._ ,�LCd 2K O S�� SX G�-emo MA_ � of the tree(s) 7� e-mi tx_ £' &w ��//_� -�� ) LW, , 6YL � ����ty`r1L7'rG1 ` - - 4 �S (,Ccu►�► a AVA Via . C toik .r 8 ,, ' to' -•' El ef)tfL, 01 V it to to- e, I have reviewed the Tybee Is and Land Development Code, Article 7, Tree Removal Regulations, and hereby agree to comply with the provisions thereof. I unders and a Tree Removal Permit Application may require 5 days to process. Owner or Applicant Signatures`' , i . �'_ _`.� j, Date q /2-0 / `ZQ / 3 Owner or Applicant Printe( . is e U4 • vim a/. c S tle City Official Date 7-1-e /--Cez--) /2-i/l/ Permit Fee Palms Up TOTAL 5o 50 Mitigation Required? ❑ YES NO MITIGATION PLAN J APPROVED n DENIED Jaci;),A_t) Wt q,a - (3 t°3