HomeMy Public PortalAboutTENTH PL_10.pdfE 29DD -4M/90 ]
JAMES B. JOHNSON, JR.
R.O. Box 1577
Statesboro, Georgia 30459
(912) 764 -2582
Friday
6 December 2013
Planning and Zoning Board
City of Tybee Island
Post Office Box 2749
Tybee Island, Georgia 31328
Pine Tree Removal Permit
10 Tenth Place
Tybee Island
I am enclosing my $50.00 check in payment of the above tree
removal permit, issued September 24, 2013, and good through
March 24, 2014.
Please hold the permit for me at your office, and I will
pick it up from you next time I'm at Tybee during your
business hours.
Please call me in Statesboro, at the above number, if there
are any questions or problems.
Yours truly,
Enclosure:
USAA #3123 for $50.00
DATE ISSUED: 09 -24 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REMOVE 1 PINE TREE
10 TENTH PL
J.B. & E.M. JOHNSON
PO BOX 1577
STATESBORO GA 30459 -1577
J.B. & E.M. JOHNSON
PO BOX 1577
STATESBORO GA 30459 -1577
P
$ 50.00
4- 0006 -17 -004
$ 0.00
PERMIT #: 130596
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
3_ ‘5".�e
CITY OF TYBEE ISLAND 1\ —0 3 p (o — 1 .7 t L
TREE REMOVAL PERMIT APPLICATION
Telephone: (912) 786 -4573 • Fax: (912) 786 -9539
Address of Property 9/ 0 je z 1
Owner's Namelf -6S 4 ■-iQ9J ‘ I
Applicant's Name .F— 3.407-1.1--
Owner's Address e0 , hox („c"-,7 ''j9
Applicant's Address - .n.a__
'
Applicant's Telephone .1�- <„y�,� ,
Owner' s Telephone 7 %� �
qt,p - 7 69 _ a s g - REQUIREMENTS FOR TREE REMOVAL
• Must maintain a density of 3 trees per 4,500 square feet. All trees with a 6" diameter at 4.5 feet above ground count
toward the density count.
• Significant trees may be removed only under certain circumstances and must be replaced inch - for -inch in like
species with minimum 2 -inch diameter trees or be otherwise mitigated. (See reverse side for defmition.)
• By accepting the Tree Removal Permit, the property owner and the applicant agree to comply with all requirements
of the Tree Ordinance including mitigation requirements, planting specifications and tree survival requirements.
APPLICATION
Scaled plot plan showing location, size and species
REQUIREMENTS
of all trees on the lot which have a diameter of 6 inches or
all proposed improvements, and property setbacks.
proposed replacement trees. (If replacement is proposed for
with the same information notated.)
more at 4.5 feet above ground, all existing improvements,
Mark all trees proposed for removal.
Mark the planting location, size and species for all
another parcel of land, a plot plan of that parcel is required
Exp in the species Dof tree(s), the reason for removal, _ and the location
,(Xe_ � 1a._ ,�LCd 2K O S�� SX G�-emo MA_
�
of the tree(s)
7� e-mi tx_ £' &w ��//_� -�� ) LW, ,
6YL � ����ty`r1L7'rG1
` - - 4 �S (,Ccu►�► a AVA Via . C toik .r
8
,,
'
to' -•'
El
ef)tfL,
01 V
it to to-
e,
I have reviewed the Tybee Is and Land Development Code, Article 7, Tree Removal Regulations, and hereby agree to
comply with the provisions thereof. I unders and a Tree Removal Permit Application may require 5 days to process.
Owner or Applicant Signatures`' , i . �'_ _`.� j, Date q /2-0 / `ZQ / 3
Owner or Applicant Printe( . is e U4 • vim a/. c S tle
City Official
Date
7-1-e /--Cez--)
/2-i/l/
Permit Fee
Palms Up
TOTAL 5o
50
Mitigation Required?
❑ YES NO
MITIGATION PLAN
J
APPROVED
n DENIED
Jaci;),A_t) Wt
q,a - (3
t°3