Loading...
HomeMy Public PortalAboutSECOND ST_501.pdfDATE ISSUED: 11 -21 -2013 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # CITY OF TYBEE ISLAND BUILDING PERMIT REROOF - SHINGLES 501 SECOND ST LEON &PATRICIA WILLS 404 DEERWOOD RD HINESVILLE GA 31313 912 - 876 -4435 MICHAEL'S ROOFING CO LLC PO BOX 267 MELDRIM GA 31318 P $ 91.00 4- 0004 -12 -004 PROJECT VALUATION $5,800.00 PERMIT #: 130736 TOTAL BALANCE DUE: $ 91.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 11/21/2013 10:32 9127486937 PAGE 01/02 City of Tybee Island, Georgia 912 -472 -5030 Fax 912 - 786 -9539 APPLICATION FOR BUILDING PERMIT Property Address: 0 i 'C,► r� PIN: -000 ❑ ingle Family Duplex ❑ Multi-Family units ❑ * Commercial unit(s) Ck eck all ghat apply -' O • at WI ❑ Discove y/Tearout ❑ Footprirt Changes ❑ _____ additional square feet he ted/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawir gs by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: _ Re_ - r n g.-3c +' I r� _OA d 11 r P C i�7 O c3Q.(l Lt.. tau. Ccn clp \e- Estimated Cost of Construction: $ I , T` (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction dranlings and /or a site plan may be required. /05 Year Built: 19 702 Listed on National Historic Rec ister or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be ,fisted on the State / National Register. With this designation, you may be eligible to take advantage of various tax Inc ?ntive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction_; On -site restroom facilities will be provided through . Construction debris will be disposed by, by means of _ I understand that I must comply with zoning, flood damage control, building, fire. shore protection and wegland ordinances FEMA re ulation d all a licable codes and regulations. 1 realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwai er Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by f his permitted construction. Date: it 1 L 1 1') Signature: Printed Name of Applicant: Note :. A permit normally takes 7 to 10 days to Arocess. Prooessjnq time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager FEES Permit Inspections Cap. Cost Rec, Water Tap Sewer Stub Eng, Fees Aid to Const, TOTAL Name `► Mailing Address Telephone Home: tr I Co- NT 48 Owner t...,M, . 1 6 Lekc )Dbd 9. K'% rx G s At �1i L esa • .3 I St s alt �fl~: $ 7 - Office: 4'i` Architect or Engineer Cell: Contractor � -,�. a Cc 1 Office: Ft �l g �- 64t 48 � — •. P.O. l cvc. itaS lA.fi..A r A elk, Cell: DJ. A - Co ❑ ingle Family Duplex ❑ Multi-Family units ❑ * Commercial unit(s) Ck eck all ghat apply -' O • at WI ❑ Discove y/Tearout ❑ Footprirt Changes ❑ _____ additional square feet he ted/cooled ❑ Demolition or Relocation ❑ Other * A commercial project requires 2 sets of sealed drawir gs by a design professional and construction by a contractor with the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval. Details of Project: _ Re_ - r n g.-3c +' I r� _OA d 11 r P C i�7 O c3Q.(l Lt.. tau. Ccn clp \e- Estimated Cost of Construction: $ I , T` (materials + labor + profit/overhead) If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon the scope of the work, two sets of construction dranlings and /or a site plan may be required. /05 Year Built: 19 702 Listed on National Historic Rec ister or located within a National Historic District? Y / N • Buildings older than 50 years may be eligible to be ,fisted on the State / National Register. With this designation, you may be eligible to take advantage of various tax Inc ?ntive programs while preserving the heritage of Tybee Island. • Also see the Tybee Island Land Development Code Article 14: Historic Preservation During construction_; On -site restroom facilities will be provided through . Construction debris will be disposed by, by means of _ I understand that I must comply with zoning, flood damage control, building, fire. shore protection and wegland ordinances FEMA re ulation d all a licable codes and regulations. 1 realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected as required by Article 16, Stormwai er Management. I accept responsibility for any corrective actions that may be necessary to restore drainage impaired by f his permitted construction. Date: it 1 L 1 1') Signature: Printed Name of Applicant: Note :. A permit normally takes 7 to 10 days to Arocess. Prooessjnq time for a historic structure may be longer. Approvals: Planning & Zoning Manager Building Official Water /Sewer Storm /Drainage City Manager FEES Permit Inspections Cap. Cost Rec, Water Tap Sewer Stub Eng, Fees Aid to Const, TOTAL 11/21/2013 10:32 9127486937 PAGE 02/02 LEAD- BASED PAINT RRP RULES, Ordinary renovation and maintenance activities cast create dust that contains lead. Contractors who perform renovation, repairs, and painting jobs in pre -1978 Iiousing and child- occupied facilities must, before beginning work, provide owners, tenants, and child-care facil ties with a copy of EPA's lead hazard information pamphlet Renovate Right: important Lead Hazard informatic, n for Families. Child Care Providers. and Schools. Contractors must document compliance with this v quirement. After April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based Paint and Asbestos Program (404) 363 -7026_ Projects must be done by a Certified t.ead Renovation Finn AND a Certified Renovator When disturbing lead -based painted or coatrcd surfaces or components more than 6 ft2 per interior room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size. * * * * k is * * * * * * * * * * * * 7F * AsbestoslEnvironment i Notification to Georgia EPD for Projects Involving Demolitions Wrecking, or Renovation The undersigned hereby acknowledges that the i= suance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten 110) day "Project Notifcaition for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almont without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 work ings days in advance even if no asbestos is present in the building, Further guidance for regulatory compli 3nce and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. * * ** * : * * * * * * * * * * * * * ** BMPs While BMP deficiencies are not necessarily the fa ult of the owner or his agent, BMPs are their responsibility. Two areas of deficiencies are in the most basic: and common BMPs; Co -- Construction Exit and Sdl — Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission; httplIvvww.gaswcc.org/docsifield_manual 4ed. pd` Problems with the Co is not limited to the Install;: tion, but to material. The stone will be a representation of 1.5 "%3.5" stone or larger. Type A sediment barriers have been installed wh Type C is required and shown on the permit drawings. Where two rows are called for they will be installlrsd with a separation that allows for the first one to fail (fall over) without impacting the second one. The corr plete assembly and installation must be compliant; steel or wood posts, post s +acing, Typ- • Signature for re eipt of Lead Paint, Asbestos, and , 3MP notices Date Printed Name Chatham County Board of Assessors: 2013 Property Record Card 4- 0004 -12 -004 Page 1 of 2 2013 Chatham County Board of Assessors Property Record Card 4- 0004 -12 -004 501 2ND ST TYBEE ISLAND APPRAISER mwthomas LAST INSP 02/13/2013 APPR ZONE 000008 LOT 149 WD 1 TYBEE WILLS PATRICIA & LEON 404 DEERWOOD RD HINESVILLE GA 31313 CAMA 168,300 81,700 200 250,200 ASMT 168,300 LAND 1 81,700 BLDG 1 200 OBXF 1 250,200 Cost - MS SALES BOOK / INS VI QU RSN PRICE PAGE 04 Jun 378A 207 WD I Q 270,000 2012 GRANTOR:PRIEGEL GAVIN GRANTEE:WILLS PATRICIA & LEON 01 Jun 203W 0377 WD 1 Q 125,000 1999 GRANTOR:EVANS SUSAN GRANTEE:PRISGEL GAVIN 01 Jun 203W 376 QC 1 U UN 1999 GRANTOR:EVANS RICHARD GRANTEE:EVANS SUSAN 31 Mar 192G 0110 WD 1 Q 87,000 1998 GRANTOR:ZITTURAUER PERRYA 111 GRANTEE:EVANS SUSAN W PERMITS TYPE DATE AMOUNT 11 -0122 RN 19 Dec 2011 Comp 250 030563 15 Nov 2004 Comp 1 COMMENTS: 06 Feb 2006 FOR SALE 05/14/99 FOR $139,000 PROP ADD CHG PER CITY OF TYBEE 2/6/06 PL 111111111111111 11M11111 111111 [Click for larger picture] SAG IS r��rrww.. Chatham County Tax Commissioner PmPeny Tax Statement CODES PROPERTY 0006 RESIDENTIAL USE UTA 0004 Tybee Island NBHD 020228.00 T228 TYBEE MILLER AV EXEMPTIONS HISTORY LAND IMPR TOTAL 2012 168,300 52,000 220,300 Cama 2011 224,400 45,000 269,400 Cama 2010 259,200 50,000 309,200 Cama 2009 259,000 93,500 352,500 Over 2008 259,000 93,500 352,500 Cama 2007 369,000 54,500 423,500 Cama 2006 292,000 95,000 387,000 Cama 2005 168,000 95,000 263,000 Cama 2004 124,500 79,500 204,000 Cama 2003 112,000 75,000 187,000 Cama 2002 112,000 57,500 169,500 Cama 2001 74,500 72,000 146,500 Cama 2000 46,500 72,000 118,500 Cama 1999 29,500 72,000 101,500 Cama 1998 29,500 70,500 100,000 Cama 1997 29,500 66,000 95,500 Cama 1996 13,500 61,570 75,070 Cama 1995 13,500 68,450 81,950 Cama 1994 13,500 57,100 70,600 Cama 1993 13,500 42,990 56,490 Over 1992 13,500 42,990 56,490 Over EXTRA FEATURES ID# BLDG # SYSTEM DESC DIM 1 DIM 2 UNITS OL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE 137343 84815 MISC BUILD. LOW 8 8 64.00 A 11.95 765 1985 1985 2R 153 200 LAND ID# USE DESC FRONT DEPTH UNITS /TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 109056 2 -4 FAMILY 0 0 6,600.00 -SF 34.00 R2 168300 11- feiR idaert, �u� � %� L cJ 0l7 http: // boa. chathamcounty. org/ DesktopModules /ChathamCountyBoardofAssessors /Prope... 11/21/2013 Chatham County Board of Assessors: 2013 Property Record Card 4- 0004 -12 -004 Page 2 of 2 2013 Chatham County Board of Assessors Property Record Card 4- 0004 -12 -004 501 2ND ST TYBEE ISLAND BUILDING SECTION 84815 -1 -2013 CONSTRUCTION TYPE RCN AYB EYB DEP TYPE Residential 109,065 1972 1990 MS PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL 28.00 0.00 0.00 0.00 28.00 78,527 81,700 2 52' [Click for larger picture] DUPLEX 501/503 SECTION TYPE AREA TYPE FRAME STYLE QUALITY CONDITION # UNITS # OF BEDS / BATHS 1 - Main 1404 5 - Duplex 2 - Masonry Veneer 1 - One Story 3.00 3.00 0 4 /2.00 COMPONENTS R1 133 Veneer, Masonry R2 208 Composition Shingle R3 352 Heat Pump R4 402 Automatic Floor Cover Allowance R6 601 Plumbing Fixtures ( #) R6 602 Plumbing Rough -ins ( #) R6 621 Slab on Grade (% or SF) Units % QUAL 100.00 100.00 100.00 10.00 2.00 100.00 http: //boa.chathamcounty. org/ DesktopModules /ChathamCountyBoardofAssessors /Prope... 11/21/2013