HomeMy Public PortalAbout12-0051 LiDATE ISSUED: 02 -2 -2012
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
DEMOLITION - SF HOME
/ 1 /'JRYLog A-v
OWNER NAME KATHRYN LI
ADDRESS 227 WALKBRIDGE WAY
CITY, ST, ZIP CHAPIN SC 29036
PHONE NUMBER
CONTRACTOR NAME B & B DEMOLITION AND
ADDRESS BOBBY L ADAMS
CITY STATE ZIP SAVANNAH GA 31405
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 250.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $5,800.00
PERMIT #: 120051
TOTAL BALANCE DUE: $ 250.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Februady 13, 2012
Ms. Dialie Otto
Administrative Assistant
City of *bee Island
Building' and zoning
P.O. Boil 2749
Tybee I4and, Georgia 31328 -2749
fn WE
!SO FEB 1 3 2012
BY-
Dear Dihne;
I have made a site visit to 15 Wilson Street in regards to the request fort lleiililitiofl.
Please ptbceed with the request as the building cannot be moved and vbdld 'fie
impossi$le to restore or rehabilitate.
Sincerelir,
,....a._
Cullen (*cambers
Historic3Preservation Advisor
Tybee Island Historic Preservation Commission
Va-oo SI
Location:
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
NAME
ADDRESS
PIN #
TELEP
Owner
\\-, ,
cv,o, -�, , SC 29 0
�
,Q' - c\Ltp ° rl
Architect
or Engineer
%a\ q
Building
Contractor
e „a`
tO2y %-Q-, :
,,., 1� , C. t. -‘,%14.�
etkrt -tas ° _<o %oo
ate ` t`.°or`��
(Check all that apply)
❑ Repair
❑ Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
Details of Project: `Tp
❑ Residential
❑ Single Family
Cl Duplex
❑ Multi - Family
❑ Commercial
•� hg� mac\
0. C�Egs� -
n Footprint Changes
❑ Discovery
[emolition
\20-ks_ -ropes
Estimated Cost of Construction: $
Construction Type (Enter appropriate number)
(1) Wood Frame (4) Masonry (6) Other (please specify)
(2) Wood & Masonry (5) Steel & Masonry
(3) Brick Veneer
Proposed use: c1 Ord..
Remarks: S.kxlae,,,e a[.
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following information based on the construction drawings and site plan:
# Units N3t \pt # Bedrooms %a\ Pc # Bathrooms 1:a, \{-'
Lot Area ti \A Living space (total sq. ft.) t3\Pr
# Off - street parking spaces to \A
Trees located & listed on site plan Vs-Vt
Access:
Driveway u.\ pc (ft.) With culvert? 1.1 \p, With swale? t�1�vt
Setbacks: Front \pt Rear ma\A
Sides (L) apt (R) _��
# Stories t i\Ft Height wirA Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through title.
On -site waste and debris containers will be provided by
Construction debris will be disposed by c_z_A ccAoc- by means of \CLx cg-. \\
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: \ _ \0 -\`Z, Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and/or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
LEAD -BASED PAINT
Adapted from http: //www.epa.gov /lead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre- renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child - occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
r
IF YOU'RE NOT
I EAD SASE CEAMI,IED
.DISTURBING
JUST SIX
SQUARE FEET
-COULD COST YOU
.BIG TIME.
Signature
Printed Name
Date
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Printed Name
•
Date
Office Use Only:
Project Address:
Permit Number:
B &'B Demolition and Contractors Inc.
1024 Milton Street
Savannah, Georgia 31405
Phone: 912 -655 -6100
Fax: 912- 231 -9183
To: Kathryn Li
Ref: 15 Wilson Street
January 14, 2012
Contract
This is an agreement between B & B Demolition and Contractors Inc. and Kathryn Li for
the demolition of 15 Wilson Street Tybee Island, GA.
1. The owner of the property is responsible for the asbestos inspection and if any
asbestos is found it is the responsibility of the owner to bear the cost of abatement.
A. The owner of the property will pay $75.00 for the abatement inspections.
2. B& B Demolition and Contractors Inc. will pull the permit.
3. B & B Demolition and Contractors Inc. is responsible for removing the debris and
taking it it to a licensed disposal facility.
4. B & B Demolition and Contractors Inc. is responsible for notifying all interested
parties.
5. B & B demolition and Contractors Inc will ensure that the property is left in a clean
and orderly condition.
6. The final inspection by Tybee Island will be the determining factor for payment.
7. Total payment will be made within seven days after the job is completed.
8. The job will start 3 days after the permit is granted and will be completed within 30
days time.
9. B & B Demolition and Contractors Inc. reserves the rights to salvage within the debris.
10. The cost is $5,875.00. This includes abatement inspection and demolition of the
property.
Kat IF n Li
Property Owner
obby L. Adams
President
IN Result Report
P 1
01/27/2012 09:17
Serial No. CM35228060004
TC: 312306
Destination
Start Time
Time
Prints
Result
Note
7866538
01 -27 09:17
00:00:38
001 /001
OK
Note
MIX: Mixed Origginal_TX11CALL:BManual1TX, Original Size 9FUID:FForward. PC: PC -Fax.
RLV: Double-sided MBX: ConfiiddentDirection, , : BulletiinC1SIP rSIPnFax.FIPADR:FIP AAddress Fax.
I -FAX: Internet Fax
Result OK: Communication OK, S -OK: Stop Communication, PW -OFF: Power Switch OFF,
TEL: RX from TEL, NG: Other Error, Cont: Continue, No Ans: No Answer,
Refuse: Receipt Refused, Busy: Busy, M- Full:Memory Full,
LOUR:Receiving length Over, POVER:Receiving page Over, FIL:File Error,
DC:Decode Error, MDN:MDN Response Error, DSN:DSN Response Error.
]>ate:
City of Tybee Island
BUILDING AND ZONING
P_(7. Boa 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749
(912) 786 -4573 — FAX (912) 786 -9539
www.cityoftybee _ org
FAX TRANSMITTAL SHEET
Number of-Pages Including Cover Sheet: 1
To: Cullen Chambers
Company Namc: Tybee Island Historic Review Commission
Fax Number: 786 -6538
From: Dianne K_ Otto
Title: Administrative Assistant
Phone Number: 786 -4573 extension 114
Fax Number: 786 -9539
NOTICE OF APPLICATION FOR DEMOLITION
Date of Application
Name of Applicant
Phone Number
Location of Structure
/ Z 5 7/..*2
! S GI >i�.sr�wi y
Date:
City of Tybee Island
BUILDING AND ZONING
P.O. Box 2749 — 403 Butler Avenue, Tybee Island, Georgia 31328 -2749
(912) 786 -4573 — FAX (912) 786 -9539
www.cityoftybee.org
FAX TRANSMITTAL SHEET
Number of Pages Including Cover Sheet: 1
To:
Company Name:
Fax Number:
From:
Cullen Chambers
Tybee Island Historic Review Commission
786 -6538
Dianne K. Otto
Title: Administrative Assistant
Phone Number: 786 -4573 extension 114
Fax Number: 786 -9539
NOTICE OF APPLICATION FOR DEMOLITION
Date of Application
Name of Applicant
Phone Number
Location of Structure
/3 &3 b1a`,ra,J 2s 4k,
lv /DD �i2l�t
LS"- GU//sod s r 7L