HomeMy Public PortalAboutBUTLER AV_601 #28( iv 1 cii5ipmoe...
City of Tybee Island Planning & Zoning Dept. �i L. =t
Inspection Report Rate
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 INTERNATIONAL
Phone 912.472.5032 • Fax 912.786.9539 2 ; `.�2 ft
nlO _ CODECDUNCIL
-'. /3 ,J1+1 /MBER
Permit No. /3 - D� gc Date Requested 06//6 ./7 5
' /
Owner's Name C24IC'N06K Date Needed .6/45//3
Gen. Contractor S3:092 t' (TeICAt Subcontractor
Contact Information IeSL/t Sc <S l iN $
Project Address
Scope of Work
01 - 5f
eebf-r-1
Inspector Date of Inspection
Inspection Pass p Fai • Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
DATE ISSUED: 05 -7 -2013
WORK DESCRIPTION
CITY OF TYBEE ISLAND
BUILDING PERMIT
R &R NON GROUNDED OUTLETS
WORK LOCATION 601 BUTLER 28
OWNER NAME BOB WARNOCK
ADDRESS 601 BUTLER
CITY, ST, ZIP TYBEE ISLAND GA 31328
PHONE NUMBER
CONTRACTOR NAME 5 STAR ELECTRICAL CONTRACTORS
ADDRESS PO BOX 15722
CITY STATE ZIP SAVANNAH GA 31416
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 50.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $ 950.00
PERMIT #: 130285
TOTAL BALANCE DUE: $ 50.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, tire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
U
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
/.5- o.)-/C
CITY OF TYBEE ISLAND
BUILDING & ZONING DEPARTMENT
P.O. Box 2749, Tybee Island, GA 31328
Phone (912) 786 -4573 • Fax (912) 786 -9539
ELECTRICAL PERMIT APPLICATION & TEMPORARY SERVICE AFFIDAVIT
Date 6- 7 -,R0 /3
Location of work (street address)
Contractor
(2/ 43v71-%4^
Address of Contractor
New Work
X-
(Jho`f" a.&
g36 3(3 3
Telephone 5-/m /
Replacement
Property Owner /11C ;Pt 1/2)s4
:
S- P -26/3
Date work will be ready for inspection, if known
Estimated cost of constructio
9,50
Telephone 715 - 7?/ - 3 Y37
Permit Number
ALL wiring, service
included, must be
COPPER. NO
aluminum allowed.
Means shall be
provided to
disconnect all
conductors from the
service - entrance
conductors. NEC 230.70
APPLICATION FOR TEMPORARY SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
1. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy.
4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this
po icy may resul in disconnection of the electrical service until all violations and deficiencies are corrected.
►_
• ,.r 5.1' 2 -20/3
Owner /0ftractor Signature Date
,Ces/ey E. Besse'M 5
Owner /Contractor Printed Name
APPROVAL
Building Official
1K---_),tzvev c463
12 t.2G -k r: cak
Fee
So
Date --) - 3
•
A/C Unit and Heat Pump
Attic Ventilation Fan
Bell Transmitter - low voltage
Border /Outline Lighting
Building Saw
Exit Lights - life safety
Heat Pump
Meter Box
Motor(s): hp
o2
Outlets - 110 volts circuit
Parking Lot Lights
/Q
_
Pool Lights - grounding
Range - commercial
Permit Number
ALL wiring, service
included, must be
COPPER. NO
aluminum allowed.
Means shall be
provided to
disconnect all
conductors from the
service - entrance
conductors. NEC 230.70
APPLICATION FOR TEMPORARY SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
1. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy.
4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this
po icy may resul in disconnection of the electrical service until all violations and deficiencies are corrected.
►_
• ,.r 5.1' 2 -20/3
Owner /0ftractor Signature Date
,Ces/ey E. Besse'M 5
Owner /Contractor Printed Name
APPROVAL
Building Official
1K---_),tzvev c463
12 t.2G -k r: cak
Fee
So
Date --) - 3
•
Range Hood - commercial
Service: amps
Sign Circuit - wattage
Smoke Detector - low voltage
Spa or Tub - grounding
Special Outlet
Swimming Pool - grounding
Water Heater
Welder - 220 volts circuit
Well Pump - grounding
X -ray
/Q
Other Fgr/aye &bon & u]t.
fr lDK t�^yrt1 0.0(011 62cOML'
Permit Number
ALL wiring, service
included, must be
COPPER. NO
aluminum allowed.
Means shall be
provided to
disconnect all
conductors from the
service - entrance
conductors. NEC 230.70
APPLICATION FOR TEMPORARY SERVICE REQUEST
In requesting temporary electrical service, the undersigned understands and agrees:
1. Connection of temporary electrical service does not remove the requirement to comply with all State of
Georgia minimum construction codes.
2. Temporary electrical power is intended for completion of the construction process and testing equipment
installed within the structure.
3. Issuing approval for temporary power connection does not constitute approval to occupy the structure.
A Certificate of Occupancy must be issued by the City of Tybee Island prior to any occupancy.
4. The owner and contractor are hereby held responsible for any violations of this policy. A violation of this
po icy may resul in disconnection of the electrical service until all violations and deficiencies are corrected.
►_
• ,.r 5.1' 2 -20/3
Owner /0ftractor Signature Date
,Ces/ey E. Besse'M 5
Owner /Contractor Printed Name
APPROVAL
Building Official
1K---_),tzvev c463
12 t.2G -k r: cak
Fee
So
Date --) - 3
•