Loading...
HomeMy Public PortalAbout2019-03 Authorizing to issue a work order to the Corradino Group for the Signalization ProjectRESOLUTION NO. 2OI9-3 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, AUTHORIZING THE VILLAGE MANAGER TO ISSUE A \ryORI( ORDER TO THE CORRADINO GROUP, INC. FOR AS-BUILT PLANS FOR THE VILLAGE'S TRAFFIC SIGNALIZATION PROJECT; AND PROVIDING FOR AN EFFECTIVE DATE WHEREAS, the Village of Key Biscayne ("Village") issued Request for Qualifications No. 2016-02-09 ("RFQ") for continuing professional engineering services; and WHEREAS, pursuant to the RFQ, the Village Council selected the Conadino Group, Inc. (the 'oConsultant") as one of the consultants to provide continuing professional services relating to general civil engineering, transportation planning and engineering, environmental engineering, and landscape architecture, and authorized the Village Manager to execute an agreement with the Consultant; and WHEREAS, Consultant has provided a proposal, attached as Exhibit "A," (the "Proposal") to provide signalization analysis and as-built plans for the Village's traffic signalization project (the "Project"); and WHEREAS, the Village Council desires to authorize the Village Manager to issue a work order for the Project consistent with the Proposal and the professional services agreement entered into between the Village and Consultant; and WHEREAS, the Village Council finds that this Resolution is in the best interest and welfare of the residents of the Village. NO\il, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA AS FOLLOWS: Section 1. Recitals. That each of the above-stated recitals are hereby adopted, confirmed, and incorporated herein. Section 2. Authorization. That the Village Manager is hereby authorized to issue a work order to Consultant for the Project that is consistent with the Proposal in an amount not to exceed $42,000.00. Section 3. Effective Date. That this Resolution shall be effective immediately upon adoption. PASSED and ADOPTED this 15th day of January, 2019. W. DAVEY, MAYOR MEDINA, VILLAGE CLERK APPROVED AS TO FORM AND LEGAL S A VILLAGE ATTORNEY 2 oz c) u. M O U EXHIBIT ''A'' THE CORRADINO GROUP lNc. ENGINEERS , PLANNERS . PROGRAM MANAGERS . ENVIRONMENTALSCIENTI'TS December 4,2018 Charles R. Press Police Chief Village of Key Biscayne Public Works Department 88 West Mclntyre Street Key Biscayne, FL 33149 Re: Crandon Boulevard Plans for Signalizatlon Upgrades Dear Chief Press, I. GENERAL The general objective for the Consultant is to províde all project management and professional engineering services required for the design and preparation of Signafization Upgrade Plans which consist of the following (refer to Exhibit t): 1. Ocean Drive (Asset 3545) - Four (4) new VDCs proposed to replace the 4 existing ones and one blueTOAD to be added to the upright for the mast arm on the SE cornel 2. W. Mclntyre (Asset 3834) a, Mast arm on the NE corner - One (1) new VDC is proposed (structural analysis required) b. Mast arm on SW corner - Two (2) VDCs to replace the 2 existing (Econolite will revise drawings from the currently 3 proposed to only 2)c, Mast arm on SE corner - One (1) proposed VDC replacing the existing one 3. Sonesta Drive (Asset 6316) - Four (a) VDCs proposed to replace the 4 existing ones 4. Key Colony (Asset 4578)- The exiting Wavetronix will remain, only a controller will be installed 5. West Wood Drive (Asset 5038)- Four (4) VDCs proposed to replace the 4 existing ones Elements of work shall include Signafization analysis, Signalization Plans and Structural Analysis. Permitting with Miami-Dade County, Department of Transportation and Public Works Traffic Signals and Signs Division is not included as part of this contract and will be cönducted by Econolite. All plans and design documents are to be prepared with Standard English values iñ accordance with all applicable engineering manuals and guidelines. The Work detailed in this Proposal can be completed within ten (10) weeks from your notice to proceed (please refer to Section lll for a submittal schedule) for a total fee of $41 ,3ß7.20 SCOPE OF WORK Prolect Activitv 3: General Task No. 3.6 Prime Gonsultant Project Manager Meetings lncludes all efforts required for Project Manager coordination meetings and field review. 40-5i NW97 lll¡\Vl:Ntilì StJlll. :],(lft ,MlAMl. lrt- 33 178 il jt 80(| 337 i.i5l 30.i,51).t.{)715 liAX 305.-s94,0755 www,coRRAt)tNO.('i)kt Proleôt Actlvltv 18: Structures -Miscellaneous fRElì Conduct structural analysis (By Botas Engineering, lnc.) of the existing mast arm at the NE corner of W, Mclntyre Street with Crandon Boulevard with the addition of the proposed Econolite Video Camera. As no as-builts are available, it will be considered that the existing mast arm complies with the Miami Dade County mast arm standards. Prolect Activltv 2{: Slsnalizatlon Analvsls Task No. 21.5 Reference and Master Design File lncludes all efforts required per intersection for establishing the signal master design file Task No. 21.10 Quantities lncludes all work required to determine the quantitíes for each signalized intersection Task No. 21.11 Cost Estimate lncludes preparing an Engineers Estimate and updating as necessary Task No. 21.14 Field Revlews lncludes I field review for 5 intersections, includes travel time Proleot Activitv 22: Slsnalization Plans Task No. 22.1 Key Sheet lncludes tíme to develop key sheet Task No, 22.3 Tabulation of Quantities lncludes time to place pay item numbers, descriptions, quantities and totals Task No. 22.4 General Notes/Pay ltem Notes lncludes time to place provide general notes and pay item notes Task No. 22.5Plan Sheet lncludes all efforts required to create the signalization sheets. Task No. 22.9 Special Details lncludes time to create special details II. ADDITIONALSERVICES Additional Services, Permitting, Permitting Fees and Post Design Services are not part of this contract. III. SCHEDULE OF WORK - TIME OF PERFORIVIANCE Consultant shall submit the Deliverables and perform the Work as depicted in the tables below be added as SCHEDULE OF DELIVERABLES Task, Sub.task, or Activity lD # Major Task, Sub-Task, Activity, or Deliverable Duration (specify weeks or calendar davsl Delivery Datet (cumulative weeks or calendar days) 1 Phase I Submittal-90% Plans 6 weeks**NTP + 6 weeks 2 Phase 2 Submittal - Final Plans & FinalPermitting 4 weeks***NTP + 10 weeks (pending on timely response from MDC Traffic & Signals Division) ,14381 Key Bisc¡yne\Signaliza(ion\TWO l0_CrÐdon Boulevûd_Signal Upgrades_Rev2-Fínol,docx RE1 Structural Analvsis/Reoort I week NTP +,week * An updated schedule, indicating actualdelivery dateìC, bas to the Village upon rcceipt of the NTP and will be submitted to the Village of Key Biscayne.**lncludes time for coordination with MiamLDade County Public Works Traffic Signats and Sþns Division*l*Muy vary based on review delays from Village as well as by the Miami-Dade County Public Works Depadme¡it fafi?c Slgna/s and Srþns Division, . IV, SUB.CONSULTANTS The below listed sub-consultants will assist in the performance of the work. Sub-Consultant Name Specialty or Expertise Botas Engineering, lnc.Structures V GOMPENSATION consultant shall perform the work detailed in this proposal for a Total fee of $4j,367.20. The Village shall not be liable for any fee, cost, expense or reimbursable expense or other compensation beyond this amount. Said fee shall be negotiated with the Village as Additional Services (refer to Section ll). *Nofe;should match the and/or VI. PROJECT MANAGER CONSULTANT'S Project Manager for this Work Order assignment will be Cecilia Villoria, p.E. Submitted by Reviewed and approval in concept recommended by; Joseph M, Corradino, AICP President The Corradino Group, lnc. Charles R. Press Police Chief Village of Key Biscayne RYOFCöMP Task o¡ Actfvlty tD#_I[glo.de!k Name and/or Activíty Description Fes Amount Fse 8¿sis 1 Phase I Submittal- 90% Ptans 30,814.56 Lump Sum 2 FinalSubmitta - 100% Contract Plans i 7.703.64 Lump Sum ;38.ı18.20 Lump Sum REI Structures i upon completion)$2,849.00 Lump Sum TOTAL 41,367.20 J:\4r8¡ Key Bisc¡yre\Signd¡z¡t¡on\TWO I O* Crmdon Boulevud_signol Upgrodcs_Rov 2-Find doø