Loading...
HomeMy Public PortalAbout11-0446 MeyerCity of „Jee Island • Community Develor. .ent Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Irk NMI* Val 1:11 INTERNATIONAL CODE COUNCIL MEMBER Permit No. S Date Requested Date Needed Gen. Contractor / Subcontractor Contact Information L ;/- <-4b4-/ Owner's Name /1/2 Project Address -7// Scope of Work Inspector Inspection ,- - Pass ,A;(74, Date of Inspection/ Fail • Fee Inspection Pass El Fail Fee Inspection Pass Fail El Fee Inspection Pass Fail 0 Fee FROM ..)7p fa M c ELROY METAL CORPORATE OFFICE • P.O. BOX 1148 • SHREVEPORT, LA 71163-1148 • (318) 747-8000 • FAX (318) 747 -8029 051-w) (TUR >AUG 9 2011 0:40/ST. 9 :47 /No. 9305296179 P 1 'TECH I I CAi BULLETIN Issue Date : March 2, 2000 No. 01- 112 -00 Air and Water Infiltration Meridian 26 Ga. On January 27, 2000, McElroy Metal, Inc. tested its Meridian Panel for air leakage and water penetration. TEST METHODS: Air Leakage: ASTM E1680 -95, "Rate of Air Leakage Through Exterior Metal Roof Panel Systems" Water Penetration: ASTM E1646 -95, "Water Penetration of Exterior Metal Roof Panel Systems by Uniform Static Air Pressure Difference" TEST SPECIMEN: McElroy Metal, Inc. 26 Ga. 16 in. wide Meridian Roof Panel over #30 underlayment with 6 inch overlaps. Panels were attached to 5/8" plywood using #10 -12 Pancake Head woodgrip fasteners at 21 inches on center. All plywood butt joints were sealed with silicone sealant. TEST RESULTS: *Results are extrapolated to different panel widths. Test Report No. : T124 -00 Dated : February 7, 2000 MIDWEST DIVISION - CLINTON, IL NORTHEAST DIVISION • WINCHESTER. VA WEST TEXAS DIVISION • MERKEL, TX CORPORATE OFFICE SHREVEPORT, LOUISIANA SOUTHEAST DIVISION • PEACHTREE CITY. GA SOUTHWEST DIVISION • BOSSIER CITY, LA GREAT LAKES DIVISION • MARSHALL, MI WESTERN DIVISION • ADELANTO, CA BLUEGRASS DIVISION • LEWISPORT, KY A 5 on fo T Air Infiltration Water Penetration Specimen Static Pressure Differential (psf) Air Infiltration rate (cfm /lf) Air Infiltration rate (cfm /sf) Static Pressure Differential (psf) Rate (gal. /hr /sf) Test Duration (min) Water Infiltration *Meridian 12" 26 Ga. +./ -6.24 0.002 0.002 12.00 5 15 None *Meridian 12" 26 Ga. +/ -1,57 0.002 0.002 Meridian 16" 26 Ga. +/ -6.24 0.002 0.001 12.00 5 15 None Meridian 16" 26 Ga. +/ -1.57 0.002 0.001 *Meridian 18" 26 Ga. +1 -6.24 0.002 0.001 12.00 5 15 None *Meridian 18" 26 Ga. +1 -1.57 0.002 0.001 Test Report No. : T124 -00 Dated : February 7, 2000 MIDWEST DIVISION - CLINTON, IL NORTHEAST DIVISION • WINCHESTER. VA WEST TEXAS DIVISION • MERKEL, TX CORPORATE OFFICE SHREVEPORT, LOUISIANA SOUTHEAST DIVISION • PEACHTREE CITY. GA SOUTHWEST DIVISION • BOSSIER CITY, LA GREAT LAKES DIVISION • MARSHALL, MI WESTERN DIVISION • ADELANTO, CA BLUEGRASS DIVISION • LEWISPORT, KY A 5 on fo T FROM (TUE)AUG 9 2011 10: 01 /ST. 10: 00 /No. 9305296180 P 2 McELROY METAL, INC. KYNAR 500' COATING SYSTEM LIMITED WARRANTY APPLICABLE PRODUCTS: MCELROY THRU- FASTENED WALL AND ROOF PANELS AND MERIDIAN McElroy Metal, Ine. ( "McElroy ") warrants to the purchaser of McElroy panels using Galvalume, galvanized G90 or aluminum substrates with standard Kynar 500' or Hylar 5000' coating systems that when used in exterior applications the coating system will meet the following standards. For warranty terms on special and/or non standard colors, please contact a McElroy representative. . For a period of 40 years from the date of shipment, the coating system will not crack, check or peel (lose adhesion). 2. For a period of 30 years from the date of shipment, the coating system will not chalk in excess of numerical rating nine (9) for sidewall applications and numerical rating eight (8) for roof applications when measured in accordance with ASTM D- 4214 -98 procedures. 3. For a period of 30 years from the date of shipment, the coating system will not change color (fade) more than four (4) OE Hunter units for sidewall applications and five (5) tE Hunter units for roof applications when tested in accordance with ASTM D- 2244-02 method D659 procedures. Color change shall be measured on an exposed painted surface that has been cleaned of surface soils and chalk, and the corresponding values measured on the original or unexposed surface. It is understood that fading or color changes may not be uniform, if the surfaces are not equally exposed to the sun and elements. Orange, Casco Orange, Safety Orange and Britc Rcd arc warranted under the same testing methods and limitations as indicated on this warranty, but have special numerical ratings as indicated below: I. For a period of 20 years from the date of shipment, the coating system will not crack, check or peel (lose adhesion). 2. For a period of 10 years from the date of shipment, the coating system will not chalk in excess of numerical rating eight (8) for sidewall and roof applications. 3. For a period of 10 years from the date of shipment, the coating system will not change color (fade) more than five (5) dE Hunter units for sidewall and roof applications. McElroy Metal also warrants that for a period of fifteen (15) years, panels coated With Kynar 500' or Hylar 5000', when installed in vertical or non vertical application (min 3:12 slope) will not exhibit accumulation of red rust greater than '/4" at any one interior point of the panel. This provision shall not apply to any accumulation of red rust which occurs within '14" of breaks of discontinuities in the surface, such as panel edges (factory or field cut) or metal penetrations (such as fasteners) at any time after application of pre- treatment and paint systems. Subject to the conditions, limitations and exclusions set forth below. If any panels fail to comply with the warranty specifications set forth above, McElroy agrees to repair, repaint or replace such panels, at its sole cost and expense. McElroy shall have the sole option of repairing, repainting or replacing the panels and may contract for such work. Any repaired, repainted or replaced panel shall be covered by this limited warranty, but only for the remainder of the period applicable to the panel originally purchased. McElroy's liability under this warranty shall be limited to the cost of labor and materials reasonably necessary to repair, repaint or replace the panels that do not meet the above specifications. All claims filed under this warranty must be presented in writing by the purchaser to McElroy during the warranty period and not more than 30 days after discovery by the purchaser of the problem for which the claim is made. All claims must reference McElroy's invoice number and be either hand delivered or sent by registered or certified mail to McElroy at 1500 Hamilton Road, Bossier City, Louisiana 71111. THIS WARRANTY SHALL BE SUBJECT TO THE FOLLOWING CONDITIONS, LIMITATIONS AND EXCLUSIONS: A. This warranty covers only panels erected in the continental United States, Alaska and Canada, which are exposed to normal weather and atmospheric conditions. B. This warranty is for the benefit of the original purchaser only and is not transferable or assignable. C. In determining whether the panel meets the specifications set forth above, color change shall be measured on an exposed painted surface that has been cleaned of surface soils and chalk per ASTM D 2244 -02 procedures. McElroy does not warrant that color changes will be uniform. D. This warranty does not apply to defects or failures which arise out of any of the following: (1) the formation of rust on the panel edges; FROM (TUE)AUG 0 2011 10:00 /ST. 10:00 /No. a3052001a0 P 1 McELROY METAL CORPORATE OFFICE • P.O. BOX 1148 • SHREVEPORT, LA 71163-1148 • (318) 747 -8000 • FAX (318) 747 -8029 TECHHICAL aULLEIIH Issue Date : June 1, 2006 No. 03- 263 -06 UL Construction #529 Meridian UL580 Class 90 1. Metal Roof Deck Panels` - No. 29MSG min coated steel. Max panel width 24 in. rib height nominal 1 in Panels continuous over two or more spans. A bead of sealant may be used at panel end laps. McElroy Metal Mill, Inc. "Meridian" 2. Fasteners — (Screws) - For panel attachment to wood deck (Item 3) fasteners to be No. 10 x 1 in. long No. 2 Phillips Pancake head type A. Fastener spacing to be 12 in. OC with fasteners installed through prepunched slots in fastener flange of panel. For attachment of plywood deck (Item 3) to joists (Item 5), fasteners to be min No. 6 by 1- 7/8 in. bugle head screw or annular ring -shank nails. Spacing to be 6 in. OC at plywood edges and 12 in. OC at intermediate supports. When light gauge structural steel joists are used, fasteners to be No. 12 by 1 -5/8 in. long with a Phillips head. 3. Substructure — (Plywood) — Plywood decking to be a nom 5/8 in. thick, exposure sheathing span C -D, 40/20 plywood. All butt joints to be sealed against leakage by using tape and /or caulk or with one -part urethane sealant. 4. Moisture Barrier — (Optional) — Any suitable membrane to protect substructure (Item 3). 5. Joists — Joists spaced at 2 ft., 0 in. OC may be one of the following: A. Nom 2 by 6 in. wood joists No. 2 or better. B. Nom 2 by 4 in. wood when used on top cord of a wood truss, No. 2 or better. C. Light gauge structural steel framing with the member against the plywood to be a min. No. 22 MSG coated steel. Refer to General Information, Roof Deck Construction, (Roofing Materials and Systems Directory) for items not evaluated. 'Bearing the UL Classification Marking MIDWEST DIVISION • CLINTON, IL NORTHEAST DIVISION • WINCHESTER. VA WEST TEXAS DIVISION • MERKEL, TX 0 2' -0" Max 0 CORPORATE OFFICE SHREVEPORT, LOUISIANA SOUTHEAST DIVISION • PEACHTREE CITY. GA SOUTHWEST DIVISION • BOSSIER CITY, LA GREAT LAKES DIVISION • MARSHALL, MI D WESTERN DIVISION • ADELANTO, CA BLUEGRASS DIVISION • LEWISPORT. KY FROM <TUE)AUG 9 2011 10: 01/ST. 10: 00 /No. 9305296180 P 3 (2) acts of God, falling objects, external forces, explosions, fire, riots, civil commotions, acts of war, radiation, harmful gases, harmful fumes, salt atmosphere or standing water due to failure to provide adequate slope and drainage; (3) failure to properly insulate panels from copper, lead, and other dissimilar metals, contact with damp insulation, debris, soil, vegetation, animal waste, decaying materials, wet absorptive materials, concrete or other foreign or corrosive materials from contact with or in close proximity to the panel; (4) use in manner not intended or improper storage or handling, including but not limited to damage from condensation on the panels attributable to improper handling; or (5) failure of the metal substrate; (6) minute fracturing which may occur in proper fabrication of the building parts; (7) if panels are applied without protection over lumber which has been treated with preservatives or fire resistant materials, regardless whether such treatments arc present with or without the knowledge of the buyer, the owner or any other party. This exclusion shall include, but is not limited to, lumber which has been treated with pentachlorophenol, chromated copperarsenated salts, creosote, Iluocltrome arsenate phenol, alkaline copper quaternary, or any similar treatment for fire and rot resistance. Protection of lumber as provided for in the exclusion shall be defined as any barrier that prevents the transfer of moisture and salts between the treated lumber and pre - finished metal panel; (8) abnormal corrosive atmospheric conditions. This exclusion includes, but is not limited to, contamination from external sources such as manufactured chemicals and salt spray, and internal contamination created by improper ventilation (design or operational defects) or improper housekeeping; (9) discontinuities in the paint film as a result of damage during installation or use of the building e.g. scratches; (10) design flaws that would result in moisture (water) or other foreign materials to accumulate resulting in excessive exposure to moisture or foreign material. F... McElroy shall have no obligations under this warranty unless and until McElroy receives payment in full for the materials furnished. F. The supplier of the paint coating applied to McElroy panels and the applicator of the paint coating has made certain warranties to McElroy which arc same (or substantially similar) to the warranties made by McElroy under this limited warranty. This limited warranty shall be of no further force or effect if such supplier, or its successors or assigns, can no longer perform its obligations under the coating system warranties made to McElroy. THERE ARE NO OTHER GUARANTEES OR WARRANTIES, EXPRESSED OR IMPLIED, WHICH EXTEND BEYOND THE DESCRIPTION AS STATED HEREIN, INCLUDING ANY WARRANTIES OF MERCHANTABILITY OR FITNESS OF PURPOSE. McELROY METAL SHALL NOT BE RESPONSIBLE FOR ANY INDIRECT OR CONSEQUENTIAL DAMAGES (SUCH AS DAMAGES TO THE CONTENTS OR FURNISHINGS OF ANY BUILDING) OR ANY LOSS OF ANY KIND WHATSOEVER. REV. 4/11 MM604 DATE ISSUED: 08 -9 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REROOF -METAL 111 LOVELL AVE %SOUTHEAST CHAI MEYER PO BOX 2267 SAVANNAH GA 31402 -2267 CRAIG PHILLIPS ROOFING & CRAIG PHILLIPS POOLER GA 31322 P $ 85.00 $4,900.00 PERMIT #: 110446 TOTAL BALANCE DUE: $ 85.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org ezio CITY OF TYBEE ISLAND, GEU..GIA APPLICATION FOR BUILDING PERMIT t-OL-f-Lko Location: I /I .LO 4-c NAME ADDRESS PIN # TELEPHONE Owner eddy Nixes-3 11/ home// ,4 v - Architect or Engineer Building Contractor , LrrAi s 1 i.to 5 � �- i S Cc s (....:4 3 k 96 -� (Check all that apply) ❑ Repair ❑ Renovation ❑ Minor Addition ❑ Substantial Addition ❑ Other Details of Project: ❑ Residential ('Single Family ❑ Duplex ❑ Multi - Family n Commercial ? 6 fr/74Z-7 ❑ Footprint Changes ❑ Discovery ❑ Demolition S4�o,r•�-ci Sect n -% snap - I o ck Estimated Cost of Construction: $ 1/96, Construction Type (Enter appropriate number) (1) Wood Frame (4) Masonry (6) Other (please specify) (2) Wood & Masonry (5) Steel & Masonry (3) Brick Veneer Proposed use: Remarks: ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units # Bedrooms # Bathrooms Lot Area Living space (total sq. ft.) # Off - street parking spaces Trees located & listed on site plan Access: Driveway (ft.) With culvert? With swale? Setbacks: Front Rear Sides (L) (R) # Stories Height Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by /E-K� by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: *. - 5 -/ Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification NFIP Flood Zone Approved rezoning/variance? Street address and number: New Existing Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL LEAD -BASED PAINT Adapted from http: / /www.epa.gov /lead /pubs/renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead -safe work practices. Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010. Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lea safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA h developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your proje However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 hor and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Ch Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -8C 424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenal sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard informat pamphlet. Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 ct care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Ct Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can cre dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovatil repairs, and painting jobs in pre -1978 housing and child - occupied facilities must, before beginning work, provide owners, tenants, z child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Famili Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form n be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe wl practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for fi certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead -safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Reps and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you n take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed le, safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA I developed to help contractors comply with the renovation recordkeeping requirements. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. IFYOU'REtJOT EAD -SAFECERTIFIED, ISTURBING JUST SIX SQUARE FEET COULD COST YOU BIG TIME. Off _ 47— /1 Sig ure Date Printed N Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Projects Involving Demolition, Wrecking, or Renovation The undersigned, hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EPD regulations that could affect the project. Un signed -// Date Office Use Only: Project Address: Permit Number: