Loading...
HomeMy Public PortalAbout11-0462 Dober_1of2Olo City of T,.,ee Island • Community Develop►_ At Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Permit No. - U Z Date Requested Z/z. Owner's Name -D,) ' Date Needed =.// Gen. Contractor Subcontractor Contact Information ?- n);� 3E; - /I �> Project Address L Scope of Work I2.� z wa�r�, I�:,t „AG Inspector ` �l /�f Date of Inspection Inspection t- Lit - - -- INTERNATIONAL CODE COUNCIL' MEMBER Inspection Pass Fail Fee Pass Fail Fee PSs” q. A✓ Inspection Pass LJ Fail El Fee Inspection Pass ❑ Fail ❑ Fee City of Tybee Island • Community Developl_ .nt Dept. Inspection Report 403 Butler Ave. • P.Q. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Permit No. (i'L/ Z% Z Owner's Name ),; Date Requested Date Needed Gen. Contractor Subcontractor � a�j INTERNATIONAL CODE COUNCIL MEMBER Contact Information . _2/ . - f / f ,.41,/91) /47U Project Address d 7 ,/,,iei--kiL Scope of Work >Z ;; 'Z 4111')‘40 , Inspector -7/1 Inspection f /--% - /G Pass Fail Date of Inspection / //Z Inspection /JP - Pass's Fai ee Fee _ Inspection �'�l' ' Pass r Fail ---1 -Fee -17 Inspection ' = `' Pass /za F Fee Permit No. City of Tybee Island • Community Develop. _nt Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 r rattiM INTERNATIONAL CODE COMM: MEMBER Date Requested Owner's Name Date Needed .... Gen. Contractor _.-.5--b/J 47. C-r.),J_S-7 Subcontractor Contact Information (:,-,.) 77:. --- / -.) - Mt: _ Project Address Scope of Work iZ (%--111J` 72)1 ; Inspector Date of Inspection Inspection M /)-)5 \ \\InsPection Inspection )J4, fi Pass El Fail III Fee', Pass El Fail 111 C Pass Fail Fee -76-) -, ? • • ,) ) 4 IL Inspection Pass D Fail Fee CITY OF TYBEE ISLAND BUILDING PERMIT ADDED SCOPE & VALUE DATE ISSUED: 12/16/2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP REPAIR WATER DAMAGE 2 SHIPWATCH CR SUSAN & VINCENT DOBER 6 BRADFORD CV SAVANNAH GA 31410 -2629 STONE CONSTRUCTION SERVICES 4131 OGEECHEE RD STE 104 SAVANNAH GA 31405 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 445.00 PROPERTY IDENTIFICATION # PROJECT VALUATION $50,000.00 ADDED $20,000 FOR REPLACEMENT OF ROTTED WALL TOTAL BALANCE DUE: PERMIT #: 110462 $ 160.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND BUILDING PERMIT ADDED SCOPE & VALUE DATE ISSUED: 12/16/2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # REPAIR WATER DAMAGE 2 SHIPWATCH CR SUSAN & VINCENT DOBER 6 BRADFORD CV SAVANNAH GA 31410 -2629 STONE CONSTRUCTION SERVICES 4131 OGEECHEE RD STE 104 SAVANNAH GA 31405 P $ 445.00 PROJECT VALUATION $50,000.00 ADDED $20,000 FOR REPLACEMENT OF ROTTED WALL TOTAL BALANCE DUE: PERMIT #: 110462 $ 160.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: 0,16 P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org Call Dar\.(2) 313H1g a�d.�;orQl work rue.A pennev ; 4-4-e ci i _er(acev,4 o-c r)4-1-e_J wall 11-2/-n .C.7bb ;a' ,7*) .(44 -.4:e"< ii4ILEE_- a-1 -J rJ (-- 1 ._ OP.4-r/Ea) V viL le4. FEAC-I- 1/044( - fztiz-& 44-6E, 1A34-6( IA,I\ R v,Lc w — S DATE ISSUED: 08 -16 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP CITY OF TYBEE ISLAND BUILDING PERMIT REPAIR WATER DAMAGE 2 SHIPWATCH CR SUSAN & VINCENT. DOBER 6 BRADFORD CV SAVANNAH GA 31410 -2629 STONE CONSTRUCTION SERVICES 4131 OGEECHEE RD STE 104 SAVANNAH GA 31405 FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE P TOTAL FEES CHARGED $ 285.00 PROPERTY IDENTIFICATION # PROJECT VALUATION 530,000.00 PERMIT #: 110462 TOTAL BALANCE DUE: $ 285.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org 1446410 Location: CITY OF TYBEE ISLAND, GEORviA APPLICATION FOR BUILDING PERMIT c z: Z J 13,4v4.-kCE1 NAME PIN # y' G6Z(- 17 --(32.(0 Owner to364 6OSA Z 5I+19uVeTt I.4 CO. Architect or Engineer Building Contractor STon►E GoosrltxeTta•3931 ocnEeckkec AO So kTt (Oy j sou ∎ws LL 5�►�e�wNh�, C��P- 3(y oS' e(2- 23y —y470 (Check all that apply) [ 7 �[ Repair ❑ Renovation ❑ Minor Addition ❑ Substantial Addition ❑ Other Details of Project: C.4.41-,A3 LL ❑ Residential ❑ Single Family ❑ Duplex ❑ Multi- Family ❑ Commercial 2ES-ron,�;0a boE To t.J4I -Eft- VoSS. 3f3_ 117E2 ❑ Footprint Changes (l Discovery ❑ Demolition - S tAe r4toc I[. 'teems, Estimated Cost of Construction: $ 3b,cco .00 Construction Type ® Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: rep l ac :.s- (Enter appropriate number) (4) Masonry (6) Other (please specify) (5) Steel & Masonry Q€S,Os✓NT►fiV /, El -rAL ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following information based on the construction drawings and site plan: # Units Lot Area 7cw # Off - street parking spaces t( Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front # Bedrooms 3 # Bathrooms L Living space (total sq. ft.) 1 5'47 With culvert? Rear With swale? Sides (L) (R) # Stories 1 Height 73 Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air conditioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by $itiNpt-co(tc co i �6 f wAsr - C oNTok% n r< IC -1 N (41" 11.4 by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. 1 understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that 1 must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: $ f I'Z Signature of Applicant: ,_� frt , —e Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New Is it in compliance with City map? If not, has street name and /or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm /Drainage Inspections City Manager FEES Permit Inspections Water Tap Sewer Stub Aid to Const. TOTAL REQUIRED FOR: Building Permits Relocation Permits Sign Permits Demolition Permits Land Clearing, Disturbance or Excavation Permits Tree Removal Permits Relocation Permits Special Review Permits Site Plan Approval Subdivision of Land Sketch Plan Approval Preliminary Plan Approval Final Plat Approval Minor Subdivision Plat Approval Major Subdivision Plat Approval In addition to specific requirements for the above permits and approvals, applicants must demonstrate that they are in compliance with the City of Tybee Island Storm Water Management requirements as outlined in Chapter 5 -4, Code of Ordinances. Section 5 -4 -9 Prohibition provides, in part, as follows: (4.) It is unlawful for any person to cause or permit any storm water to flow from their property onto the property of another person, unless such storm water naturally flowed thereon prior to any development activity. (5.) It is unlawful for any person to interrupt the flow of any storm water runoff from adjacent property onto their property by any development activity. As part of the City's approval process applicants must illustrate how these storm water management prohibitions will be met, including a showing of how storm water naturally flowed on the affected property (prior to any development activity), and what changes in storm water flow have occurred or are expected to occur, as attachments to this form. The City's approval or permit does not guarantee that the applicant's plans will result in meeting requirements. The final product must actually meet the City Ordinance requirements. Applicant name: i:QriE - /l4a- a SToP)E Project I.D.: Attachments approved by: Date: .� <J.< June 30, 2010 The following deficiencies have reached an unacceptable level on the projects in the City of Tybee Island. While the deficiencies are not necessarily the fault of the Owner or his agent, they are their responsibilities. The two areas of deficiencies are in the two most basic and common BMPs on local projects. They are: Co — Construction Exit Shc — Sediment Barrier Correct installation information can be found not only in the "Green Book" but in the Field Manual for Erosion and Sediment Control in Georgia, Fourth Edition 2002, 4310 Lexington Road, P.O. Box 8024, Athens, GA 30603, telephone 706.542.3065, www.gaswcc.org, Georgia Soil and Water Conservation Commission; http: / /www.gaswcc.org /docs/ field_manual 4ed.pdf. Problems with the Co is not limited to the installation, but to the material. Specifically, the job site personnel are telling me the stone delivered is the 1.5 " -3.5" stone they requested. I have experienced on my own projects suppliers not adhering to the specs they are given with the orders. While I regret this situation, I will no longer be accepting any deviation from the State requirements. The stone will be a representation of 1.5 " -3.5" stone or larger. Gradations that are obviously smaller will no longer be tolerated. The smaller stone allows for a smoother surface with smaller voids, thereby reducing the function of the construction exit. Similarly, I am finding Type A sediment barriers installed where Type C is required and shown on the permit drawings. I have attempted to work with the Owners through increased inspections, additional backup BMPs, etc. This has evidently become common knowledge based on the installations I am finding. Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall over) without impacting the second one. The complete assembly and installation must be compliant; steel or wood posts, post spacing, Type C or A. There has been no discharge into state waters due to previous occasional deficiencies. However, the increased frequency has created unnecessary exposure to: 1) Sediment discharge into nearby waters of the State, 2) Increased maintenance efforts by the DPW on downstream lines. 3) Due to #2, higher cost to island taxpayers. I will be adhering strictly to the manual on all BMPs and not just these two. Downer Davis City of Tybee Island Consulting Engineer Signature of Owner /Contractor LEAD -BASED PAINT Adapted from http: / /www.epa.gov /lead /pubs /renovation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers, and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample pre- renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, property owners must submit an application for firm certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead -safe work practices. • Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed leac safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA ha developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010. • Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. • Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation Repair and Painting. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your projec However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 hon' and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Chi, Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -80( 424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenan sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard informatic pamphlet. • Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 chi care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Chi Care Providers, and Schools lead hazard information pamphlet. Information for Contractors As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can crea dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovatio repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, ar child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Familie Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form mi be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe wo practices. To become certified, renovation contractors must submit an application and fee payment to EPA. See: Application for fir certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead -safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repa and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you m, take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become certified renovator. Click here for a list of eligible courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lea safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA h developed to help contractors comply with the renovation recordkeeping requirements. Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right. Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting. F YOU'R OT EAD-SAFECERTIFIED, ISTURBING JUST SIX SQUARE FEET COULD COSTYOU BIG TIM . Sig ature .10A -•6 M- Q1AOL -) . Printed Name /(z/ Date Chatham County Board of Assessors: 2011 Property Record Card 4- 0021 -17 -026 2011 Chatham County Board of Assessors Property Record Card APPRAISER LESTEPH LOT 18 SHIPWATCH DUNES SUB LAST INSP 02/25/2010 APPR ZONE 000008 SALES BOOK / INS VI QU RSN PRICE PAGE 30 Jun 254G 0326 WD I Q 2003 GRANTORJOHNSTON CAROL P GRANTEE DOBER SUSAN S & VINCENT S 280,000 23 Jun 253L 0062 QC I U UN .2003 GRANTORHOGANLENORA ET AL GRANTEE:JOHNSTON CAROL P 01 Sep I U UO 123,800: !1992 GRANTOR: GRANTEE: 01 Jun 1989 GRANTOR: GRANTEE I Q QO 122,000: PERMITS TYPE DATE AMOUNT 090390 RF 090141 WO 030448 COMMENTS: 18 Feb 2004 25 Feb 2010 Comp 6,500 13 Jul 2009 Comp 500 06 Jan 2004 Comp 1 ADDRESS CHG 02/18/04 PER NOTE 05 Nov 2003 TY04 10S REM DEED CNG 25 Nov 2002 FOR SALE 11/22/02 $293,000 23 Jul 2002 FOR SALE 07/19/02 $325,000 10 May 2002 FOR SALE 05/10/02 $375,000 EXTRA FEATURES ID# BLDG # SYSTEM DESC 142508 87189 WOOD DECK GD 142509 87189 Solid Wall /Slab AV 142510 87189 OPEN SLAB AV 142511 87189 Gd Cpt Flat/Shed Rf 2 SHIPWATCH CI DOBER SUSAN S & VINCENT S CAMA 6 BRADFORD COVE 139,900 SAVANNAH GA 31410 '77,100 12,400 229,400 [Click for larger picture • !CODES......._....._......... 'PROPERTY 0006 'USE IUTA NBHD ?EXEMPTIONS Page 1 of 2 4- 0021 -17 -026 R TYBEE ISLAND ASMT 139,900 LAND 1 77,100 BLDG 1 12,400 OBXF 4 229,400 Cost - MS RESIDENTIAL 0004 Tybee Island 019167.00 S167 SHIPWATCH DUNES "HISTORY LAND 12011 139,900 :2010 215,300 !2009 2008 .2007 :2006 ;2005 2004 2003 :2002 2001 ;2000 1999 '1998 1997 ;1996 .1995 ;1994 :1993 :1992 IMPR TOTAL 89,500 229,400 Cama 131,000 346,300 Cama 215,500 172,500 388,000 Over 215,500 172,500 388,000 Cama 215,500 200,000 415,500 Cama 215,500 200,000 415,500 Cama 215,500 162,500 378,000 Cama 159,000 116,500 275,500 Cama 111,500 116,500 228,000 Cama !. 82,000 116,500 198,500 Cama 44,000 98,000 142,000 Cama 44,000 98,000 142,000 Cama 40,000 98,000 138,000 Cama 30,000 96,500 126,500 Cama 30,000 85,500 115,500 Cama 30,000 105,210 135,210 Cama 30,000 108,420 138,420 Cama 30,000 97,180 127,180 Cama 30,000 82,080 112,080 Over 30,000 82,080 112,080 Over DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE 0 0 204.00 G 10.43 2,128 1988 1988 2R 10 20 200.00 G 25.48 5,096 1988 1988 IR 20 8 160.00 G 4.16 666 1988 1988 IR 0 0 864.00 G 11.48 9,919 1988 1988 IR 426 400 3,924 3,900 513 500 7,638 7,600 LAND ID# USE DESC FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 112166 SINGLE FAMILY RES 60 127 7,620.00 -SF 28.25 R1B 139900 http: // boa. chathamcounty .org /DesktopModules/ ChathamCounty /BoardofAssessors /Propert... 8/12/2011 Chatham County Board of AssP -sors: 2011 Property Record Card 4 -002' 17 -026 Page 2 of 2 2011 Chatham County Board of Assessors 4- 0021 -17 -026 Property Record Card BUILDING SECTION CONSTRUCTION TYPE RCN AYB 2 SHIPWATCH CIR TYBEE ISLAND YB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL 87189 -1 Residential 154,0d1 1988 1988 MS 23.00 0.00 0.00 0.00 23.00 118,581 77,100 14' 1 • 906 Wood Deck kith Road 24 . OPEN 6' : Open Are 24 9`_' 4' 144 [Click for larger picture] }2 SHIPWATCH CIRCLE SECTION TYPE 1 - Main AREA 1547 TYPE 1 - Single- family Residence i FRAME 1 - Stud Frame 'STYLE 5 - 1 1/2 Story Finished QUALITY 4.00 CONDITION 3.00 i# UNITS 0 OF BEDS /BATHS 3/2.00 'COMPONENTS R1 108 Frame, Siding, Wood R2 208 Composition Shingle R3 352 Heat Pump I R4 402 Automatic Floor Cover Allowance R6 601 Plumbing Fixtures ( #) R6 602 Plumbing Rough -ins ( #) R6 622 Raised Subfloor (% or SF) R6 642 Single 2 -Story Fireplace ( #) R7 721 Carport, Flat Roof (SF) R7 721 Carport, Flat Roof (SF) R11 903 Wood Deck (SF) R11 903 Wood Deck (SF) R11 906 Wood Deck (SF) with Roof 11R11 909 Enclosed Porch (SF), Solid Walls Units 8.00 1.00 1.00 160.00 966.00 160.00 288.00 24.00 98.00 ak 100.00 100.00 100.00 100.00 QUAL httrr / /hna rhathamrniinty nraffIc.clrtnnAnnrin lac/C hathamrr yrrnfir/RnarAnfOocacenre /Prnnart 2/17/7(111