HomeMy Public PortalAbout11-0466 WilliamsCity of 1, .ee Island • Community Develop. ant Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
INTERNATIONAL
CODE COUNCIL'
MEMBER
Permit No. .- 0 14 Date Requested 1 2 - 7 -
Owner's Name Y V t I GZ r''\ .S Date Needed
Gen. Contractor Subcontractor
Contact Information 4 1 pj Li-
Project
ro Address 10\ 1-4 W CR40 k 0 v T d o a r T rl n
Scope of Work I n 40 I c . r o -1- , vg_ _c (Z�
y
Inspector f J 1
Inpecion r � ` c -+- nr.. Pass Er
Date of Inspection
Fee
Inspection Pass ❑ Fail Fee
Inspection Pass El Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
DATE ISSUED: 08 -17 -2011
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
INSTALL HYDROSTATIC VENTS
1018 HWY 80
DALE E. WILLIAMS
PO BOX 2972
TYBEE ISLAND GA 31328
DALE E. WILLIAMS
PO BOX 2972
TYBEE ISLAND GA 31328
P
$ 0.00
$ 500.00
PERMIT #: 110466
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
0,04/tA"..e.)
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
,\ 1'
f
Location: /0/g- )y
NAME
ADDR
PIN #
Owner
�
� °`
f —
PcT� �`? 2
qt? 9Sy
Architect
or Engineer
Building
Contractor
(Check all that apply)
❑ Repair
❑ Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
Details of Project:
❑ Residential
❑ Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
❑ Footprint Changes
❑ Discovery
❑ Demolition
Estimated Cost of Construction: $ �Q o
Construction Type
(1) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer /
roposed use:
Re ks:
?s
(Enter appropriate number)
(4) Masonry (6) Other (please specify)
(5) Steel & Masonry
(/
co , c h-41 S
ATTACH A
Y OF THE CERTIFIED ELEVATION SURVE
following informat
based on the construction drawings and
F LOT and complete the
e plan:
# Units # Bedrooms # Bathrooms
Lot Area .'ving space to : sq. ft.)
# Off - street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.) ith culvert? With swale?
Setbacks: Front Rear ides (L) (R)
# Stories ght Vertical distance measured from the average adjacent
grade of the buil . ' g to the extreme high point of the building, exclusive of chimneys, heating
units, venti . on ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through /4) — /47'-'- 4
On -site waste and debris containers will be provided by /tJd i AJCA:bt
Construction debris will be disposed by p��L,- a by means of
�`
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
1 understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. 1 understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that 1 must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to r e draft ige impaired by this
permitted construction.
Signature of Applicant�L%
Date: 6.—/ 3 — Zd r/
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning/variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
NFIP Flood Zone
Existing
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals: Signature Date
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL