HomeMy Public PortalAbout12-0279 BeckerDATE ISSUED: 05 -14 -2012
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPLACE ROOF ON ARBOR
1221 MILLER AVE
STEVEN BECKER
1217 CHATEAUGAY
NAPERVILLE IL 60540
STEVEN BECKER
1217 CHATEAUGAY
NAPERVILLE IL 60540
P
$ 0.00
$ 400.00
PERMIT #: 120279
TOTAL BALANCE DUE: $ 0.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
s/g artg
)0062_,A a-- ,1-1\.: S or-L.7/
eel-poi-4-e cm ' a (. 't'► -, . .
i--- d° -0e\rt\r--t --\--\---k-- ilD400 Va\,)e_
i S 1 o I kry, 3 s4- V r, o(if we-,
a o r\ (4- a a ro of on ; A- .C-
--C D c-- i ess '14\ a. v, II) goo 6 (.___
ho„y-\.eows.
A. Ductile Iron Pipe - Shall conform to ANSI /AWWA C150/A21.50 latest revision and ANSI /AWWA C151/A21.51 latest revision
for laying condition two. All pipe shall be cement lined in accordance with ANSI /AWWA C104/A21.4 latest revision.
-All Pipe Larger than 12 inches shall be ductile iron unless PVC is specifically allowed by the City.
1.09 GATE VALVES
D. Valve Manhole - Gate valves 10 "and larger shall be installed in a manhole. Gate valves 8" and larger within pavement
shall be installed in a manhole.
2.01 INSTALLATION
4. Depth of Pipe - The Contractor shall perform excavation of whatever substances are encountered to a depth that will
provide a minimum cover ov- the top of the pipe of 36- inches from the existing or prop.- -d finished grade, for pipe 12-
inches and smaller. Pipe lar er than 12- inches in diameter shall have 3648- inches o cover from the finished grade. A
minimum cover of 33" (inche-) and a maximum cover of 60" (inches) 39" (inches) f .m finished grade shall be accepted as
within tolerance used unless •.proved by the City to avoid a conflict. If the desig over will be less than 36 ", duct iron pipe
may be required by the Ci shall be used. Beddin• shall be .er s•eci ations indust association standards or
manufacturers recommendation whichever is greater.
2.05 PROCEDURES FOR CON ECTIONS OF WATER MAINS:
B. Procedure
6. If a wet tap is required, the co ractor will be responsible for prepa ng the site. This preparation includes the excavation
and installation of the tapping sleev- The contractor will make availa. e a lifting device for the tapping machine and at least a
100 CFM Air Compressor to power th- tapping machine. The City contractor will provide the tapping machine and &Re -man
personnel to operate the unit.
All taps will be made under the supervision of
SECTION 02554 - WASTEWATER COLLECTI
2.12 MANHOLES
degrees to 90 degrees. The drop through m. holes
downstream lines may be used at the discretion of the
degrees at a single manhole shall not be allow d. A wide
alignment change is 90 degrees.
ee Island Water Department.
EM
shall be equal to the steepest percentage of the upstream and
ty of Tybee Island. Horizontal alignment changes greater than 90
s eep invert shall be required for all manholes where the horizontal
Section 03300 CAST -IN -PLACE CONC TE
CHAPTER 1 - GENERAL
1.1 -Scope
1.3- Design of Concrete Structures hall be performed and
Georgia.
In no instance shall a concrete sidew.lk be less than 4" thick nor a
of Savannah Standard Construction
CHAPTER 3 - PROPORTIONIN
3.2- Strength
The specified compressive str
minimum of 3000 4,000 psi u
and road paving shall have a
compressive strength unless
ASTM C39.
mped by a Professional Engineer registered in the State of
riveway less than 6" thick. The Engineer shall refer to City
etails for minimum design requi ements of various structures.
gth of the concrete (f c) for each port •n of sidewalks and curb and gutters shall be a
ess a greater strength requirement is indica : d on the contract drawings or herein. Driveway
ompressive strength of not less than 5000 psi. trength requirements shall be based on 28 -day
different test age is specified. The compressive strength of the concrete shall be determined by
CHAPTER 5 - REINFORCEMENT
5.7- Sidewalks shall be reinforced by one of the following methods:
W2.9.
5.7.2- Concrete shall be fiber reinforced.
5.7.3- Deformed reinforcing bars providing no less than 0.25 square inches per foot (each way).
SECTION 11100 - SUBMERSIBLE WASTEWATER PUMPS
5 -25 HORSE POWER DUPLEX ACROSS THE LINE MAGNETIC
PART III — FINAL INSPECTION
3.01 FINAL INSPECTION / ACCEPTANCE
B. Dry Pumping Test:
Minimum size of mesh shall be 6 "x6" - W2.9 x
The pump will be tested by both a Facility Test and a Site Test.
Chatham County Board of Assessors: ^ "12 Property Record Card 4- 0007 -11 -000
2012 Chatham County Board of Assessors
Property Record Card
Page 1 of
4- 0007- 11 -00i
1221 MILLER AVE TYBEE ISLANE
CAMA ASMT
221,400 221,400 LAND 2
61,600 61,600 BLDG 1
2,100 2,100 OBXF 3
285,100 285,100 Cost - MS
APPRAISER
LAST INSP
APPR ZONE
tlwhitfi
04/02/2010
000008
196 197 WD 4 TYBEE
WHITNEY ANNE PALMER
PO BOX 927
TYBEE ISLAND GA 31328 -0927
SALES BOOK / INS VI QU RSN PRICE
PAGE
01 Jan 1989
GRANTOR:
GRANTEE:
01 Nov 1988
GRANTOR:
GRANTEE:
I U UO 60,000
I Q QO 59,900
PERMITS TYPE DATE AMOUNT
070245 RF 07 May 2008 Comp 3,000
COMMENTS:
[Click for larger picture]
,�'' • `'{ e Chatham County
Tax Commissioner
EXTRA FEATURES
ID# BLDG # SYSTEM DESC
139239 85665 AV CPT FLAT /SHED RF
139240 85665 OPEN SLAB AV
139241 85665 Solid Wall /Slab AV
CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA
NBHD
0004 Tybee Island
020228.00 T228 TYBEE
MILLER AV
EXEMPTIONS L1 L9 S1 L8
HISTORY LAND IMPR TOTAL
2011 295,200 55,400 350,600 Cama
2010 341,100 61,300 402,400 Cama
2009 385,000 91,500 476,500 Over
2008 385,000 91,500 476,500 Cama
2007 548,500 38,000 586,500 Cama
2006 314,500 64,500 379,000 Cama
2005 150,000 52,000 202,000 Over
2004 150,000 52,000 202,000 Over
2003 202,000 A/C
2002 150,000 40,500 190,500 Cama
2001 116,500 54,000 170,500 Cama
2000 73,000 54,000 127,000 Cama
1999 46,500 54,000 100,500 Cama
1998 46,500 53,000 99,500 Cama
1997 46,500 48,000 94,500 Cama
1996 21,180 47,980 69,160 Cama
1995 21,180 49,620 70,800 Cama
1994 21,180 45,350 66,530 Cama
1993 21,180 35,950 57,130 Over
1992 21,180 35,950 57,130 Over
DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE
0 0 247.00 A 8.43 2,082 1970 1970 6R 1,103 1,100
0 0 352.00 A 4.02 1,415 1960 1960 6R 509 500
0 0 80.00 A 31.62 2,530 1970 1970 2R 506 500
LAND
ID#
,110133
110134
USE DESC
SINGLE FAMILY RES
SINGLE FAMILY RES
FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
0 0 8,000.00 -SF 34.00 R2 204000
0 0 2,735.00 -SF 34.00 R2 SZ -75 17400
http: // boa. chathamcounty. org /DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard. asp... 7/26/20]
Chatham County Board of Assessors: "12 Property Record Card 4- 0007 -11 -009
2012 Chatham County Board of Assessors
Property Record Card
Page 2 of
4- 0007- 11 -00E
1221 MILLER AVE TYBEE ISLANC
BUILDING SECTION CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
85665-1 -2012 Residential 85,796 1947 1980 MS 31.00 0.00 0.00 0.00 31.00 59,199 61,600
6'
16
13'
■SLAB
Slab
m®
16'
11'
■SLAB
Shb
i!i1' 1
■CPT
Carpori
247
13'
10'
8'
■ &'
swF �I
Solid y'sa Pon1
1$'
19'
[Click for larger picture]
SECTION TYPE
AREA
TYPE
FRAME
STYLE
QUALITY
CONDITION
# UNITS
# OF BEDS / BATHS
1 - Main
1200
1 - Single- family Residence
3 - Masonry Frame
1 - One Story
3.00
3.00
0
2/1.00
COMPONENTS
R1 163
R2 208
R3 352
R4 402
R6 601
R6 621
R6 641
Masonry, Concrete Block
Composition Shingle
Heat Pump
Automatic Floor Cover Allowance
Plumbing Fixtures ( #)
Slab on Grade (% or SF)
Single 1 -Story Fireplace ( #)
Units % QUAL
100.00
100.00
100.00
5.00
1.00
100.00
http: //boa. chathamcounty .org /DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard. asp... 7/26/20]
Location:
/ 2--x.2 79
22�
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
(ILLE2 UE
rte
NAME
ADDRESS
PIN #
TELEPHONE
Owner
! v � 6ECt«2
( z t
�(� z
Architect
or Engineer
--,
Building
Contractor
(Check all that apply)
Repair
Renovation
❑ Minor Addition
❑ Substantial Addition
❑ Other
•
Residential
Single Family
❑ Duplex
❑ Multi- Family
❑ Commercial
[1 Footprint Changes
n Discovery
n Demolition
Details of Project: eLi ACC t\--2 (3c / � of.-) St DE 06 HOC)
``
�'c (
0 ^ I J
UU
Estimated ost of Construction: $
Construction Type
(1) Wood Frame
Wood & Masonry
(3) rick Veneer
Propo d use:
Remarks.
C)"
(Enter appropriate number)
(4) Masonry (6) Other (please specify)
(5) Steel & Masonry
ATTACH A . • 'Y OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following inf. ' q ation based on the construction drawings and site plan:
# Units # Bedrooms # Bathrooms
Lot Are. Living space (total sq. ft.)
# Off -s eet parking sp. es
Trees ocated & listed on ite plan
Acce.s:
Dri eway (ft.) With culvert? With swale?
Set►acks: Front Rear Sides (L) (R)
# •ries Height Vertical distance measured from the average adjacent
grade of the building to the extrem- igh point of the building, exclusive of chimneys, heating
units, ventilation ducts, air conditioning units, elevators, and similar appurtances.
During construction:
On -site restroom facilities will be provided through -7 f- /-f
On -site waste and debris containers will be provided by
Construction debris will be disposed by O (xl t,I-E:R_ by means of `tom
I understand that I must comply with zoning, flood damage control, building, fire, shore
protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations.
I understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements are met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date: J1 Z Signature of Applicant: 1 1
Note: A permit normally takes 7 to 10 days to process.
The following is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
Is it in compliance with City map?
If not, has street name and /or number been reported to MPC?
NFIP Flood Zone
Existing
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual finding(s)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Storm/Drainage
Inspections
City Manager
DoSture ,5 Date
FEES
Permit
Inspections
Water Tap
Sewer Stub
Aid to Const.
TOTAL
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit holder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (10) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
Inspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EPD regulations that could affect the
project.
Undersigned
6ecKr52_,
Printed Name
Date
Office Use Only:
Project Address:
Permit Number:
LEAD -BASED PAINT
Adapted from http: / /www.epa.govAead /pubs /renovation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lead Hazard Information for Families, Child Care Providers,
and Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre- renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must submit an application for firm
certification and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead -safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 2010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
• Read about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project.
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or repairs, please read a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when a renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
sign a pre- renovation disclosure form, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 2008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Important Lead Hazard Information for Families, Child
Care Providers, and Schools lead hazard information pamphlet.
Information for Contractors
As a contractor, you play an important role in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lead Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's pre- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and feg payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certificatiorl o approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
Take training to learn how to perform lead -safe work practices.
• Find a training provider that has been accredited by EPA to provide trainint for renovators under EPA's Renovation, Repair,
and Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
certified renovator. Click here for a list of eligible courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -safe work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recordkeeping checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Small Entity Compliance Guide to Renovate Right.
ad about how to use lead -safe work practices in EPA's Steps to Lead Safe Renovation, Repair and Painting.
4( )11/
IF YOU'RE NOT
_LEAD SASE CERTIFIED
.DISTURBING
-JUST SIX
SQUARE FEET
.000LDCOSTYOU
BIG TIME.
Sig ature
} P 3 cKt Z
Printed Name
Date
pa 91
70 P
KFP-ck T (1(7 1,4 (L_Lte