HomeMy Public PortalAbout12-0361 MohsINTERNATIONAL
CODE COUNCIL
MEMBER
City oi,
403 Butler
Phone
)ee Island • Community Develi fent Dept.
Inspection Report
Ave. • P.O. Box 2749 • Tybee Island, GA 31328
912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. 0 -D 3 6/ Date Requested ®‘h-‘{la-
Owner's Name AM s Date Needed D ‘/c/Jc-
Gen. Contractor Subcontractor C.. L /mil - 7ge /4.
Contact Information
Project Address
Scope of Work
Inspector
-/-%DSEs? /0%3 -77z/7
/0 eiq 'BPffzf LIAJ6
fig Ax RpfuuR_s Ap-rp Fioore
Inspection
Date of Inspection
Pass El Fail
Inspection
Inspection
Inspection
Fee
Pass ❑ Fail ❑ Fee
Pass ❑ Fail ❑ Fee
Pass ❑ Fail ❑ Fee
DATE ISSUED: 06 -26 -2012
WORK DESCRIPTION
WORK LOCATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPL AIR HAULERS/BOTH FLOORS
10 SEA BREEZE LANE
OWNER NAME DOROTHY F. MOHS
ADDRESS PO BOX 2058
CITY, ST, ZIP TYBEE ISLAND GA 31328 -2058
PHONE NUMBER
CONTRACTOR NAME CLIMATECH AIR INC
ADDRESS 121 W DERENNE AVE
CITY STATE ZIP SAVANNAH GA 31405
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 65.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $4,040.00
PERMIT #: 120361
TOTAL BALANCE DUE: $ 65.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P.O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND
COMMUNITY DEVELOPMENT DEPARTMENT
P.O. Box 2749 •403 Butler Ave., Tybee Island, GA 31328
Phone (912) 786 -4573 • Fax (912) 786 -9539
MECHANICAL PERMIT APPLICATION
Location of work (street address) t(r) -u t
Contractor
C \tv . e c\\..
Address of contractor
a\
kx-)e_ST
Contact name & telephone number of contractor
Name of property owner
( 31-k 0.S
Lar ( k-V)9- 5(0 Co
1-r moll S
Mailing address of property owner I (7) etc, e La •t.
Telephone number of property owner 78 - 8 ?q -
Residential -
New Work
Details of project
Commercial
Replacement 47(
•
n -
.AL
Estimated cost of construction
Date work will be ready for inspection, if known (, - .. 7- i `a
ATTENTION:
Permit Number
Inspections for Mechanical Permits are required and will be in accordance with the
International Residential Code or the International Mechanical Code and the Georgia
Amendments.
Requirements for "change- outs" will not be less than the requirements for new installations. In
addition, elevation of outside condensing units for FEMA compliance is required. Plan
accordingly. Please ask if you have any questions.
+ner/ on or si: iature
�.I,,l" j4.i 1 \0
Owner /Contractor printed name
Date