HomeMy Public PortalAboutLOVELL AV_1103 (3).pdfCity of Tybee Island • Community Development Dept.
Inspection Report
403 Butler Ave. P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.472 -5032 • Fax 912.786.9539
INTERNATIONAL
CODE COUNCIL
MEMBER
Permit No. 1 3 - 0 74)7_ Date Requested
Owner's Name Liv=c> Date Needed
Gen. Contractor t n)1 O bu1 ; :00. -Li.) Subcontractor
Contact Information 01 .5. Lr u�(41. -2
Project Address ) I 0 LOS' .-
Scope of Work V.) 1 i•YbOv.) ; �-Di, -c.;i: r1 t 1
Inspector '7 / �j Date of Inspection ? !
Inspection -t =i N4 I Pass ,Fail Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass ❑ Fail ❑ Fee
BC** 11720.1
LC- PG2400 914X1524 TYPE H
Air Infiltration /Exfiltration: A2 /A2
Water Test Pressue: 440 PA
Positive Design Pressure: 2400 PA
Negative Design Pressure: 2400 PA
est Method:
AAMA/WDMA/CSA/101 /I.S.2/A440
lax Test Size: 52X96
/indow Size: 34.875x50.25
214 - 214605
11111111111111111111111111111111111111111111
G50
,.
NFRC "'—
I``
National Fenestration
Rating council®
RMI
Series 4000 Double Hung
CPD# RS0- R- 11- 02059 -00007
SOLID UINYL - UELDE0 - DOUBLE GLZD
13/16" IG. OS LE70, ARGON
CERTIFIED
ENERGY PERFORMANCE RATINGS
U- Factor
0•32
(U.S. /1 -P)
1•82
(Metric /SI)
Solar Heat Gain Coefficient
0.21
_
ADDITIONAL PERFORMANCE RATINGS
Visible Transmittance
0.49
Manufacturer stipulates that these ratings conform to applicable NFRC procedures for determining whole
product performance. NFRC ratings are determined for a fixed set of environmental conditions and a
specific product size. NFRC does not recommend any product and does not warrant the suitability of any
product for any specific use Consult manufacturer's literature for other product performance information.
wWW.nfrc.org
DATE ISSUED: 12 -4 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
CITY OF TYBEE ISLAND
BUILDING PERMIT
REPL 40 WINDOWS
1103 LOVELL AVE
G. R. LEONARD
1103 LOVELL AVE
TYBEE ISLAND GA 31328
WINDOW WORLD OF SAVANNAH
2708 LEGION DR
THUNDERBOLT GA 31404
P
$ 144.00
4- 0006 -20 -012
PROJECT VALUATION $12,336.00
PERMIT #: 130762
WINDOWS, DOORS AND SKYLIGHTS
SSTD 1046 TABLES 602A1, 102A2, 6021.3, SECT 6Q4
AND IRC 601,11.2
WINDOWS, G111;8 bDDORS ANIE:r.,•17das SHAD. BE
APPROVED ADD WALLED LLED g ay e31 PLY WITH BOTH
DOSITIVE AXIS r ....a:ES.
TOTAL BALANCE DUE: $ 144.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
Arai-
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
/3 -.&P 76.-
Property Address: /703 ,Lo ✓eLL
City of Tybee Island, Georgia
912- 472 -5030 • Fax 912- 786 -9539
APPLICATION FOR BUILDING PERMIT
PIN: 4V �DDri -074 0%2-
❑ Single Family
❑ Duplex
❑ Multi - Family units
❑ * Commercial unit(s)
Check all that apply *'mit Y,J k /LL/AM
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
-/445-4
Demolition ❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: 6PLfj!e '40 w )N bou).5
eo
Estimated Cost of Construction: $ ia, 331p.
(materials + labor + profit /overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: /7 7� Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Printed Name of Applicant: G GL. R. Leo claret
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Date: t,- 6--! 3 Signature:
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Sign
Date
Z -14 -13
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Name
Mailing Address
Telephone
Owner
6°,/. ,(,,,,�'a�,J/}RD
1103 Lo16LL
Home: f4f -'fJ
Cell: ��{y� - /45-ct
Architect or
Engineer
Office:
CeII:
Contractor
1 ,' ''� 11
I/J 0ix) /d4, 12
W r V
Office:
CeII:
❑ Single Family
❑ Duplex
❑ Multi - Family units
❑ * Commercial unit(s)
Check all that apply *'mit Y,J k /LL/AM
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
-/445-4
Demolition ❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: 6PLfj!e '40 w )N bou).5
eo
Estimated Cost of Construction: $ ia, 331p.
(materials + labor + profit /overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
Year Built: /7 7� Listed on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -site restroom facilities will be provided through . Construction debris will be disposed
by by means of . I understand that I must comply with zoning, flood
damage control, building, fire, shore protection and wetland ordinances, FEMA regulations and all applicable codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Printed Name of Applicant: G GL. R. Leo claret
Note: A permit normally takes 7 to 10 days to process. Processing time for a
historic structure may be longer.
Date: t,- 6--! 3 Signature:
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm /Drainage
City Manager
Sign
Date
Z -14 -13
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right: Important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than 6 ft2 per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Projects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
* * * * * * * * * * * * * * * * * * * **
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http://www.gaswcc.org/docs/field_manual_4ed.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts, post spacing, Type C or A.
aJ Ye t2 -5-13
i nature for receipt of Lead Paint, Asbestos, and BMP notices Date
9 P >
C !01^ 1 a, R , LQona.rd
Printed Name
Chatham County Board of Assessors: 2013 Property Record Card 4- 0006 -20 -012
2013 Chatham County Board of Assessors
Property Record Card
Page 1 of 2
4- 0006 -20 -012
1103 LOVELL AVE TYBEE ISLAND
APPRAISER
LAST INSP
APPR ZONE
MWTHOMAS
02/28/2013
000008
LOT 31 A WD 3 TYBEE ISLAND
LEONARD GLORIA R
1103 LOVELLAVE
TYBEE ISLAND GA 31328 -1476
CAMA ASMT
161,200 161,200 LAND 1
131,300 131,300 BLDG 1
OBXF 0
292,500 292,500 Cost - MS
SALES BOOK/ INS VI QU RSN PRICE
PAGE
20 Feb 2012 3750 955 ED I U UE
GRANTOR:REMION & LEONARD HELEN STOKES
GRANTEE:LEONARD GLORIA R
05 Mar 2002 232X 0170 NA I U UE
GRANTOR:LEONARD GLORIA R EXECUTRI
GRANTEE:REMION HELEN STOKES
01 Mar1984
GRANTOR:
GRANTEE:
I 0 Q0 92,000
COMMENTS:
12 Jan 2012
TY12 DOD HELEN REMION
11/21/2011 PER COD 609 -2383
14 Jun 2007 TY08 STATE ENT /DOB3 -11-
33 /6 -14 -07 AMW
29 Nov 2006 ADD CNG PER FAX 11/29/06
APW
12 Dec 2001 FRONTS REAR OF TYBEE
MARK 15%
[Click for larger picture]
SAG
.' �:4 Chatham County
1 A Tax Commissioner
F'ei,4l Property Tae ctatenr_ nt
CODES
PROPERTY
USE
UTA
NBHD
0006 RESIDENTIAL
0004 Tybee Island
020225.00 T225 TYBEE
INNER
EXEMPTIONS S1 L9 L1 SC L8
LAND
ID# USE DESC
109887 SINGLE FAMILY RES
HISTORY
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
LAND IMPR TOTAL
161,200 96,000 257,200 Cama
161,200 96,000 257,200 Cama
282,000 149,600 431,600 Cama
282,000 153,500 435,500 Over
282,000 153,500 435,500 Cama
282,000 140,500 422,500 Cama
282,000 128,500 410,500 Cama
150,000 168,000 318,000 Cama
89,500 194,000 283,500 Cama
64,000 119,500 183,500 Cama
149,000 149,000 Over
149,000 149,000 Over
149,000 A/C
31,500 99,000 130,500 Cama
31,500 97,500 129,000 Cama
124,000 NC
15,000 114,750 129,750 Cama
15,000 164,880 179,880 Cama
15,000 124,290 139,290 Cama
15,000 71,190 86,190 Over
15,000 71,190 86,190 Over
FRONT DEPTH UNITS /TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
60 79 4,740.00 -SF 34.00 R2 161200
http: // boa. chathamcounty. org/ DesktopModules /ChathamCountyBoardofAssessors /Propert... 12/4/2013
30
Chatham County Board of Assessors: 2013 Property Record Card 4- 0006 -20 -012 Page 2 of 2
2013 Chatham County Board of Assessors
Property Record Card
4- 0006 -20 -012
1103 LOVELL AVE TYBEE ISLAND
BUILDING SECTION
85473 -1 -2013
CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
Residential 185,388 1978 MS 44.00 0.00 0.00 0.00 44.00 103,817 1.10 131,300
4
10'
20'
10'
M IMI
I,,o Story
24110
300
1101111-01 100
pm
•
• 100
10' Oor,tory0
ul0
904
,Inn Yorc4 »I1I ROO
[Click for larger picture]
SECTION TYPE
AREA
TYPE
FRAME
STYLE
QUALITY
CONDITION
# UNITS
# OF BEDS / BATHS
1 - Main
2800
1 - Single- family Residence
1 - Stud Frame
2 - Two Story
3.00
3.00
0
4/3.00
COMPONENTS
R1 108 Frame, Siding, Wood
R2 208 Composition Shingle
R3 352 Heat Pump
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #)
R6 602 Plumbing Rough -ins ( #)
R6 621 Slab on Grade (% or SF)
R7 711 Built -in Garage (SF)
R11 903 Wood Deck (SF)
R11 904 Slab Porch (SF) with Roof
Units % QUAL
100.00
100.00
100.00
11.00
1.00
100.00
300.00
60.00
100.00
http: // boa. chathamcounty. org/ DesktopModules/ ChathamCounty /BoardofAssessors /Propert... 12/4/2013