RESOLUTION AUTHORIZING A PROFESSIONAL SERVICES CONTRACT ,
FOR ENGINEERING SERVICES WITH CME ASSOCIATES
WATERFRONT COVE MARINA WATER & SEII'ER FEE ESTDLATE
WHEREAS, the Borough of Carteret is in need of specialized engineering services with
regard to the Waterfront Cove Marina Water & Sewer Fee Estimate; and
WHEREAS, the Borough's Consulting Engineers, CME Associates, possess the
requisite skill and expertise to provide said services; and
WHEREAS, CME Associates has submitted a proposal to provide said engineering
services at a total cost not to exceed $40,000.00; and
WHEREAS, the Mayor and Council have reviewed said proposal; and
WHEREAS, the Chief Financial Officer has certified that finds are or will be available
for said purpose.
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Borough
of Carteret, County of Middlesex, State of New Jersey, as follows:
1. The proposal from CME Associates for engineering services related to
the Waterfront Cove Marina Water & Sewer Fee Estimate at a total
cost not to exceed $40,000.00 at the rate set forth in Ch4E's existing
contract with the Borough is hereby approved.
2. Annexed hereto is a copy of said proposal.
3. This action is approved as an award of a professional services contract
pursuant to N.J.S.A. 40A:11- 5(1)(a) in accordance with the Borough's
Fair and Open Process as authorized by law.
Adopted this 16" day of February, 2012
and certified as a true copy of the
original on February 17, 2012.
KATHLEEN M. BARNEY, MMC
Municipal Clerk
RECORD OF COUNCIi- VOTE
c?�
C/
COUNCILMAN
YU3
NO
NY
d.0.
QI h}nN
1'1S
NO
NV AJt.
e��
EEO
i�;�al
x
DIAZ
DntLt:IO
X
x
_
� x
� "'
W�
X - Lidicxle Vo1c AO Absent NV
- Not Voting XCII- ludicalcs Volc le Ovcnolc Vno
Adupted at a meeditp of the Municipal - Council
Febn-2ty 16 20q2
,
c?�
C/
Via E -Mail & 1 Class Mail
Mayor Daniel Reiman
Borough of Carteret
Municipal Building
61 Cooke Avenue
Carteret, NJ 07008
January 11, 2012
Revised February 7, 2012
Re: Fee Estimate for Professional Engineering Services
Waterfront Cove Marina Water & Sewer
Block 4, Lots 3 and 4
Borough of Carteret, Middlesex County, NJ
Proposal No. 2011 -191
Dear Honorable Mayor Reiman:
Thank you for the opportunity to present this fee estimate for Professional Engineering
Services relative to the design of water and sewer main extension and distribution to the
site This proposal outlines the scope and cost of the following services:
Scone of Work
The development of the upland Marina improvements, ferry terminal, New Jersey State
Police Marine Station, and the marina itself will require the extension of water and sewer
mains for distribution to proposed buildings and the floating docks.
The scope of this proposal will include the design of the following:
• Wet tap the existing water main located on Middlesex Avenue.
• Extend the water main from Middlesex Avenue down the existing walkway
located within the access easement along the block limit to the marina.
• Extend the sanitary sewer main from Middlesex Ave down the existing walkway
located within the access easement along the block limit to the marina.
• Provide water and sewer services to the NJ State Police Building, Port Authority
Building, bathroom facility, each boat slip, and the ferry terminal
C Boat Sewage Pump Out Facility.
• Pump station and sanitary force main for the proposed marina and New Jersey
State Police Facility.
S VCSrterelWrOposals501 01 Marina Water 88ev,er 11 -2311 tloc �� ✓//
CONSSIATING AND MUNIOPAL ENGINEERS ?3Y 4
1480 ROUTE 9 SOUTH, HOWELL, NEW JERSEY 07731 — (732) 4027400 — FAX: (732) 4090750
JOHN H. ALLGAIR, RE., P.P. (1983 -2001)
DAVID J. SAMUEL, P.E., P.P.
JOHN J. STEFANI, P.E., L.S., P.P.
JAY B. CORNELL, RE., P.P.
MICHAEL J. McCLELLAND, P.E., P.P.
GREGORY R. VALES[, P.E., P.P.
o
TIMOTHY W. GILLEN, P.E., P.P.
BRUCE M. KOCH, P.E., P.P.
BEHRAM TURAN, P.E.
TREVOR J. TAYLOR, P.E., P.P.
ASSOCIATES
LOUIS J. PLOSKONKA, P.E.
Via E -Mail & 1 Class Mail
Mayor Daniel Reiman
Borough of Carteret
Municipal Building
61 Cooke Avenue
Carteret, NJ 07008
January 11, 2012
Revised February 7, 2012
Re: Fee Estimate for Professional Engineering Services
Waterfront Cove Marina Water & Sewer
Block 4, Lots 3 and 4
Borough of Carteret, Middlesex County, NJ
Proposal No. 2011 -191
Dear Honorable Mayor Reiman:
Thank you for the opportunity to present this fee estimate for Professional Engineering
Services relative to the design of water and sewer main extension and distribution to the
site This proposal outlines the scope and cost of the following services:
Scone of Work
The development of the upland Marina improvements, ferry terminal, New Jersey State
Police Marine Station, and the marina itself will require the extension of water and sewer
mains for distribution to proposed buildings and the floating docks.
The scope of this proposal will include the design of the following:
• Wet tap the existing water main located on Middlesex Avenue.
• Extend the water main from Middlesex Avenue down the existing walkway
located within the access easement along the block limit to the marina.
• Extend the sanitary sewer main from Middlesex Ave down the existing walkway
located within the access easement along the block limit to the marina.
• Provide water and sewer services to the NJ State Police Building, Port Authority
Building, bathroom facility, each boat slip, and the ferry terminal
C Boat Sewage Pump Out Facility.
• Pump station and sanitary force main for the proposed marina and New Jersey
State Police Facility.
S VCSrterelWrOposals501 01 Marina Water 88ev,er 11 -2311 tloc �� ✓//
CONSSIATING AND MUNIOPAL ENGINEERS ?3Y 4
1480 ROUTE 9 SOUTH, HOWELL, NEW JERSEY 07731 — (732) 4027400 — FAX: (732) 4090750
Honorable Mayor Daniel Reiman ASSOCIATES February 7, 2012
Re: Waterfront Cove Marina Water & Sewer Our Proposal #2011 -190
Page 2
Accommodations for the future connection of the ferry terminal to the pump
station and water main extension.
D si n Phase Services
The design phase will include preparing preliminary construction plans for submission to
the Borough and outside agencies for permit applications. The utility plans will include
water main and sanitary sewer main plans and construction details. Also, a preliminary
cost estimate will be developed utilizing the utility plans.
Estimated Fee for Services ............................. ............................... $35,000.00
B. Permit Phase Services
It is anticipated that permits from the following outside agencies will be required prior to
commencing construction:
NJ Department of Environmental Protection Division of Water Suppiy
Under the regulatory requirements of the NJDEP, Water System Construction Permits, a
Simplified Water Main extension permit is required since the project includes more than
50 new water service connections. Work in this phase will include preparation and
submission of the aforementioned permit application and associated plans to the NJDEP
for approval. It should be noted that the Simplified Water Main permit has a 90 day
review period from the time the application is deemed complete.
NJDEP Simplified Water System Construction Permit .................... $6,000.00
NJ Department of Environmental Protection Treatment Works Approval Permit
Should the recommended improvements to the sanitary sewer main require a Treatment
Works Approval permit from the NJDEP, work in this phase will include preparation and
submission of the aforementioned permit application and associated plans to the NJDEP
for approval. It should be noted that the Treatment Works Approval permit has a 90 day
review period from the time the application is deemed complete.
NJDEP Treatment Works Approval Permit
......I ................ $7,500.00
S \Carterall m,sa;s \501 Gt Marne VMorS Sevier 11 -23 -11 doc
Honorable Mayor Daniel Reiman ASSOCIATES February 7, 2012
Re: Waterfront Cove Marina Water & Sewer Our Proposal #2011 -190
Page 3
Should the proposed utilitie require to b extended under the existing railroad tracks
within the CONRAIL right -of ay, on cupancy permit will be required from CONRAIL
property division. This phase ill i c9ude the necessary drawings, applications, and
specifications for the occupanc ermit.
CONRAIL Occupancy P t...........\ ........ ............................... $3,500.00
C. Construction Phase vices
The following services will be provided under this phase:
Contract preparation including review of bonds, insurance certificates and project
manning reports;
• Attend preconstruction meeting;
• Provide assistance with interpretation of contract documents;
• Review shop drawings for site - related items; and,
• Provide construction observation services, prepare contractor punch lists and
review and prepare pay estimates.
Estimated Fee for Services ............................. ............................... $65,000.00
The following is a cost breakdown of the services and fee estimates described herein
(below):
A. Design Phase Services ............................................ ............................... $35,000.00
B. Permit Phase Services ............................................. ............................... $17,000.00
C. Constriction Phase Services .................................. ............................... $65,000.00
Total Fee for Services ..................................... ............................... $117,000.00
Should you accept our fee estimate, kindly provide a purchase order or professional
services Resolution authorizing same.