HomeMy Public PortalAboutORD15089BILL NO. 2012 -146
SPONSORED BY COUNCILMAN` (, Scrivner
ORDINANCE NO. 1 '1 0 �3
AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AUTHORIZING THE MAYOR AND CITY
CLERK TO EXECUTE AN AGREEMENT WITH STOCKMAN CONSTRUCTION CORPORATION FOR
THE 300 BLOCK WEST ASHLEY STREET (STORMWATER AND SANITARY SEWER) AND 700
BLOCK OF SOUTHWEST BLVD. ( STORMWATER) PROJECT.
BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS:
WHEREAS, Stockman Construction Corporation has become the apparent lowest and best bidder on
the 300 Block of W. Ashley St (Stormwater and Sanitary Sewer) and 700 Block of
Southwest Blvd. (Stormwater) project;
NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI,
AS FOLLOWS:
Section 1. The bid of Stockman Construction Corporation is declared to be the lowest and best
bid and is hereby accepted.
Section 2. The Mayor and City Clerk are hereby authorized to execute an agreement with
Stockman Construction Corp. for the 300 Block of West Ashley Street (Stormwater and Sanitary Sewer)
and 700 Block of Southwest Blvd. (Stormwater) project.
Section 3. The agreement shall be substantially the same in form and content as that agreement
attached hereto as Exhibit A.
Section 4. This Ordinance shall be in full force and effect from and after the date of its passage
and approval.
Passed:
nfla/La( / , v� /
Presiding Officer
ATTEST:
City C+erk
,Irl411//
Approved:
ri/??-_712
APPROVED AS TO FORM:
City Counselor
FINANCE DEPARTMENT
PURCHASING DIVISION
SUBJECT: Bid 2659 Project 33076 — 300 Blk W. Ashley St. (Stormwater and Sanitary Sewer)
and 700 Blk Southwest Blvd. (Stormwater) Engineering Division,
Opened February 19, 2013
BIDS RECEIVED:
Stockman Construction Corp, Jefferson City, MO
JC Industries, Inc., Jefferson City, MO
Don Schnieders Excavating Co., Jefferson City, MO
Twehous Excavating Co., Jefferson City, MO
Lehman Construction, LLC, California, MO
Ed Laubinger Excavating, LLC, St. Clair, MO
Sam Gaines Construction, New Bloomfield, MO
Sterling Excavation & Erection, LLC, Jefferson City, MO
FISCAL NOTE:
$210,728.00
$219,977.00
$239,351.40
$255,269.25
$276,375.75
$291,924.00
$307,045.00
$386,471.50
44- 990 - 576007 — Misc. Neighborhood Imprs 64- 990 - 579850 — Sewer Rehab & Repl
Budget 2013
Encumbered
Expensed
Bid 2659
Balance
$ 400,000.00
$ 10,968.38
$ 79, 835.37
$ 108,522.05
$ 200,674.20
PAST PERFORMANCE:
Budget 2013
Encumbered
Expensed
Bid 2659
Balance
$ 325,000.00
$ -0-
$ 212,555.00
$ 102,205.95
$ 10,239.05
Stockman Construction Corporation has completed projects as specified and bid in the past.
RECOMMENDATION:
Staff recommends award to the lowest and best bidder, Stockman Construction Corporation of
Jefferson City, Missouri in the amount of $210,728.00.
ATTACHMENTS - SUPPORTING DOCUMENTATION
Signature
Publi Works Director
Department of Public Works Memorandum
320 E. McCarty Street • Jefferson City, Missouri 65101 • P 573- 634 -6410 • F 573 - 634 -6562 • www.jeffcitymo.org
Date:
To:
From:
Subject:
February 21. 2013
Terry Stephenson. Purchasing Director. Finance
David Bange. Engineering Supervisor
300B1k W. Ashley St (SW & SS) and 700Blk Southwest Blvd. (SW)
Project No. 33076
Bid No. 2659
Public Works has completed a review of the bids opened at 1:30 P.M. on Tuesday, February 19,
2013 for the above noted project. As part of the review all the bids were tabulated to check for
math errors and to compare unit price quotes of the various contractors. Attached to this memo
is the tabulation of the eight (8) bids that were received for the project, as well as a listing of the
registered plan holders.
Based on our review. we recommend acceptance of the bid from the low bidder Stockman
Construction Corporation. 2021 ldlewood Road. Jefferson City. Missouri 65109. The total
amount of the contract will be $210.728.00.
The project will be expensed as follows:
Stockman Construction Corporation ($210,728.00):
Account Number: Amount Available:
44- 990 - 576007
64- 990 - 579850
$309.19625
$1 12.445.00
Required: Remaining:
$108.522.05
$102205.95
if you need any other information please feel free to contact ine at extension 6433.
DB:db
Attachments: Bid Tabulation Sheet. Plan Holders List
cc: Project file
Writer's file
$200,674.20
$10,239.05
Page 1
Date' Feb 19.'13
Bid No. 2659
CITY OF JEFFERSON
BID TABULATION
300BIk W. Ashley St. (Stormwater & Sanitary Sewer) and 700Blk Southwest Blvd. (Stormwater)
PROJECT NO. 33076
ITEM NO.
DESCRIPTION
UNIT
APPROX.
QUANTITY
ENGINEER'S ESTIMATE
Stockman Construction Corp.
J.C. Industries, Inc.
Don Schnieders
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
1
Mobilization
LS
1
57.000.00
57,000.00
$3,000.00
33.000.00
52.588.00
$2.588.00
$2.500.00
32.500.00
2
Construction Signage 1 Traffic Control
EA
2
$5.000.00
$10.000.00
$5.000.00
510.000.00
32,335.00
34,670.00
$4,200.00
58,400.00
3
Removals
LS
1
515.000.00
515,000.00
310,000.00
310.000.00
34,858.00
54.858 00
510.240.00
$10.240.00
4
Rock Excavation
CY
50
$100.00
55,000.00
$75.00
$3.750.00
$102.00
S5.100.00
3135.00
$6.750.00
5
Subgrade Stabilization
TON
400
520.00
$8.000.00
$20.00
58.000.00
S26 00
$10,400.00
324.00
$9.600.00
6
Earthwork
LS
1
S7.000.00
07.000.00
04,000.00
$4,000 00
35,215.00
$5,215.00
$4.000 00
$4.000.00
7
08" dia, PVC
LF
46
530.00
$1,380.00
$14 00
$644.00
550.00
$2.300 00
$18 00
5828.00
8
15" dia. RCP Class III
LF
13
$50.00
$650.00
$36.00
$468.00
$52.00
$676.00
070.00
$910.00
9
30" dia. RCP Class III
LF
438
$80.00
$35,040.00
$66.00
$28.908.00
$80 00
035.040.00
$92 00
540.296.00
10
42" dia. RCP Class III
LF
133
$120.00
$15.960.00
5120.00
$15.960.00
$132 00
$17.556.00
3145 00
519.285.00
11
4' x 4' Type A Inlet [C2J
EA
1
53.300.00
33.300.00
$3.500 00
53,500.00
52.583.00
52.583 00
53.269.00
53.269.00
12
4' x 4' J -Box (C11
EA
1
$3,250.00
$3,250.00
53.300 00
53.300.00
02.283.00
$2,283 00
33.040.00
$3.040.00
13
4' x 5' J -Box [IA. IBJ
EA
2
$3.500.00
$7,000.00
$3.700 00
57.400.00
52,940.00
$5,880.00
34,692.00
39.384 00
14
Sanitary Sewer Main (8" dia. SDR 35)
LF
450
$50.00
522,500 00
$43.50
519.575 00
576.00
334.200 00
578.50
335.325.00
15
Sanitary Sewer Lateral (4 "dia SCH 40)
LF
300
330.00
$9.000.00
$28.50
58.550 00
$63.00
318,900.00
356 00
516.800.00
16
Clean out and Ex SS Connection
EA
16
5300.00
34,800.00
5245 00
33.920 00
5200 00
$3,200.00
5125 00
32.000 00
17
Valve Box Covers
EA
4
$175.00
$700.00
$110 00
5440 00
397.00
S388 00
350 00
5200.00
18
4' dia. Manhole (MH 15176)
EA
1
53.000.00
33.000 00
52.400 00
$2.400.00
$2,362 00
52.362 00
$3,150 00
53,150 00
19
Street Patch (8 5" Concrete)
SY
1115
560.00
566.900.00
551 00
556.865 00
541 00
345.715 00
542.60
547.499.00
20
Concrete Driveway Approach Repair
SY
64
355.00
33.520.00
568 00
54.352.00
555 50
S3.552 00
375 00
54.800 00
21
Sidewalk (4" thick. PCC)
SY
5
340 00
5200.00
375 00
5375.00
335 00
$175.00
382.00
5410.00
22
Sidewalk (4" thick. Aggregated)
SY
5
560 00
5300 00
5115 00
$575.00
535.00
$175.00
$90 00
5450.00
23
Sidewalk Ramp (6" thick. Aggregated)
SY
9
5100 00
5900.00
$88 00
$792.00
$39.00
5351 00
5102 00
$918.00
24
Type S Curb (6" max)
LF
31
$25.00
$775.00
$38.00
51.178.00
$33.00
$1.023.00
340 00
01,240.00
25
Type A' Curb and Gutter (6" max)
LF
30
$25.00
$750.00
$40.00
31.200.00
529.00
$870.00
$30.00
$900.00
26
Type A Curb and Gutter (6 ")
LF
204
$25.00
$5,100.00
$22.00
$4,488.00
$22.00
$4,488.00
$25.60
$5.222.40
27
Straw Wattle
LF
147
$3.00
$441.00
$4.00
$588.00
35.00
$735.00
$5.00
3735.00
28
Stormwater Inlet Protection
EA
2
$200.00
$400.00
5100.00
$200.00
$216.00
$432.00
$100.00
$200.00
29
Seeding and Mulching
LS
1
$5,000.00
$5,000.00
$6,300.00
56,300.00
$4,262.00
34,262.00
$1,000.00
51.000.00
TOTAL BASE BID
$242,866.00
5210,728.00
5219,977.00
5239,351.40
% OVER/UNDER ENGINEER'S EST.
-13.2%
-9.4%
-1.4%
TOTAL CONTRACT WITH ACCEPTED ALTERNATES
5242,866.00
$210,728.00
5219,977.00
0239,351.40
Page 2
Date: Feb 19,'13
Bid No. 2659
CITY OF JEFFERSON
BID TABULATION
300BIk W. Ashley St. (Stormwater & Sanitary Sewer) and 700BIk Southwest Blvd. (Stormwater)
PROJECT NO. 33076
ITEM NO.
DESCRIPTION
UNIT
APPROX.
QUANTITY
Twehous Excavating
Company
Lehman Construction
Ed Laubinger Excavating
Sam Gaines Construction,
Inc.
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
UNIT
PRICE
AMOUNT
1
Mobilization
LS
1
55,300.00
55,300.00
513,000.00
513,000.00
530.000.00
530,000.00
53,000.00
53.000.00
2
Construction Signage /Traffic Control
EA
2
51,300.00
52,600.00
54,000.00
$8,000.00
$3.400.00
56,800.00
$4,000.00
58,000.00
3
Removals
LS
1
55,350.00
55,350.00
$9,000.00
$9,000.00
$18,000.00
518,000.00
$60,000.00
560,000.00
4
Rock Excavation
CY
50
5120.00
56.000.00
545.00
52,250.00
5175.00
58.750.00
5125.00
56,250.00
5
Subgrade Stabilization
TON
400
527.60
511,040.00
537 00
$14,800.00
$30.00
$12,000.00
540.00
516.000.00
6
Earthwork
LS
1
$1,600.00
$1,600.00
$10.000.00
$10,000.00
54.000.00
$4,000.00
545,000.00
545.000.00
7
08" dia. PVC
LF
46
539.00
$1.794.00
542.00
51,932.00
550.00
52,300.00
$40.00
51.840.00
8
15" dia. RCP Class III
LF
13
$50.00
$650.00
$100 00
$1,300 00
558.00
5754.00
$100.00
51.300 00
9
30" dia. RCP Class III
LF
438
5122 00
553,436.00
561.00
526.718.00
586.00
537.668.00
598 00
542,924.00
10
42" dia. RCP Class III
LF
133
5158.00
521,014.00
593 00
512.369.00
594 00
512.502.00
5110.00
514.630 00
11
4' x 4' Type A Inlet [C2)
EA
1
52.650.00
$2,650 00
$5.700.00
$5.700 00
53.000 00
53,000.00
$4.000 00
54.000.00
12
4' x 4' J -Box [C1)
EA
1
52.650 00
$2.650 00
54.500.00
54.500.00
$2.800.00
52.800.00
$3.500.00
53.500.00
13
4' x 5' J -Box [IA, 18)
EA
2
52,750.00
$5.500.00
54.700.00
59,400.00
53.200.00
56.400.00
53.800 00
$7.600 00
14
Sanitary Sewer Main (8" dia SDR 35)
LF
450
$75.50
$33.975.00
550.00
522.500.00
$68.00
$30.600.00
541 00
518,450.00
15
Sanitary Sewer Lateral (4 "dia. SCH 40)
LF
300
548 50
$14.550 00
540.00
512.000.00
538.00
511.400 00
530.00
$9.000 00
16
Clean out and Ex. SS Connection
EA
16
5650.00
510,400.00
5250 00
54.000 00
5700.00
$11.200 00
5200.00
53.200.00
17
Valve Box Covers
EA
4
542.00
5168.00
5400.00
51.600.00
565.00
$260.00
$100 00
$400 00
18
4' dia. Manhole (MH 15176)
EA
1
52.450.00
52.450 00
54.500 00
$4.500.00
52.600.00
52,600.00
$4.500.00
54.500.00
19
Street Patch (8.5" Concrete)
SY
1115
551 90
$57,868.50
575 00
$83.625 00
565.00
572,475.00
$38.00
542,370 00
20
Concrete Driveway Approach Repair
SY
64
550 00
$3.200 00
5117 00
57.488 00
$80.00
55.120 00
565.00
54.160 00
21
Sidewalk (4" thick. PCC)
SY
5
5133 00
$665.00
5510.00
$2,550.00
$70.00
5350.00
$50.00
5250.00
22
Sidewalk (4" thick. Aggregated)
SY
5
$13800
$690.00
$675.00
$3.375.00
$120 00
5600.00
$60.00
5300.00
23
Sidewalk Ramp (6" thick. Aggregated)
SY
9
585.00
5765.00
$300 00
52.700.00
5135.00
51.215.00
585.00
5765.00
24
Type S Curb (6" max)
LF
31
$45.00
51,395.00
550.00
51,550.00
525.00
5775.00
540.00
51,240.00
25
Type A' Curb and Gutter (6" max)
LF
30
$33.50
51,005.00
545.00
$1,350.00
$30.00
$900.00
532.00
5960.00
26
Type A Curb and Gutter (6 ")
LF
204
531.50
56,426.00
526.00
55,304.00
$30.00
56,120.00
$28.00
55,712.00
27
Straw Wattle
LF
147
$3.25
$477.75
54.25
5624.75
55.00
5735.00
$2.00
5294.00
28
Stormwater Inlet Protection
EA
2
$250.00
$500.00
5195.00
5390.00
550.00
5100.00
5100.00
5200.00
29
Seeding and Mulching
LS
1
51.150.00
$1,150.00
53,850.00
53,850.00
52,500.00
$2.500.00
51,200.00
51,200.00
TOTAL BASE BID
$255,269.25
5276,375.75
5291,924.00
5307,045.00
% OVER/UNDER ENGINEER'S EST.
5.1%
13.8%
20.2%
26.4%
TOTAL CONTRACT WITH ACCEPTED ALTERNATES
$255,269.25
$276,375.75
$291,924.00
$307,045.00
Page 3
Date: Feb 19,'13
Bid No. 2659
CITY OF JEFFERSON
BID TABULATION
300BIk W. Ashley St. (Stormwater & Sanitary Sewer) and 700131k Southwest Blvd. (Stormwater)
PROJECT NO. 33076
ITEM NO
DESCRIPTION
UNIT
APPROX.
QUANTITY
Sterling Excavating
UNIT
PRICE
AMOUNT
UNIT
PRICE AMOUNT
UNIT
PRICE AMOUNT
UNIT
PRICE AMOUNT
1
Mobilization
LS
1
$10,000.00
510,000.00
2
Construction Signage / Traffic Control
EA
2
512.000.00
524,000.00
3
Removals
LS
1
$46,000.00
$46.000.00
4
Rock Excavation
CY
50
5150.00
57,500.00
5
Subgrade Stabilization
TON
400
525.00
$10.000.00
6
Earthwork
LS
1
$2,500.00
$2,500 00
7
08" dia. PVC
LF
46
585.00
$3.910.00
8
15" dia. RCP Class III
LF
13
$97 50
51.267.50
9
30" dia. RCP Class III
LF
438
5117.00
551.246.00
10
42" dia. RCP Class III
LF
133
5166 00
522.078 00
11
4' x 4' Type A Inlet [C2]
EA
1
53.200.00
$3.200 00
12
4' x 4' J -Box [C1)
EA
1
53,000.00
53.000 00
13
4' x 5' J -Box [IA, IB]
EA
2
53,000.00
$6.000.00
14
Sanitary Sewer Main (8" dia. SDR 35)
LF
450
$84.00
537.800 00
15
Sanitary Sewer Lateral (4 "dia. SCH 40)
LF
300
$46.00
513,800.00
16
Clean out and Ex. SS Connection
EA
16
52,100 00
533,600.00
17
Valve Box Covers
EA
4
$100.00
5400.00
18
4' dia. Manhole (MH 15176)
EA
1
51,800 00
51.800.00
19
Street Patch (8.5" Concrete)
SY
1115
$77.00
585.855.00
20
Concrete Driveway Approach Repair
SY
64
580.00
55,120.00
21
Sidewalk (4" thick, PCC)
SY
5
$80.00
5400.00
22
Sidewalk (4" thick, Aggregated)
SY
5
$105.00
5525.00
23
Sidewalk Ramp (6" thick, Aggregated)
SY
9
$105.00
5945.00
24
Type S Curb (6" max)
LF
31
$35.00
51.085.00
25
Type A' Curb and Gutter (6" max)
LF
30
535.00
$1,050.00
26
Type A Curb and Gutter (6 ")
LF
204
530.00
56,120.00
27
Straw Wattle
LF
147
$10.00
$1,470.00
28
Stormwater Inlet Protection
EA
2
5600.00
$1,200.00
29
Seeding and Mulching
LS
1
54,600.00
54,600.00
TOTAL BASE BID
5386,471.50
% OVER/UNDER ENGINEER'S EST.
59.1%
TOTAL CONTRACT WITH ACCEPTED ALTERNATES
ERROR
5386,471.50