Loading...
HomeMy Public PortalAbout11-0511 NevilPermit No. City of ,ee Island • Community Develop. ..int Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 etL;/ Owner's Name ri Gen. Contractor 11.10k mum INTERNATIONAL CODECOUNCIC MEMBER Date Requested Date Needed Subcontractor Contact Information . Project Address ill/ -`2;/Z‘-,3/:.) AirL, Scope of Work / • Inspector Date of Inspection ,7.1- t- - Inspection Pass Fee Inspection I/ / • Pass - Fee Inspection Pass El Fail Fee Inspection Pass Fail Fee City of 1, ,ee Island • Community Develop .__. nt Dept. Inspection Report 403 Butler Ave. • P.Q. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 Permit No. I I' D S I I Owner's Name e '/ . ( Gen. Contractor L e Arrr Contact Information L C� S I• b 2• 0 ( (a Project Address Scope ofWork -CIoor,ra- /lf SJ cL,0✓l ,n47er,or, oo rS/ Q P G. Date Requested C - ! I 1 Date Needed 9-1c'H 1 Subcontractor IMIERNATIONAL CODE COUNCIL" MEMBER III 1 Seco,".4 A ✓P. Inspector 114 Inspection 1 n S u (0. , Q f� Date of Inspection Pass FairLi Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass Fail Fee Inspection Pass ❑ Fail ❑ Fee C0 ,.L.1,jrk 4 `N6\ City of i..ee Island • Community Develop. nt Dept. 0 tri►i r, Inspection Report 9 r ?gait 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 r ����� Phone 912.786.4573 ext. 114 • Fax 912.786.9539 {�-" INTERNATIONAL CODECOUNCIE MEMBER Permit No. Date Requested 1 Owner's Name e v . I Date Needed `7 - q - 1 1 Gen. Contractor L ° ^ Subcontractor 4-• L IeG , Contact Information ` ei 10 R2 -01(.0S Project Address I I ( e e ...3 A J lk Scope of Work f I f s, 1 n S u I • , n 1 . Ci..)o CS e leL Inspector '%/ q Date of Inspection -•/ /1/ 1 Inspection re D S r \ Q C Pass l J J Fee Inspection Pass El Fail ED Fee Inspection Pass Fail Fee Inspection Pass ❑ Fail ❑ Fee CITY OF TYBEE ISLAND BUILDING PERMIT ADDED SCOPE & VALUE DATE ISSUED: 09 -08 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION FLOORING/INSULATION/INT DRS /EL 1111 SECOND AVE J. L. NEVIL 5867 US HIGHWAY 301 S REGISTER GA 30452 -4900 912 - 786 -4849 L E ANDERSON CONSTRUCTION INC 635 NEWSOME LN STATESBORO GA 30461 P $ 135.00 $11,250.00 ADDED $4,000 FOR ADDITIONAL TILE WORK PERMIT #: 110511 TOTAL BALANCE DUE: $ 32.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org CITY OF TYBEE ISLAND BUILDING PERMIT ADDED SCOPE & VALUE DATE ISSUED: 09 -5 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION ADDED $2,000 FOR ELECTRICAL FLOORING /INSULATION /INT DRS /EL 1111 SECOND AVE J. L. NEVIL 5867 US HIGHWAY 301 S REGISTER GA 30452 -4900 912 - 786 -4849 L E ANDERSON CONSTRUCTION INC 635 NEWSOME LN STATESBORO GA 30461 P $ 103.00 $7,250.00 PERMIT #: 110511 TOTAL BALANCE DUE: $ 16.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org DATE ISSUED: 09 -4 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT FLOORING /INSULATION /INT DOORS 1111 SECOND AVE J. L. NEVIL 5867 US HIGHWAY 301 S REGISTER GA 30452 -4900 912 - 786 -4849 L E ANDERSON CONSTRUCTION INC 635 NEWSOME LN STATESBORO GA 30461 P $ 87.00 $5,250.00 PERMIT #: 110511 TOTAL BALANCE DUE: $ 87.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 ww .cityoftybee.org SEP- 01- 2011(THU) 13:07 TaliorPd Business Systems (FRX)8717000 P.005/008 CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT A ' Location: 1 /1 and Pve Owner .2r1 Architect or En • ineer Building r1 Contractor �.r1r3 d NAME PIN # ADDRESS 5 8G 7 1.11. 301 S0a4J43 &c. 3 U cl S f (Chtyk all that apply) • [' Repair ❑ Renovation • Minor Addition ❑ Substantial Addition ❑ Other Details of Project: LL r)e i ()see /a /ion 44*ot. 4r'�A' hc.ocrSer rrp /ar`e Chxe'c/ I s Estimated Cost of Construction: $ <2„4-6 _ Z 'o r4 ill "' TELEPHONE 6-30 -Tro 35 nec,Jsdme e. re. 9/0z- gL,krr) c, 3c' /s:) 6s? -Sz2 _ — DitO.J)s &NE, - rtrl t Residential ❑ Single Family ❑ Duplex ❑ Multi - Family [] Commercial 1Gia �.J ❑ Footprint Changes ❑ Discovery ❑ Demolition rep /ore /car- r..�ver%n j rn 2 h.eir rnavo,,, Construction Type _ j (I) Wood Frame (2) Wood & Masonry (3) Brick Veneer Proposed use: Remarks: (Enter appropriate number) (4) Masonry (5) Steel & Masonry (6) Other (please specify) 63-g -1( e4-,coo _coy 4- : Work ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the following intormation based on the construction drawings and site plan: # Units Lot Area # Off-street parking spaces Trees located & listed on site plan Access: Driveway (ft.) Setbacks: Front # Bedrooms #t I3athrooms Living space (total sq. ft.) With culvert? Rear With swalc? Sides (L) ...__ (R) _ 4 Stories Height _ Vertical distance measured from the average adjacent grade of the building to the extreme high point of the building, exclusive of chimneys, heating units, ventilation ducts: air conditioning units, elevators, and similar appurtances. SEP- 01- 2011(THU) 13:07 Taliored Business Systems (FRX)8717000 P.006/008 :During construction: On -siie restroom facilities will be provided through owner cgr hou is On -site waste and debris containers will he provided by Cry) fir" Construction debris will be disposed by CCnIThc,/,,I` by means of I understand that I must comply with zoning, flood damage control buildin lire shore protections and wetlands ordinances, f EMA regulations and all applicable codes and regulations. 1 understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements arc met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date; J -3v -•// Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The .0 110114i,tg is to be completed by City personnel: Zoning certification Approved rezoning /variance? Street address and number: New is it in compliance with City map? If not, has street name and /or number been reported to MI'C? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual findings) Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage NFIP Flood 'Gone Existing Approvals: Zoning Administrator Code Enforcement Officer Water /Sewer Stone /Drainage Inspections City Manager Signature Date FEES �] 4142 Permit , Inspections Water Tap Sewer Stub Aid to Const, TOTAL �2. SEP- 01- 2011(THU) 13:07 Tailored Business Systems (FRX)8717000 P.007/008 LEAD -BASED PAINT Adapted from http: / /www.epa.pov /lead /pubs /renvvation.htm. Please use that site to access the following information. Information for Property Owners of Rental Housing, Child- Occupied Facilities Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard information pamphlet Renovate Right: Important Lego Hszard Inforrnrtinn for. Families. Child rare Provider an�f Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample pre_renovation disclosure form may be used for this purpose. After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation, Repair and Remodeling rule. To become certified, property owners must Submit an application for firm certificetirm and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Property owners who perform renovation, repairs, and painting jobs in rental property should also: • Take training to learn how to perform lead-safe work practices. • Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 7010. • Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the sample recorrikeepinq checklist that EPA has developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010, Read about how to comply with EPA's rule in the i.PA Small Entity Compliance [wide. to Renovate Right. Read about how to use lead -safe work practices in EPA's Ste, tp Lead Safe Renovation. Renoir and Peintinu. Information for Homeowners Working at Home If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project, However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home and planning to do painting or rep airs, please read a copy of EPA's Renovate Right,: Important Lead Hazard Information for Families. Child Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800- 424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint. Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when is renovation job is performed in your home, or in the child care facility or school that your child attends. • Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants Sign a pre - renovation disclosure farm, which indicates that the tenant received the Renovate Right lead hazard information pamphlet. • Beginning in December 7008, the contractor must also make renovation information available to the parents or guardians of children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child care facilities and schools to be renovated a copy of EPA's Renovate Right: Irnnortant Lead Hai.nrd Infix -me ) for Families, .Ctlllil Giro Providers and Sch.Qg1_ lead laniard information pamphlet. Information for Contractors As a contractor, you play an important. rola in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation, repairs, and painting ,jobs in pre -1978 housing and child-occupied facilities must, before beginning work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important 1 earl Hazard Information for Families, Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's ore- renovation disclosure form may be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work practices. To become certified, renovation contractors must submit an application and tee payment to EPA. See: Application for firm certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application. Contractors who perform renovation, repairs, and painting jobs should also: • Take training to learn how to perform lead, safe work practices. • Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair, arid Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a Certified renovator. Click here for a list eli'rhle courses. • Provide a copy of your EPA or state lead training certificate to your client. • Tell your client what lead -safe methods you will use to perform the job. • Learn the lead laws that apply to you regarding certification and lead -sate work practices beginning in April 2010. • Ask your client to share the results of any previously conducted lead tests. • Provide your client with references from at least three recent jobs involving homes built before 1978. • Keep records to demonstrate that you and your workers have been trained in lead -sate work practices and that you followed lead - safe work practices on the job. To make recordkeeping easier, you may use the ;:amole recor'dkeeoing Cheri:klist that EPA has developed to help contractors comply with the renovation recordkeeping requirements. • Read about how to comply with EPA's rule in the EPA Srpall Entity Comeliance . hide to Renovate Right. ▪ Read about how to use d safe, work practices in EPA's Slaps ha Lead Safe Re,o.p.vation, Reimer anr(Paintina. FYOU'R fJOT E6r-'; r,'.Hilr.to. ISTURBING =JUST SIX SOUARf FEET (nutG(O TYOU BIG TiM —3v dSignature ate Printed Name SEP- 01- 2011(THU) 13:08 Talior.d Business Systems (FRX)871,7n00 P. 008 /008 Permit Acknowledgement of Asbestos /Environmental Notification to Georgia EPD for Proiects Involving Demolition, Wrecking, or Renovation h 'i'he undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission to the owner, owner's representative, or permit bolder to proceed with demolition, wrecking, or renovation of a structure prior to the filing of any required ten (111) day "Project Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia Environmental. Protection Division administers the rules. In most cases, the rules require both the owner and the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos t.nspector for materials that contain asbestos; and the removal of the asbestos before renovation, wrecking, or demolition begins almost without exemption. Georgia FPD requires a completed demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the building. Further guidance for regulatory compliance and contact telephone numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have EP.D regulations that could affect the project. J Undersigned Date e‘,5//a r c4r r, Printed Name Office Use Only: Project Address: Permit Number: Chatham County Board of Assessors: 71" 1 Property Record Card 4- 0006 -21 -000 Page 1 of 2011 Chatham County Board of Assessors Property Record Card APPRAISER MWTHOMAS LOT 70A WARD 3 TYBEE LAST INSP 12/02/2010 APPR ZONE 000008 SALES BOOK / INS VI QU RSN PRICE PAGE 01 Jul 1998 1950 239 NA I U UN GRANTOR:NEVIL JAMES LEMUEL, JR GRANTEE:LEMWOOD FARMS. L.L.L.P. PERMITS TYPE DATE AMOUNT 10 -0427 02 Dec 2010 Comp 2,600 10 -0429 02 Dec 2010 Comp 2,600 10 -0419 02 Dec 2010 Comp 1,575 COMMENTS: 4- 0006- 21 -00f. 1111 2ND AVE TYBEE ISLANE LEMWOOD FARMS L L L P CAMA ASMT 5867 US HIGHWAY 301 S 161,200 161,200 LAND 1 REGISTER GA 30452 -4900 126,500 126,500 BLDG 1 OBXF 0 287,700 287,700 Cost - MS [Click or larger picture CODES PROPERTY 0006 RESIDENTIAL USE UTA 0004 Tybee Island NBHD 020225.00 T225 TYBEE INNER EXEMPTIONS HISTORY LAND IMPR TOTAL 2011 161,200 126,500 287,700 Cama 2010 282,000 178,500 460,500 MAV 2009 282,000 178,500 460,500 Over 2008 282,000 178,500 460,500 Cama 2007 282,000 158,000 440,000 Cama 2006 282,000 145,500 427,500 Came 2005 150,000 187,000 337,000 Came 2004 89,500 211,500 301,000 Came 2003 71,000 135,500 206,500 Came 2002 71,000 135,500 206,500 Came 2001 74,500 137,000 211,500 Came 2000 55,000 113,500 168,500 Came 1999 31,500 113,500 145,000 Came 1998 31,500 113,000 144,500 Came 1997 31,500 106,500 138,000 Came 1996 15,000 97,400 112,400 Came 1995 15,000 120,590 135,590 Came 1994 15,000 100,580 115,580 Came 1993 15,000 63,490 78,490 Over 1992 15,000 63,490 78,490 Over LAND ID# USE DESC FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE 109901 SINGLE FAMILY RES 60 79 4,740.00 -SF 34.00 R2 161200 I t -p5.11 > 5, 2 S o http: //boa. chathamcounty. org /DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard.aspx... 9/4/201 907 21 Porch Screen 907 I Porch Screen P9 2 Chatham County Board of Assessors: 7 ^1 1 Property Record Card 4- 0006 -21 -009 Page 2 of 2011 Chatham County Board of Assessors Property Record Card 4- 0006- 21 -00E 1111 2ND AVE TYBEE ISLANE BUILDING SECTION CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV r3/0 TOTAL DEP % RCNLD U.FACTOR MKT VAL 85482 -1 Residential 171,931 1940 1980 MS 36.00 0.00 0.00 0.00 36.00 110,036 126,500 2 Enclose Enclose 9' 2 23' 5 Slob oot 35 Walls [Click for larger picture] SECTION TYPE 1 - Main AREA 2340 TYPE 1 - Single- family Residence FRAME 1 - Stud Frame STYLE 2 - Two Story QUALITY 3.00 CONDITION 3.00 # UNITS 0 # OF BEDS / BATHS 3 / 3.00 COMPONENTS R1 108 Frame, Siding, Wood R2 208 Composition Shingle R3 352 Heat Pump R4 402 Automatic Floor Cover Allowance R6 601 Plumbing Fixtures ( #) R6 602 Plumbing Rough -ins ( #) R6 622 Raised Subfloor (% or SF) R6 641 Single 1 -Story Fireplace ( #) R7 721 Carport, Flat Roof (SF) R11 904 Slab Porch (SF) with Roof R11 907 Enclosed Porch (SF), Screened Walls R11 907 Enclosed Porch (SF), Screened Walls R11 909 Enclosed Porch (SF), Solid Walls R11 909 Enclosed Porch (SF), Solid Walls Units % QUAL 100.00 100.00 100.00 11.00 1.00 1.00 569.00 35.00 189.00 189.00 117.00 276.00 100.00 httn: // boa. chathamcounty. ora/D esktonModul es /ChathamCounty /B oardofAs ses sors /PronertvRecordCard. asnx... 9/4/20