HomeMy Public PortalAbout11-0511 NevilPermit No.
City of ,ee Island • Community Develop. ..int Dept.
Inspection Report
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
etL;/
Owner's Name ri
Gen. Contractor
11.10k
mum
INTERNATIONAL
CODECOUNCIC
MEMBER
Date Requested
Date Needed
Subcontractor
Contact Information .
Project Address ill/ -`2;/Z‘-,3/:.) AirL,
Scope of Work / •
Inspector Date of Inspection ,7.1-
t- -
Inspection Pass Fee
Inspection
I/ /
•
Pass - Fee
Inspection Pass El Fail Fee
Inspection Pass Fail Fee
City of 1, ,ee Island • Community Develop .__. nt Dept.
Inspection Report
403 Butler Ave. • P.Q. Box 2749 • Tybee Island, GA 31328
Phone 912.786.4573 ext. 114 • Fax 912.786.9539
Permit No. I I' D S I I
Owner's Name e '/ . (
Gen. Contractor L e Arrr
Contact Information L C� S I• b 2• 0 ( (a
Project Address
Scope ofWork -CIoor,ra- /lf SJ cL,0✓l ,n47er,or, oo rS/ Q P G.
Date Requested C - ! I 1
Date Needed 9-1c'H 1
Subcontractor
IMIERNATIONAL
CODE COUNCIL"
MEMBER
III 1 Seco,".4 A ✓P.
Inspector 114
Inspection 1 n S u (0. , Q f�
Date of Inspection
Pass
FairLi Fee
Inspection Pass ❑ Fail ❑ Fee
Inspection Pass Fail Fee
Inspection Pass ❑ Fail ❑ Fee
C0 ,.L.1,jrk 4
`N6\ City of i..ee Island • Community Develop. nt Dept. 0 tri►i
r, Inspection Report 9 r ?gait
403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 r �����
Phone 912.786.4573 ext. 114 • Fax 912.786.9539 {�-" INTERNATIONAL
CODECOUNCIE
MEMBER
Permit No.
Date Requested 1
Owner's Name e v . I Date Needed `7 - q - 1 1
Gen. Contractor L ° ^ Subcontractor 4-• L IeG ,
Contact Information ` ei 10 R2 -01(.0S
Project Address I I ( e e ...3 A J lk
Scope of Work f I f s, 1 n S u I • , n 1 . Ci..)o CS e leL
Inspector '%/ q Date of Inspection -•/ /1/ 1
Inspection re D S r \ Q C Pass l J
J Fee
Inspection Pass El Fail ED Fee
Inspection Pass Fail Fee
Inspection Pass ❑ Fail ❑ Fee
CITY OF TYBEE ISLAND
BUILDING PERMIT
ADDED SCOPE & VALUE
DATE ISSUED: 09 -08 -2011
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
FLOORING/INSULATION/INT DRS /EL
1111 SECOND AVE
J. L. NEVIL
5867 US HIGHWAY 301 S
REGISTER GA 30452 -4900
912 - 786 -4849
L E ANDERSON CONSTRUCTION INC
635 NEWSOME LN
STATESBORO GA 30461
P
$ 135.00
$11,250.00
ADDED $4,000 FOR ADDITIONAL TILE WORK
PERMIT #: 110511
TOTAL BALANCE DUE: $ 32.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
CITY OF TYBEE ISLAND
BUILDING PERMIT
ADDED SCOPE & VALUE
DATE ISSUED: 09 -5 -2011
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
ADDED $2,000 FOR ELECTRICAL
FLOORING /INSULATION /INT DRS /EL
1111 SECOND AVE
J. L. NEVIL
5867 US HIGHWAY 301 S
REGISTER GA 30452 -4900
912 - 786 -4849
L E ANDERSON CONSTRUCTION INC
635 NEWSOME LN
STATESBORO GA 30461
P
$ 103.00
$7,250.00
PERMIT #: 110511
TOTAL BALANCE DUE: $ 16.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
DATE ISSUED: 09 -4 -2011
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE
TOTAL FEES CHARGED
PROPERTY IDENTIFICATION #
PROJECT VALUATION
CITY OF TYBEE ISLAND
BUILDING PERMIT
FLOORING /INSULATION /INT DOORS
1111 SECOND AVE
J. L. NEVIL
5867 US HIGHWAY 301 S
REGISTER GA 30452 -4900
912 - 786 -4849
L E ANDERSON CONSTRUCTION INC
635 NEWSOME LN
STATESBORO GA 30461
P
$ 87.00
$5,250.00
PERMIT #: 110511
TOTAL BALANCE DUE: $ 87.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire,
soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including
all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted
work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided
unless work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
ww .cityoftybee.org
SEP- 01- 2011(THU) 13:07 TaliorPd Business Systems
(FRX)8717000 P.005/008
CITY OF TYBEE ISLAND, GEORGIA
APPLICATION FOR BUILDING PERMIT
A
'
Location: 1 /1 and Pve
Owner
.2r1
Architect
or En • ineer
Building r1
Contractor �.r1r3 d
NAME
PIN #
ADDRESS
5 8G 7 1.11. 301 S0a4J43
&c. 3 U cl S f
(Chtyk all that apply) •
[' Repair
❑ Renovation
• Minor Addition
❑ Substantial Addition
❑ Other
Details of Project: LL
r)e i ()see /a /ion 44*ot. 4r'�A' hc.ocrSer rrp /ar`e Chxe'c/ I s
Estimated Cost of Construction: $ <2„4-6 _ Z 'o r4 ill "'
TELEPHONE
6-30 -Tro
35 nec,Jsdme e. re. 9/0z-
gL,krr) c, 3c' /s:) 6s? -Sz2 _
— DitO.J)s &NE, - rtrl t
Residential
❑ Single Family
❑ Duplex
❑ Multi - Family
[] Commercial
1Gia �.J
❑ Footprint Changes
❑ Discovery
❑ Demolition
rep /ore /car- r..�ver%n j rn 2 h.eir rnavo,,,
Construction Type _ j
(I) Wood Frame
(2) Wood & Masonry
(3) Brick Veneer
Proposed use:
Remarks:
(Enter appropriate number)
(4) Masonry
(5) Steel & Masonry
(6) Other (please specify)
63-g -1( e4-,coo _coy 4- : Work
ATTACH A COPY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the
following intormation based on the construction drawings and site plan:
# Units
Lot Area
# Off-street parking spaces
Trees located & listed on site plan
Access:
Driveway (ft.)
Setbacks: Front
# Bedrooms #t I3athrooms
Living space (total sq. ft.)
With culvert?
Rear
With swalc?
Sides (L) ...__ (R) _
4 Stories Height _ Vertical distance measured from the average adjacent
grade of the building to the extreme high point of the building, exclusive of chimneys, heating
units, ventilation ducts: air conditioning units, elevators, and similar appurtances.
SEP- 01- 2011(THU) 13:07 Taliored Business Systems
(FRX)8717000 P.006/008
:During construction:
On -siie restroom facilities will be provided through owner cgr hou is
On -site waste and debris containers will he provided by Cry) fir"
Construction debris will be disposed by CCnIThc,/,,I` by means of
I understand that I must comply with zoning, flood damage control buildin lire shore
protections and wetlands ordinances, f EMA regulations and all applicable codes and regulations.
1 understand that the lot must be staked out and that the stakes will be inspected to ensure that the
setback requirements arc met. I understand also that a certified plot plan showing elevation must
be attached to this application and that an as -built elevation certification is due as soon as the
habitable floor level is established. Drainage: I realize that I must ensure the adequacy of
drainage of this property so that surrounding property is in no way adversely affected. I accept
responsibility for any corrective action that may be necessary to restore drainage impaired by this
permitted construction.
Date; J -3v -•//
Signature of Applicant:
Note: A permit normally takes 7 to 10 days to process.
The .0 110114i,tg is to be completed by City personnel:
Zoning certification
Approved rezoning /variance?
Street address and number: New
is it in compliance with City map?
If not, has street name and /or number been reported to MI'C?
FEMA Certification attached
State Energy Code Affidavit attached
Utilities and Public Works:
Describe any unusual findings)
Access to building site
Distance to water main tap site
Distance to sewer stub site
Water meter size
Storm drainage
NFIP Flood 'Gone
Existing
Approvals:
Zoning Administrator
Code Enforcement Officer
Water /Sewer
Stone /Drainage
Inspections
City Manager
Signature
Date
FEES �]
4142
Permit ,
Inspections
Water Tap
Sewer Stub
Aid to Const,
TOTAL
�2.
SEP- 01- 2011(THU) 13:07 Tailored Business Systems (FRX)8717000 P.007/008
LEAD -BASED PAINT
Adapted from http: / /www.epa.pov /lead /pubs /renvvation.htm. Please use that site to access the following information.
Information for Property Owners of Rental Housing, Child- Occupied Facilities
Property owners who renovate, repair, or prepare surfaces for painting in pre -1978 rental housing or space
rented by child -care facilities must, before beginning work, provide tenants with a copy of EPA's lead hazard
information pamphlet Renovate Right: Important Lego Hszard Inforrnrtinn for. Families. Child rare Provider
an�f Schools. Owners of these rental properties must document compliance with this requirement. EPA's sample
pre_renovation disclosure form may be used for this purpose.
After April 22, 2010, property owners who perform these projects in pre -1978 rental housing or space rented
by child -care facilities must be certified and follow the lead -safe work practices required by EPA's Renovation,
Repair and Remodeling rule. To become certified, property owners must Submit an application for firm
certificetirm and fee payment to EPA. The Agency has up to 90 days after receiving a complete request for
certification to approve or disapprove the application.
Property owners who perform renovation, repairs, and painting jobs in rental property should also:
• Take training to learn how to perform lead-safe work practices.
• Learn the lead laws that apply regarding certification and lead -safe work practices beginning in April 7010.
• Keep records to demonstrate that you and your workers have been trained in lead -safe work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the sample recorrikeepinq checklist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements that took effect April 2010,
Read about how to comply with EPA's rule in the i.PA Small Entity Compliance [wide. to Renovate Right.
Read about how to use lead -safe work practices in EPA's Ste, tp Lead Safe Renovation. Renoir and Peintinu.
Information for Homeowners Working at Home
If you are a homeowner performing renovation, repair, or painting work in your own home, EPA's RRP rule does not cover your project,
However, you have the ultimate responsibility for the safety of your family or children in your care. If you are living in a pre -1978 home
and planning to do painting or rep airs, please read a copy of EPA's Renovate Right,: Important Lead Hazard Information for Families. Child
Care Providers, and Schools lead hazard information pamphlet. You may also want to call the National Lead Information Center at 1 -800-
424 -LEAD (5323) and ask for more information on how to work safely in a home with lead -based paint.
Information for Tenants and Families of Children under Age 6 in Child Care Facilities and Schools
As a tenant or a parent or guardian of children in a child care facility or school, you should know your rights when is renovation job is
performed in your home, or in the child care facility or school that your child attends.
• Before starting a renovation in residential buildings built before 1978, the contractor or property owner is required to have tenants
Sign a pre - renovation disclosure farm, which indicates that the tenant received the Renovate Right lead hazard information
pamphlet.
• Beginning in December 7008, the contractor must also make renovation information available to the parents or guardians of
children under age six that attend child care facilities and schools, and to provide to owners and administrators of pre -1978 child
care facilities and schools to be renovated a copy of EPA's Renovate Right: Irnnortant Lead Hai.nrd Infix -me ) for Families, .Ctlllil
Giro Providers and Sch.Qg1_ lead laniard information pamphlet.
Information for Contractors
As a contractor, you play an important. rola in helping to prevent lead exposure. Ordinary renovation and maintenance activities can create
dust that contains lead. By following the lead -safe work practices, you can prevent lead hazards. Contractors who perform renovation,
repairs, and painting ,jobs in pre -1978 housing and child-occupied facilities must, before beginning work, provide owners, tenants, and
child -care facilities with a copy of EPA's lead hazard information pamphlet Renovate Right: Important 1 earl Hazard Information for Families,
Child Care Providers, and Schools. Contractors must document compliance with this requirement. EPA's ore- renovation disclosure form may
be used for this purpose. Understand that after April 22, 2010, federal law will require you to be certified and to use lead -safe work
practices. To become certified, renovation contractors must submit an application and tee payment to EPA. See: Application for firm
certification. The Agency has up to 90 days after receiving a complete request for certification to approve or disapprove the application.
Contractors who perform renovation, repairs, and painting jobs should also:
• Take training to learn how to perform lead, safe work practices.
• Find a training provider that has been accredited by EPA to provide training for renovators under EPA's Renovation, Repair,
arid Painting (RRP) Program. Please note that if you previously completed an eligible renovation training course you may
take the 4 -hour refresher course instead of the 8 -hour initial course from an accredited training provider to become a
Certified renovator. Click here for a list eli'rhle courses.
• Provide a copy of your EPA or state lead training certificate to your client.
• Tell your client what lead -safe methods you will use to perform the job.
• Learn the lead laws that apply to you regarding certification and lead -sate work practices beginning in April 2010.
• Ask your client to share the results of any previously conducted lead tests.
• Provide your client with references from at least three recent jobs involving homes built before 1978.
• Keep records to demonstrate that you and your workers have been trained in lead -sate work practices and that you followed lead -
safe work practices on the job. To make recordkeeping easier, you may use the ;:amole recor'dkeeoing Cheri:klist that EPA has
developed to help contractors comply with the renovation recordkeeping requirements.
• Read about how to comply with EPA's rule in the EPA Srpall Entity Comeliance . hide to Renovate Right.
▪ Read about how to use d safe, work practices in EPA's Slaps ha Lead Safe Re,o.p.vation, Reimer anr(Paintina.
FYOU'R fJOT
E6r-'; r,'.Hilr.to.
ISTURBING
=JUST SIX
SOUARf FEET
(nutG(O TYOU
BIG TiM
—3v dSignature ate
Printed Name
SEP- 01- 2011(THU) 13:08
Talior.d Business Systems
(FRX)871,7n00 P. 008 /008
Permit Acknowledgement of
Asbestos /Environmental Notification to Georgia EPD for
Proiects Involving Demolition, Wrecking, or Renovation
h
'i'he undersigned hereby acknowledges that the issuance of this permit does not in any way grant
permission to the owner, owner's representative, or permit bolder to proceed with demolition,
wrecking, or renovation of a structure prior to the filing of any required ten (111) day "Project
Notification for Asbestos Renovation Encapsulation or Demolition" form in accordance with
the Georgia Asbestos Rules. The Georgia Environmental. Protection Division administers the
rules. In most cases, the rules require both the owner and the involved contractors to assure the
portion of the building involved in the project is thoroughly inspected by an Accredited Asbestos
t.nspector for materials that contain asbestos; and the removal of the asbestos before renovation,
wrecking, or demolition begins almost without exemption. Georgia FPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is
present in the building. Further guidance for regulatory compliance and contact telephone
numbers are provided by the brochures entitled Asbestos & Renovation and Asbestos and
Demolition. Other environmental issues such as asbestos removal techniques, lead abatement,
ground contamination, or unusual site conditions may have EP.D regulations that could affect the
project.
J
Undersigned Date
e‘,5//a r c4r r,
Printed Name
Office Use Only:
Project Address:
Permit Number:
Chatham County Board of Assessors: 71" 1 Property Record Card 4- 0006 -21 -000 Page 1 of
2011 Chatham County Board of Assessors
Property Record Card
APPRAISER MWTHOMAS LOT 70A WARD 3 TYBEE
LAST INSP 12/02/2010
APPR ZONE 000008
SALES BOOK / INS VI QU RSN PRICE
PAGE
01 Jul 1998 1950 239 NA I U UN
GRANTOR:NEVIL JAMES LEMUEL, JR
GRANTEE:LEMWOOD FARMS. L.L.L.P.
PERMITS TYPE DATE AMOUNT
10 -0427 02 Dec 2010 Comp 2,600
10 -0429 02 Dec 2010 Comp 2,600
10 -0419 02 Dec 2010 Comp 1,575
COMMENTS:
4- 0006- 21 -00f.
1111 2ND AVE TYBEE ISLANE
LEMWOOD FARMS L L L P CAMA ASMT
5867 US HIGHWAY 301 S 161,200 161,200 LAND 1
REGISTER GA 30452 -4900 126,500 126,500 BLDG 1
OBXF 0
287,700 287,700 Cost - MS
[Click
or larger picture
CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA 0004 Tybee Island
NBHD 020225.00 T225 TYBEE
INNER
EXEMPTIONS
HISTORY LAND IMPR TOTAL
2011 161,200 126,500 287,700 Cama
2010 282,000 178,500 460,500 MAV
2009 282,000 178,500 460,500 Over
2008 282,000 178,500 460,500 Cama
2007 282,000 158,000 440,000 Cama
2006 282,000 145,500 427,500 Came
2005 150,000 187,000 337,000 Came
2004 89,500 211,500 301,000 Came
2003 71,000 135,500 206,500 Came
2002 71,000 135,500 206,500 Came
2001 74,500 137,000 211,500 Came
2000 55,000 113,500 168,500 Came
1999 31,500 113,500 145,000 Came
1998 31,500 113,000 144,500 Came
1997 31,500 106,500 138,000 Came
1996 15,000 97,400 112,400 Came
1995 15,000 120,590 135,590 Came
1994 15,000 100,580 115,580 Came
1993 15,000 63,490 78,490 Over
1992 15,000 63,490 78,490 Over
LAND
ID# USE DESC FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
109901 SINGLE FAMILY RES 60 79 4,740.00 -SF 34.00 R2 161200
I t -p5.11
> 5, 2 S o
http: //boa. chathamcounty. org /DesktopModules/ ChathamCounty / BoardofAssessors /PropertyRecordCard.aspx... 9/4/201
907 21
Porch Screen
907
I Porch Screen
P9 2
Chatham County Board of Assessors: 7 ^1 1 Property Record Card 4- 0006 -21 -009 Page 2 of
2011 Chatham County Board of Assessors
Property Record Card
4- 0006- 21 -00E
1111 2ND AVE TYBEE ISLANE
BUILDING SECTION CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV r3/0 TOTAL DEP % RCNLD U.FACTOR MKT VAL
85482 -1 Residential 171,931 1940 1980 MS 36.00 0.00 0.00 0.00 36.00 110,036 126,500
2
Enclose
Enclose
9'
2
23'
5
Slob oot
35
Walls
[Click for larger picture]
SECTION TYPE 1 - Main
AREA 2340
TYPE 1 - Single- family Residence
FRAME 1 - Stud Frame
STYLE 2 - Two Story
QUALITY 3.00
CONDITION 3.00
# UNITS 0
# OF BEDS / BATHS 3 / 3.00
COMPONENTS
R1 108 Frame, Siding, Wood
R2 208 Composition Shingle
R3 352 Heat Pump
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #)
R6 602 Plumbing Rough -ins ( #)
R6 622 Raised Subfloor (% or SF)
R6 641 Single 1 -Story Fireplace ( #)
R7 721 Carport, Flat Roof (SF)
R11 904 Slab Porch (SF) with Roof
R11 907 Enclosed Porch (SF), Screened Walls
R11 907 Enclosed Porch (SF), Screened Walls
R11 909 Enclosed Porch (SF), Solid Walls
R11 909 Enclosed Porch (SF), Solid Walls
Units % QUAL
100.00
100.00
100.00
11.00
1.00
1.00
569.00
35.00
189.00
189.00
117.00
276.00
100.00
httn: // boa. chathamcounty. ora/D esktonModul es /ChathamCounty /B oardofAs ses sors /PronertvRecordCard. asnx... 9/4/20