HomeMy Public PortalAboutTS CHU TE_12.pdfDATE ISSUED: 12 -13 -2013
WORK DESCRIPTION
WORK LOCATION
OWNER NAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
CITY OF TYBEE ISLAND
BUILDING PERMIT
REROOF - SHINGLES
12 CHU TERRACE
JULIUS E. HOWELL
125 FARRINGTON CT
FAYETTEVILLE GA 30215
ACE ROOFING & REMODELING INC
5256 HWY 80 E
ELLABELL GA 31308
FLOOD ZONE
BUILDING VALUATION
SQUARE FOOTAGE
OCCUPANCY TYPE P
TOTAL FEES CHARGED $ 80.00
PROPERTY IDENTIFICATION #
PROJECT VALUATION $3,900.00
PERMIT #: 130785
TOTAL BALANCE DUE: $ 80.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless
work has begun within six months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328
(912) 786 -4573 - FAX (912) 786 -9539
www.cityoftybee.org
Dec, 13. 2013 10 :59A1 DORSEY TIRE & AUTO CARE No, 8313 P. 1
/3 -.074C
City of Tybee Island, Georgia
912- 472 -5030 • Fax 912 - 786 -9539
APPLICATION FOR BUILDING PERMIT
Property Address: I . duo
fS
PIN: 4-080/- 03 - e)/61
N- Single Family
❑ Duplex
❑ Multi - Family units
❑ " Commercial unit(s)
Check all that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: (V C) S4--Z —tom (� a_4(.(3/
,L4-,41ca co Kr .
Estimated Cost of Construction: $ / `7 00(materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
.a
Year Built: /9,r 5� isted on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -s troomcfa�tiesrvuill be provided through . Construction debris will be disposed
b- l' 1L by means of derstand that I must comply with zoning, flood
damage control, bullding, fire, s are protection and wetland ordinances. FEMA regulations and all aoplicle codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date: /c -13 13 Signature'
Printed Name of Applicant:
Note: Aj ermit normally takes 7 to 10
historic structure may be fonder.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm/Drainage
City Manager
Ow to process. _Processing time for a
L
-43-13
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Name
Mal,
Ing Address
Telephone
Owner
FICAL-16''CC
a
t-S (
,U..4 - 7-y-w. 61,
Home
Cell: L/
f-
'-9)Z
Architect or
Engineer
Office:
Cell:
Contractor
Acs
1 L
)4c)1 % C)''rC1
, (, 4%F,y\ C-7)4- ` 1 /)
Office:3
cell: (Q,
ti, -- '
7-- t
g
N- Single Family
❑ Duplex
❑ Multi - Family units
❑ " Commercial unit(s)
Check all that apply
❑ Discovery/Tearout
❑ Footprint Changes
❑ additional square
feet heated /cooled
❑ Demolition or Relocation
❑ Other
* A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license. A commercial project may require Site Plan Approval.
Details of Project: (V C) S4--Z —tom (� a_4(.(3/
,L4-,41ca co Kr .
Estimated Cost of Construction: $ / `7 00(materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate and /or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and /or a site plan may be required.
.a
Year Built: /9,r 5� isted on National Historic Register or located within a National Historic District? Y / N
• Buildings older than 50 years may be eligible to be listed on the State / National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -s troomcfa�tiesrvuill be provided through . Construction debris will be disposed
b- l' 1L by means of derstand that I must comply with zoning, flood
damage control, bullding, fire, s are protection and wetland ordinances. FEMA regulations and all aoplicle codes and
regulations. I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction.
Date: /c -13 13 Signature'
Printed Name of Applicant:
Note: Aj ermit normally takes 7 to 10
historic structure may be fonder.
Approvals:
Planning & Zoning Manager
Building Official
Water /Sewer
Storm/Drainage
City Manager
Ow to process. _Processing time for a
L
-43-13
FEES
Permit
Inspections
Cap. Cost Rec.
Water Tap
Sewer Stub
Eng. Fees
Aid to Const.
TOTAL
Dec, 13. 2013 11:00A1 DORSEY TIRE & AUTO CARE No. 8313 P. 2
LEAD -BASED PAINT RRP RULES
Ordinary renovation and maintenance activities can create dust that contains lead. Contractors who perform
renovation, repairs, and painting jobs in pre -1978 housing and child- occupied facilities must, before beginning
work, provide owners, tenants, and child -care facilities with a copy of EPA's lead hazard information pamphlet
Renovate Right important Lead Hazard information for Families, Child Care Providers, and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead -safe work practices. Georgia Environmental Protection Division Lead -Based
Paint and Asbestos Program (404) 363 -7026.
Projects must be done by a Certified Lead Renovation Firm AND a Certified Renovator
When disturbing lead -based painted or coated surfaces or components more than B fiZ per interior
room or 20 ft2 of exterior surfaces AND all window replacements and partial demolitions of any size.
* * * * * * * * * * * * * * * * * * **
Asbestos /Environmental Notification to Georgia EPD for
Prolects Involving Demolition, Wrecking, or Renovation
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "Project Notification for Asbestos Renovation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption. Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building. Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos & Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
BMPs
While BMP deficiencies are not necessarily the fault of the owner or his agent, BMPs are their responsibility.
Two areas of deficiencies are in the most basic and common BMPs; Co — Construction Exit and Sd1 —
Sediment Barrier. Correct installation information can be found in the Field Manual for Erosion and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Soil and Water Conservation Commission;
http://www.gaswcc.org/docs/field_manual_Aled.pdf.
Problems with the Co is not limited to the installation, but to material. The stone will be a representation of
1.5 " -3.5" stone or larger.
Type A sediment barriers have been installed where Type C is required and shown on the permit drawings.
Where two rows are called for they will be installed with a separation that allows for the first one to fail (fall
over) without impacting the second one. The complete assembly and installation must be compliant; steel or
wood posts, post spacing, Type C or A.
Si nature for
ceipt of Lead Pint Asbestos, and BMP notices
Printed Name
)3 -j --l3
Date
Chatham County Board of Assessors: 2013 Property Record Card 4- 0009 -03 -010 Page 1 of 2
2013 Chatham County Board of Assessors
Property Record Card
4- 0009 -03 -010
12 T S CHU TER TYBEE ISLAND
APPRAISER jlmarine
LAST INSP 06/08/2007
APPR ZONE 000008
LOT 8 SUB 104 WD 5 TYBEE
HOWELL JULIUS EDWARD JR & CAROLYN R*
141 MCCARD LAKE RD
M EANSV I LLE GA 30256 -2304
CAMA ASMT
131,600 131,600 LAND 1
73,300 73,300 BLDG 1
200 200 OBXF 1
205,100 205,100 Cost - MS
SALES BOOK/ INS VI QU RSN PRICE
PAGE
23 Aug 1995 174F 0708 WD I U U5 65,000
GRANTOR:HOWELL JULIUS E SR
GRANTEE:HOWELL JULIUS E JR & CARO
COMMENTS:
07 Apr 2010
15 Jun 2000
02 Nov 1995
ADD UPDATED PER OWNER
ADD CHG LTR 6 -15 -2000 SSB
TY96 SURVS
EXTRA FEATURES
ID# BLDG # SYSTEM DESC DIM 1 DIM 2 UNITS QL UNIT PRICE RCN AYB EYB DT ECON FUNC SP SP% RCNLD MKT VALUE
140270 86281 WOOD DECK AV 17 4 68.00 A 16.47 1,120 1985 1985 2R 224 200
[Click for larger picture]
GAG'S
1140:$.4.-4''''' Chatham County
Tax Commissioner
Property Tax Statement
CODES
PROPERTY 0006 RESIDENTIAL
USE
UTA 0004 Tybee Island
NBHD 020213.00 T213 TYBEE BTL
BEACH
EXEMPTIONS
HISTORY LAND IMPR TOTAL
2012 131,600 48,300 179,900 Cama
2011 131,600 45,900 177,500 Cama
2010 278,000 47,500 325,500 MAV
2009 278,000 47,500 325,500 Over
2008 427,500 52,000 479,500 Cama
2007 427,500 51,500 479,000 Cama
2006 454,500 39,500 494,000 Cama
2005 193,000 57,500 250,500 Cama
2004 164,000 59,000 223,000 Cama
2003 164,000 59,000 223,000 Cama
2002 121,500 59,000 180,500 Cama
2001 126,500 58,000 184,500 Cama
2000 126,500 58,000 184,500 Cama
1999 50,000 58,000 108,000 Cama
1998 50,000 57,000 107,000 Cama
1997 50,000 53,000 103,000 Cama
1996 18,120 59,780 77,900 Cama
1995 18,120 61,440 79,560 Cama
1994 18,120 49,690 67,810 Cama
1993 18,120 30,080 48,200 Over
1992 18,120 30,080 48,200 Over
LAND
ID# USE DESC
FRONT DEPTH UNITS / TYPE PRICE ZONING LCTN TOPO OTHER ADJ1 ADJ2 ADJ3 ADJ4 MKT VALUE
1110810 SINGLE FAMILY RES 47 70 3,290.00 -SF 40.00 C1 131600
http: //boa. chathamcounty. org/ DesktopModules /ChathamCountyBoardofAssessors /Prope... 12/13/2013
Chatham County Board of Assessors: 2013 Property Record Card 4- 0009 -03 -010 Page 2 of 2
2013 Chatham County Board of Assessors
Property Record Card
4- 0009 -03 -010
12 T S CHU TER TYBEE ISLAND
BUILDING SECTION
86281 -1 -2013
CONSTRUCTION TYPE RCN AYB EYB DEP TYPE PHYS ECON FUNC OBSV / % TOTAL DEP % RCNLD U.FACTOR MKT VAL
Residential 73,215 1985 MS 31.00 0.00 0.00 0.00 31.00 50,518 73,300
24'
[Click for larger picture]
SECTION TYPE 1 - Main
AREA 864
TYPE 1 - Single- family Residence
FRAME 1 - Stud Frame
STYLE 1 - One Story
QUALITY 3.00
CONDITION 3.00
# UNITS 0
# OF BEDS / BATHS 2 / 1.00
COMPONENTS
Rf 108 Frame, Siding, Wood
R2 208 Composition Shingle
R3 352 Heat Pump
R4 402 Automatic Floor Cover Allowance
R6 601 Plumbing Fixtures ( #)
R6 602 Plumbing Rough -ins ( #)
R6 622 Raised Subfloor (% or SF)
R11 904 Slab Porch (SF) with Roof
Units % QUAL
100.00
100.00
100.00
5.00
1.00
100.00
168.00
http: // boa. chathamcounty. org /DesktopModules/ ChathamCounty /BoardofAssessors /Prope... 12/13/2013