Loading...
HomeMy Public PortalAbout11-0515 TowlerPermit No. City of 403 Butler Phone i ee Island • Community Develop,__..nt Dept. Inspection Report Ave. • P.O. Box 2749 • Tybee Island, GA 31328 912.786.4573 ext. 114 • Fax 912.786.9539 Owner's Name Gen. Contractor Information Project Address I N Date Requested Date Needed Subcontractor sunalk INTERNATIONAL CODE COUNCIL' MEMBER 1 >` Scope of Work ; r I:. Inspector 2 /71 Inspection Date of Inspection ez Pass El Fal Inspection �Z,�•VY�I Inspection Pass �" \ Fee Fee Pass El Fail El Fee Inspection Pass ❑ Fail ❑ Fee DATE ISSUED: 09 -12 -2011 WORK DESCRIPTION WORK LOCATION OWNER NAME ADDRESS CITY, ST, ZIP PHONE NUMBER CONTRACTOR NAME ADDRESS CITY STATE ZIP FLOOD ZONE BUILDING VALUATION SQUARE FOOTAGE OCCUPANCY TYPE TOTAL FEES CHARGED PROPERTY IDENTIFICATION # PROJECT VALUATION CITY OF TYBEE ISLAND BUILDING PERMIT REPLACE STAIRS/LATTICE UNER 12 NAYLOR AVE TERESA TOWLER PO BOX 1428 TYBEE ISLAND GA 31328 -1428 201 -5235 LEAD DOG BUILDERS LLC PO BOX 480 TYBEE ISLAND GA 31328 P $ 74.00 $2,700.00 PERMIT #: 110515 TOTAL BALANCE DUE: $ 74.00 It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil and sedimentation, wetlands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be approved by the issuance of another building permit. Permit holder agrees to hold the City of Tybee Island harmless on any construction covered by this permit. This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work will be stopped. The building contractor will replace curb paving and gutter broken during construction. This permit will be voided unless work has begun within six months of the date of issuance. Signature of Building Inspector or Authorized Agent: c/zY3 P. 0. Box 2749 - 403 Butler Avenue, Tybee Island, Georgia 31328 (912) 786 -4573 - FAX (912) 786 -9539 www.cityoftybee.org City of 1 ,ee Island • Community Develop. int Dept. Inspection Report 403 Butler Ave. • P.O. Box 2749 • Tybee Island, GA 31328 Phone 912.786.4573 ext. 114 • Fax 912.786.9539 mu' INTERNATIONAL CODE COUNCIL MEMBER Permit No. Date Requested Date Needed Subcontractor Owner's Name Gen. Contractor Contact Information Project Address Scope of Work e17 Inspector Date of Inspection Inspection Pass Fail El Fee ❑ Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee Inspection Pass ❑ Fail ❑ Fee CITY OF TYBEE ISLAND, GEORGIA APPLICATION FOR BUILDING PERMIT Location: �-� -`f L(? (Z NAME ADDRESS PIN # TELEPHONE Owner PA r h D A R - T g-Q R T a WE i - 1 c\ 14 R'1 Lta R Architect or Engineer Building Contractor AN 1 k t: c hi �-?G. &L 1 Li 0_,_. i, 0 E✓ 15 ,o. �A/ 'P40 (Check all that apply) • Repair 171 Residential ❑ Renovation al Single Family ❑ Minor Addition ❑ Duplex ❑ Substantial Addition ❑ Multi- Family ❑ Other ❑ Commercial ❑ Footprint Changes n Discovery n Demolition Details of Project: RPLA C,[ VTA % iZS F--1-1-e2.10 (Z— - LATTI C_a L! ►.l pale [ EA (t Po (c -+ A-(a`E A — OD 4,14A-06f6 a F F a t ri> zu 3 Estimated Cost of Construction: $ a-700. 00 Const tion Typ (Enter appropriate number) (1) Wo• Frame (4) Masonry (6) Other (please specify) (2) Woo.'.& M..onry (5) Steel & Masonry (3) Brick ene r Proposed us Remarks: ATTACH following i # Units Lot Area # Off -str • et parking ' e aces Trees lo. ated & listenyon site plan Access: Drive y Setbac s: Front C fo PY OF THE CERTIFIED ELEVATION SURVEY OF LOT and complete the tion based on the construction drawings and site plan: # Bedrooms # Bathrooms Living space (total sq. ft.) With culvert? With swale? Rear Sides (L) (R) # Stori s Heigh Vertical distance measured from the average adjacent grade s f the building to the xtreme high point of the building, exclusive of chimneys, heating units, ventilation ducts, air co . itioning units, elevators, and similar appurtances. During construction: On -site restroom facilities will be provided through On -site waste and debris containers will be provided by Construction debris will be disposed by by means of I understand that I must comply with zoning, flood damage control, building, fire, shore protections and wetlands ordinances, FEMA regulations and all applicable codes and regulations. I understand that the lot must be staked out and that the stakes will be inspected to ensure that the setback requirements are met. I understand also that a certified plot plan showing elevation must be attached to this application and that an as -built elevation certification is due as soon as the habitable floor level is established. Drainage: I realize that I must ensure the adequacy of drainage of this property so that surrounding property is in no way adversely affected. I accept responsibility for any corrective action that may be necessary to restore drainage impaired by this permitted construction. Date: Signature of Applicant: Note: A permit normally takes 7 to 10 days to process. The following is to be completed by City personnel: Zoning certification Approved rezoning/variance? Street address and number: New Is it in compliance with City map? If not, has street name and/or number been reported to MPC? FEMA Certification attached State Energy Code Affidavit attached Utilities and Public Works: Describe any unusual finding(s) NFIP Flood Zone Existing Access to building site Distance to water main tap site Distance to sewer stub site Water meter size Storm drainage Approvals: Signature Date Zoning Administrator Code Enforcement Officer Water /Sewer Storm/Drainage Inspections City Manager FEES -1 Permit y Inspections I Water Tap Sewer Stub Aid to Const. TOTAL